Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | -37.92% | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.7 L+₹71,866.47 (14.5%)Admitted-Finance | -28.94% | ₹5.7 L+₹71,866.47 (14.5%) | L2 | Admitted-Finance |
Tender Value
₹8 L
EMD Value
₹16,000
Closing Date
18 Jun 2026, 6:00 pmClosed
xen
kalakote
Permanent Restoration of Foot Jullah Bridge at Treru.
2026_PWDJK_311835_2
eNIT No 17 of 2026/27 dated 08/06/2026
Open Tender
Civil Works
Percentage
30 days
kalakote
Please refer Tender documents.
3 documents required · 3 mandatory
₹600
xen
₹16,000
14 Sept 2026
8 Jun 2026
19 Jun 2026
8 Jun 2026
18 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: 2.9.1 All kinds of soil : 60% O.R 20% H.R 20% | 13 | Cum | 494.98 | ₹6,434.74 |
| 2 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:5:10 (1 cement : 5 coarse sand : 10 graded stone aggregate 40 mm nominal size) | 1.8 | cum | 4,826.5 | ₹8,687.7 |
| 3 | Providing and laying in position cement concrete of specified grade including curing butexcluding the cost of centring and shuttering. All work upto plinth level with:s1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size) | 6 | cum | 5,733.6 | ₹34,401.6 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level
5.1.2 1:1½:3 (1 cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size) | 33 | cum | 7,788.4 | ₹2,57,017.2 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level 5. Cold twisted bars | 3,300 | Kg | 123.2 | ₹4,06,560 |
| 6Centering and shuttering including strutting, propping etc. and removal of form for: | |||||
| 6.1 | Foundations, footings, bases of columns etc. for mass concrete | 138 | Sqm | 286.35 | ₹39,516.3 |
| 7Carriage of material by mechanical transport from source to the site of work including loading/unloading and stakcing complete. | |||||
| 7.1 | Sand for an av. 05 Kms disntace.&500mtr by H.L | 20 | Cum | 794.62 | ₹15,892.4 |
| 7.2 | Stone Agregate bajree 05km distance &500mtr by H.L | 40 | Cum | 794.62 | ₹31,784.8 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.94 MB
BOQ_1009577.xls
BOQ • 1.77 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .