Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.7 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹9.4 L+₹1.7 L (22.5%)Rejected-Finance | L2 | Rejected-Finance BEING NOT LOWEST | |
| 3 | L3₹9.8 L+₹2.1 L (27.9%)Rejected-Finance PLOT NO 19 PAOTA C 3RD ROAD JODHPUR 342001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | L3 | Rejected-Finance BEING NOT LOWEST | |
| 4 | L4₹10.2 L+₹2.5 L (33.2%)Rejected-Finance 224 OFFICERS ENCLAVE BEHIND PLV MEMORIAL COLLAGE SHIKARGARH ARMY AREA JODHPUR RAJ 342001 | JODHPUR | JODHPUR | RAJASTHAN | 342001 | L4 | Rejected-Finance BEING NOT LOWEST |
| Sl No | Description | Qty | Unit | D DEV COMPANY L2 | Hariom Construction Company L4 | New Vishvakarma Udhyog L3 | Savitri Enterprises L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Excavating over areas, n. exc 1.5m deep and getting out (soft/loose soil) including forming surfaces to required level/slope complete all as specified and as directed by Engineer-in-Charge. | 118.81 | Cum | 300 ₹35,643 | 153 ₹18,177.93 | 125 ₹14,851.25 Lowest | 300 ₹35,643 |
| 2.00 | Demolition of cement concrete (unreinforced) in ground floors and pavings n. exc. 15 cm thickness (below or above ground level) all as specified and directed. | 16 | Cum | 450 ₹7,200 | 233 ₹3,728 Lowest | 300 ₹4,800 | 400 ₹6,400 |
| 3.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sqm on plan and n exc 1.5 m in depth and getting out as soft soil all as specified and directed. | 11 | Cum | 250 ₹2,750 | 183 ₹2,013 | 150 ₹1,650 Lowest | 300 ₹3,300 |
| 4.00 | Removing excavated material/ all kind of soils exc. 1.50 km but n exc. 5 km and depositing all as specified and directed by Engr -in -Charge | 162.91 | Cum | 150 ₹24,436.5 | 23 ₹3,746.93 Lowest | 100 ₹16,291 | 100 ₹16,291 |
| 5.00 | Rolling and consolidationg formation surfaces in cutting with 8 to 12 tonne power road roller to achieve 98% modified proctorvdensity including filling the depression which occurs during the process of rolling to required level, gradient, camber and superelevtion etc, including watering as necessary complete all as specified and as directed by Engineer-in-Charge. | 34.68 | X Sqm | 600 ₹20,808 | 593 ₹20,565.24 | 200 ₹6,936 Lowest | 200 ₹6,936 Lowest |
| 6.00 | M&L 150 mm thick (compacted thickenss) Granular Sub-base of shingle or Gravel in double layer(75mm each) as per Table 400-1 of MoRTH specification fifth edition spread rolled and consolidated to gradient and camber required over compacted sub-grade complete all as specified and directed. | 34.68 | X Sqm | 1,800 ₹62,424 | 4,833 ₹1,67,608.44 | 2,500 ₹86,700 | 1,600 ₹55,488 Lowest |
| 7.00 | M&L for laying 150mm thick (compacted thickness) WMM in two layers (75mm each layers), using grading requirement as per Table 400-13 of MoRTH specifications fifth edition and rolled with vibratory type power roller of 8-12 tonne capacity to required camber and gradient including spreading rolling and consolidating complete all as specified and directed by the Engineer-in-Charge | 34.68 | X Sqm | 2,100 ₹72,828 | 1,833 ₹63,568.44 | 2,000 ₹69,360 | 1,600 ₹55,488 Lowest |
| 8.00 | Material & labour for preparing WMM surfaces by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all dust tec, and applying evenly a priming/ tack coat with bituminous primer of paving bitumen at 10 kgs per 10 Sqm | 34.68 | X Sqm | 1,000 ₹34,680 | 223 ₹7,733.64 Lowest | 300 ₹10,404 | 300 ₹10,404 |
| 9.00 | Material & labour for preparing block top surfaces by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all dust tec, and applying evenly a priming/ tack coat with bituminous primer of paving bitumen at 5 kgs per 10 Sqm | 34.68 | X Sqm | 1,000 ₹34,680 | 123 ₹4,265.64 Lowest | 200 ₹6,936 | 200 ₹6,936 |
| 10.00 | M & L for Premix bituminous, macadam laid/rolled and compacted to required gradient and camber (consolidated thickness 75mm or less) using Paving bitumen (VG-30), binder content @ 4.0% by weight of total mix ,rolled and compacted with 8 tonne to 12 tonne power road roller to requried gradient and camber using full width mechanical sensor paver with string sensor (Preparation of surface and priming/tack coat shall be measured & paid separately). | 17.34 | Cum | 6,500 ₹1,12,710 Lowest | 6,853 ₹1,18,831.02 | 11,000 ₹1,90,740 | 8,000 ₹1,38,720 |
Tender Value
₹9.7 L
EMD Value
₹19,500
Closing Date
15 Oct 2026, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CWE (AF) Jodhpur
HQ CWE AF JODHPUR Opp Mosam Vibhag Airforce Chauraha , Ratanada Jodhpur (Raj)-342011
PROVISION OF APPROACH ROAD /PATH AT CERTAIN LOCATION UNDER GE (AF) NO 02 JODHPUR AT AFS JODHPUR
2026_MES_790083_1
89193/E8
Open Tender
Civil Works
Item Rate
180 days
GE (AF) No 2 Jodhpur
As per NIT
8 documents required · 8 mandatory
₹500
GE (AF) No 2 Jodhpur
₹19,500
Yes
23 Oct 2026
18 Sept 2026
17 Oct 2026
18 Sept 2026
15 Oct 2026
3 Oct 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Excavating over areas, n. exc 1.5m deep and getting out (soft/loose soil) including forming surfaces to required level/slope complete all as specified and as directed by Engineer-in-Charge. | 118.81 | Cum | - | - |
| 2 | Demolition of cement concrete (unreinforced) in ground floors and pavings n. exc. 15 cm thickness (below or above ground level) all as specified and directed. | 16 | Cum | - | - |
| 3 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sqm on plan and n exc 1.5 m in depth and getting out as soft soil all as specified and directed. | 11 | Cum | - | - |
| 4 | Removing excavated material/ all kind of soils exc. 1.50 km but n exc. 5 km and depositing all as specified and directed by Engr -in -Charge | 162.91 | Cum | - | - |
| 5 | Rolling and consolidationg formation surfaces in cutting with 8 to 12 tonne power road roller to achieve 98% modified proctorvdensity including filling the depression which occurs during the process of rolling to required level, gradient, camber and superelevtion etc, including watering as necessary complete all as specified and as directed by Engineer-in-Charge. | 34.68 | X Sqm | - | - |
| 6 | M&L 150 mm thick (compacted thickenss) Granular Sub-base of shingle or Gravel in double layer(75mm each) as per Table 400-1 of MoRTH specification fifth edition spread rolled and consolidated to gradient and camber required over compacted sub-grade complete all as specified and directed. | 34.68 | X Sqm | - | - |
| 7 | M&L for laying 150mm thick (compacted thickness) WMM in two layers (75mm each layers), using grading requirement as per Table 400-13 of MoRTH specifications fifth edition and rolled with vibratory type power roller of 8-12 tonne capacity to required camber and gradient including spreading rolling and consolidating complete all as specified and directed by the Engineer-in-Charge | 34.68 | X Sqm | - | - |
| 8 | Material & labour for preparing WMM surfaces by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all dust tec, and applying evenly a priming/ tack coat with bituminous primer of paving bitumen at 10 kgs per 10 Sqm | 34.68 | X Sqm | - | - |
| 9 | Material & labour for preparing block top surfaces by brushing with wire brushes for removing caked mud etc sweeping with brooms and finally fanning the cleaned surface with gunny bags to remove all dust tec, and applying evenly a priming/ tack coat with bituminous primer of paving bitumen at 5 kgs per 10 Sqm | 34.68 | X Sqm | - | - |
| 10 | M & L for Premix bituminous, macadam laid/rolled and compacted to required gradient and camber (consolidated thickness 75mm or less) using Paving bitumen (VG-30), binder content @ 4.0% by weight of total mix ,rolled and compacted with 8 tonne to 12 tonne power road roller to requried gradient and camber using full width mechanical sensor paver with string sensor (Preparation of surface and priming/tack coat shall be measured & paid separately). | 17.34 | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
Tender.pdf
Tender Documents • 4.62 MB
BOQ_885682.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .