EXECUTIVE ENGINEER ELECTRIC DIVISION BARAMULLA
EXECUTIVE ENGINEER ELECTRIC DIVISION BARAMULLA
Rate Contract for Creation of 100 kVA Sub Station along with laying of HT/LT network at Gujjar Hostal and Bakarwal Hostal Rangwar Baramulla under Capex 2020-21
2021_PDD_118468_1
EDB/73
Open Tender
Electrical Works
Item Rate
15 days
Rate Contract for Creation of 100 kVA Sub Station
Please refer Tender documents.
6 documents required · 6 mandatory
₹206
Yes
EXECUTIVE ENGINEER ELECTRIC DIVISION BARAMULLA
Exempted
16 Mar 2021
26 Feb 2021
10 Mar 2021
26 Feb 2021
9 Mar 2021
27 Feb 2021
26 Feb 2021 - 27 Feb 2021
Supply,Carraige upto site, Installation, testing and Commissioning of 11/0.433KV,100 KVA 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2
Supply,Carraige upto site, Erection, testing and commissioning of 09 mtr long Steel Tubular Pole with planting depth of 1/6th of the height of the pole, (9 mtr. Long ) (ST-410 SP33)
Supply,Carraige upto site, Erection, testing and commissioning of 08 mtr long Steel Tubular Pole with planting depth of 1/6the of the height of the pole, (8 mtr. Long ) (ST-410 SP15)
Supply,Carraige upto site, stringing, tensioning, binding of ACSR Conductor, (50sqmm ACSR Conductor)
Carraige upto site, Installation, testing and Commissioning of 11/0.433KV,100 KVA 3-phase Distribution Transformers with Bimetallic Terminal Connectors Energy Level-2
Carraige upto site, Erection, testing and commissioning of 09 mtr long Steel Tubular Pole with planting depth of 1/6th of the height of the pole, (9 mtr. Long ) (ST-410 SP33)
Carraige upto site, Erection, testing and commissioning of 08 mtr long Steel Tubular Pole with planting depth of 1/6the of the height of the pole, (8 mtr. Long ) (ST-410 SP15)
Carraige upto site, stringing, tensioning, binding of ACSR Conductor, (50sqmm ACSR Conductor)
Supply,Carraige upto site, and fixing of MS Channel Iron x-arm 9' long 100x50x6mm including suitable clamps/collars 02 No.
Supply,Carraige upto site, and fixing of MS Channel Iron x-arm 9' long 75x40x6mm including suitable clamps/collars 08 No.
Supply,Carraige upto site, and fixing of MS Channel Iron x-arm 10' long 50x50x6mm including suitable clamps/collars 02 No.
Supply, Carriage up to site, Installation, testing and Commissioning of 11 KV Pin Insulators (Porcelain with Pins (5KN)
Supply, Carriage up to site, Installation, testing and Commissioning of 11 kV G.O AB Switch , 3-phase, 3 pole 400A polymer Stn. Type
Supply, Carriage up to site, Installation, testing and Commissioning of of 11 kV D O Fuse 3phase 400A polymer Stn. Type
Supply, Carriage up to site, Installation, testing and Commissioning of Gapless Surge Arrestor,9 KV ,10 KA ,LA with polymer Stn. Type
Supply, Carriage up to site, Installation, testing and Commissioning of LT Fuse Sets (Pre-fabricated)
Supply, Carriage up to site, laying , stringing, tensioning, binding of of AB Cable (3x50+1x35) Sq mm (Reputed make)
Supply, Carriage up to site, Installation, testing and Commissioning of 125 A MCCB with Box
Supply, Carriage up to site, Installation, testing and Commissioning of 3 Phase prodigy meter as per IS Standard
Supply, Carriage up to site, laying , stringing, tensioning, binding of 1.1 KV grade, 185 sq-mm 1-core PVC Cable
Supply, Carriage up to site, Installation, testing and Commissioning of 185 Sqmm Aluminum Thimbles
Supply, Carriage up to site, Installation, testing and Commissioning of Galvanized Stay Set with 50x8mm stay clamp, guy insulator(2Nos.), anchor plate (200x 200 x 6 mm), nut-bolts, 2 Nos turn-buckles, 1.8m long, 16 mm diameter solid GS stay rod & 7/3.15 mm dia GI stranded wire complete
Supply, Carriage up to site, Installation, testing and Commissioning of M. S Flat (50x6 mm), LT Structure Mukhi type including LT Shackle insulators (Porcelain 16 KN) as per REC Standard
Supply, Carriage up to site, and fixing of MS nuts and bolts of sizes
Supply, Carriage up to site, and fixing of Substation Sign board
Supply, Carriage up to site, and fixing of Danger Plate
Painting of 8/9 MTR ST Poles with two coats of Red Oxide and one coat of aluminum paint
Cement bottoming 1:2:4 mix as per REC standards 0.5cum/pole (Pit 600x600x1600 mm) for 9 MTR ST Pole
Providing , commissioning of Earthing of ST Poles complete by 8SWG GI Wire closely wound 115 turns, spiral spring length 450mm & width 50 mm as per REC Standards
Earthing of substation --Excavation of earth pit of dia 650 mm & depth 3000 mm, installation of Earthing pipe of 40 mm Nominal bore & 4mm wall thickness & length 2.5 mtr long as Per IS 1239.GI Strip for neutral earthing of size 75 mmx10 mm & 50 mmx6 mm for connection of transformer body, G.O Set & lightening arrestor as per IS 2629/85, GI nuts & bolts, refilled with earth enhancement materials and earth Chamber made of brick masonry with RCC slab cover.
TRUE CONSTRUCTIONS
RATHER EELCTRICAL CONTRACTORS ADN SUPPLIERS
M/s AHMADULLA AND SONS
M.B.TRADING COMPANY
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .