Tender Value
₹6.3 L
EMD Value
₹12,500
Closing Date
8 Jul 2023, 4:00 pmClosed
Executive Engineer Jal Shakti, PHE Division Samba
Executive Engineer Jal Shakti, PHE Division Samba District Offices Complex Nandni Hills Samba
Please refer BOQ
2023_PHE_218434_6
PHES/37 of 2023-24 Dt. 24-06-2023
Open Tender
Civil Works - Water Works
Item Rate
30 days
Samba
Please refer tender documents
2 documents required · 2 mandatory
₹500
Executive Engineer Jal Shakti (PHE) Division Samba
₹12,500
14 Jul 2023
24 Jun 2023
10 Jul 2023
24 Jun 2023
8 Jul 2023
24 Jun 2023
Amount
(A) Cleaning of 50000 glns capacity OHT at Abtal under WSS AbtalTibba: Actual labour engaged for cleaning of 50000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
(B) Cleaning of 70000 glns capacity OHT at Rarra under WSS Rarra: Actual labour engaged for cleaning of 70000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
Fabrication of joints ,welding including transpotation of plant at site complete By electric Plant ( At OHT)
(C) Cleaning of 20000 glns capacity OHT at Channi under WSS Channi Jakh: Actual labour engaged for cleaning of 20000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
Fabrication of joints ,welding including transpotation of plant at site complete By electric Plant ( At OHT)
(D) Cleaning of 20000 glns capacity OHT at Raya old under WSS Raya old: Actual labour engaged for cleaning of 20000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
Fabrication of joints ,welding including transpotation of plant at site complete By electric Plant ( At OHT)
(E) Cleaning of 20000 glns capacity OHT at Koulpur under WSS Koulpur: Actual labour engaged for cleaning of 20000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
Fabrication of joints ,welding including transpotation of plant at site complete By electric Plant ( At OHT)
(F) Cleaning of 20000 glns capacity OHT at Raika under WSS Raika Labana : Actual labour engaged for cleaning of 20000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
Fabrication of joints ,welding including transpotation of plant at site complete By electric Plant ( At OHT)
(G) Cleaning of 20000 glns capacity OHT at Kalah under WSS Swankha : Actual labour engaged for cleaning of 20000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
Fabrication of joints ,welding including transpotation of plant at site complete By electric Plant ( At OHT)
(H) Cleaning of 20000 glns capacity OHT at Khour Salarian under WSS Khour Salarian : Actual labour engaged for cleaning of 20000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
Fabrication of joints ,welding including transpotation of plant at site complete By electric Plant ( At OHT)
(I) Cleaning of 20000 glns capacity OHT at Balotra Chak under WSS Balotra Chak : Actual labour engaged for cleaning of 20000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
Fabrication of joints ,welding including transpotation of plant at site complete By electric Plant ( At OHT)
(J) Cleaning of 20000 glns capacity OHT at Kotli under WSS Motlian Kalan : Actual labour engaged for cleaning of 20000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
Fabrication of joints ,welding including transpotation of plant at site complete By electric Plant ( At OHT)
(K) Cleaning of 20000 glns capacity OHT at Dug under WSS Dug Channi Fatwal : Actual labour engaged for cleaning of 20000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
Fabrication of joints ,welding including transpotation of plant at site complete By electric Plant ( At OHT)
(L) Cleaning of 20000 glns capacity OHT at Dadyal under WSS Nanga : Actual labour engaged for cleaning of 20000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
Fabrication of joints ,welding including transpotation of plant at site complete By electric Plant ( At OHT)
(M) Cleaning of 20000 glns capacity OHT at Yogpur under WSS Yogpur : Actual labour engaged for cleaning of 20000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
Fabrication of joints ,welding including transpotation of plant at site complete By electric Plant ( At OHT)
(N) Cleaning of 50000 glns capacity OHT at Pakheri under WSS salmeri : Actual labour engaged for cleaning of 50000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
Fabrication of joints ,welding including transpotation of plant at site complete By electric Plant ( At OHT)
(O) Cleaning of 20000 glns capacity OHT at Khanpur under WSS Khanpur : Actual labour engaged for cleaning of 20000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
Fabrication of joints ,welding including transpotation of plant at site complete By electric Plant ( At OHT)
(P) Cleaning of 20000 glns capacity OHT at Rajwal under WSS Rajwal : Actual labour engaged for cleaning of 20000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
Fabrication of joints ,welding including transpotation of plant at site complete By electric Plant ( At OHT)
(Q) Cleaning of 20000 glns capacity OHT at Palota under WSS Palota Ramgarh : Actual labour engaged for cleaning of 20000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
Fabrication of joints ,welding including transpotation of plant at site complete By electric Plant ( At OHT)
(R) Cleaning of 20000 glns capacity OHT at Badayali under WSS Badayali : Actual labour engaged for cleaning of 20000 glns capacity OHT by way of scrubbing of walls and floors of tank to remove the dirts, sediments,fungus and stains by using mixture of bleaching powder and hot water. Wash the tank with pressure jet and agaitankto be filled with fresh water and to be drained out completely. Including making necessary arrangements for lead ,lift and carriage of sludge/slush to safe dumping place and also removing of sluice valve fromwashout pipe and after complete job refixing of sluice valve at washout point including fabrication of pipe joints if required.
Fitter engaged :
Mazdoor engaged
Fabrication of joints ,welding including transpotation of plant at site complete By electric Plant ( At OHT)
M.M. GOVT AND CIVIL CONTRACTOR
M/S AHIT SHARMA
ASHOK KUMAR SHARMA
R.B.Chopra Freighters Pvt. Ltd.
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .