Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹75.8 LAccepted-AOC | ₹75.8 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹80.6 L+₹4.8 L (6.28%)Rejected-Finance | ₹80.6 L+₹4.8 L (6.28%) | L2 | Rejected-Finance L2 bidder |
| Sl No | Description | Qty | Unit | ABDUL SAMAD P P L1 | L&M INFRA BUILDERS L2 |
|---|---|---|---|---|---|
| 1.00Ground Development Work - Construction of Multipurpose Mud Court | |||||
| 1.01 | 2.28.1: Surface dressing of the ground including removing vegetation and in-equalities not
exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5
m.All kinds of soil | 5,750 | sqm | 32.94 ₹1,89,405 Lowest | 35 ₹2,01,250 |
| 1.02 | OD232437/2025-2026: Filling with contractor's own earth (excluding rock) in open areas in layers not
exceeding 20 cm in depth, consolidating each deposited layer by ramming and
watering and rolling every 3rd and top most layer with power roller of minimum 8
tonnes, for all leads including all lifts involved as per the direction of site Engineer
in-charge. ( Based on DSR Item No. 50.2.26.1 and 2.2.1) | 1,725 | cum | 425 ₹7,33,125 Lowest | 442 ₹7,62,450 |
| 1.03 | OD232438/2025-2026:Supply and installing movable type preium quality outdoor Football Post post 0f size
24x8 ft made of heavyduty MS Pipe of size 4'' dia for main frame with
supports Back frame with PU finishing including all fittings such as premium quality
nylon net, hooks, solid wheels etc for elevens court. | 1 | pair | 79,000 ₹79,000 | 47,250 ₹47,250 Lowest |
| 1.04 | OD232439/2025-2026: Supply and installation of heavy duty badminton post in aluminium and steel uprights option with built in weights and floor protection pads.Base,uprights and back supports can be detached. Rate also includes wheels for easy movement, steel uprights (comes in a pair), badminton net etc. | 1 | pair | 39,000 ₹39,000 | 23,400 ₹23,400 Lowest |
| 1.05 | OD232434/2025-2026: Supply of Fixed 3.5 inch Volleyball post set with net including all necessary fitting, labor, transportation charges etc complete. | 1 | no | 22,000 ₹22,000 Lowest | 24,350 ₹24,350 |
| 2.00Fencing & Kerb | |||||
| 2.01 | 2.8.1: Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | 96.43 | cum | 335.74 ₹32,375.41 Lowest | 353 ₹34,039.79 |
| 2.02 | 4.1.3: Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources). | 7.41 | cum | 8,620.24 ₹63,893.22 Lowest | 9,050 ₹67,078.6 |
| 2.03 | 4.3.1: Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns. | 10.98 | sqm | 309.12 ₹3,394.14 Lowest | 379 ₹4,161.42 |
Tender Value
₹76.6 L
EMD Value
₹50,000
Closing Date
6 Apr 2026, 3:00 pmClosed
Chief Engineer, Sports Kerala Foundation
JIMMY GEORGE INDOOR STADIUM, VELLAYAMBALAM THIRUVANANTHAPURAM
Ground Development Works,Construction of Multipurpose Mud Court,Fencing,Drain,Step Gallery,Inauguration stone and Name Board
2026_SKF_847703_2
599/SKF/CE/2025-26
Open Tender
Civil Works - Others
Item Rate
180 days
Payyannur LAC, Kannur
Please reter tender document
6 documents required · 6 mandatory
₹2,950
₹50,000
30 Jun 2026
26 Mar 2026
7 Apr 2026
26 Mar 2026
6 Apr 2026
26 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Ground Development Work - Construction of Multipurpose Mud Court | |||||
| 1.01 | 2.28.1: Surface dressing of the ground including removing vegetation and in-equalities not
exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5
m.All kinds of soil | - | sqm | - | - |
| 1.02 | OD232437/2025-2026: Filling with contractor's own earth (excluding rock) in open areas in layers not
exceeding 20 cm in depth, consolidating each deposited layer by ramming and
watering and rolling every 3rd and top most layer with power roller of minimum 8
tonnes, for all leads including all lifts involved as per the direction of site Engineer
in-charge. ( Based on DSR Item No. 50.2.26.1 and 2.2.1) | - | cum | - | - |
| 1.03 | OD232438/2025-2026:Supply and installing movable type preium quality outdoor Football Post post 0f size
24x8 ft made of heavyduty MS Pipe of size 4'' dia for main frame with
supports Back frame with PU finishing including all fittings such as premium quality
nylon net, hooks, solid wheels etc for elevens court. | - | pair | - | - |
| 1.04 | OD232439/2025-2026: Supply and installation of heavy duty badminton post in aluminium and steel uprights option with built in weights and floor protection pads.Base,uprights and back supports can be detached. Rate also includes wheels for easy movement, steel uprights (comes in a pair), badminton net etc. | - | pair | - | - |
| 1.05 | OD232434/2025-2026: Supply of Fixed 3.5 inch Volleyball post set with net including all necessary fitting, labor, transportation charges etc complete. | - | no | - | - |
| 2Fencing & Kerb | |||||
| 2.01 | 2.8.1: Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. All kinds of soil. | - | cum | - | - |
| 2.02 | 4.1.3: Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (cement: 2 coarse sand (zone-III) derived from natural sources: 4 graded stone aggregate 20 mm nominal size derived from natural sources). | 1 | cum | - | - |
| 2.03 | 4.3.1: Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columns. | - | sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1433330.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
DWG.pdf
Other Document • 0.83 MB
Retenderdockarivellur.pdf
Tender Documents • 1.36 MB
BOQ_1433330.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .