Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance FLAT NO A 1108 TOWER P 2 ASHIYANA PALM COURT RAJNAGAR EXTENSION GHAZIABAD UP | GHAZIABAD | UTTAR PRADESH | 201001 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
14 Dec 2021, 3:00 pmClosed
Superintending Engineer
Electricity Distribution Circle,Rudrapur(U.S. Nagar )
Mainteance of 2x10MVA power transformer and other related in 33/11KV. S/s, Matkota under EDD,Rudrapur.
2021_UPCL3_38835_1
EDC(USN)27/2021-22
Open Tender
Electrical Works
Item Rate
90 days
Rudrapur
Pl. refer tender documents.
3 documents required · 3 mandatory
₹1,180
SE,EDC,Rudrapur
Exempted
6 Jan 2022
24 Nov 2021
15 Dec 2021
24 Nov 2021
14 Dec 2021
24 Nov 2021
Amount
Annexure -A ( Works )
Charges for cleaning and leveling of yard by digging upto 8 inch. below to existing trench top level safely without damaging earthing mat( network)As per direction of Engineer-In-Charge.
P.C.C. Work on yard ground gy CC mixture 1:4:8 including cost of cement, sandand stone ballast upplied by contractor 35M.x35M.x4 inch( 124 cu. Meter ) As per direction of Engineer-In-Charge.
Providing of stone gravel 20mm. On PC.C. work equally(4inch. Hight)As per direction of Engineer-In-Charge.
Reparing of existing trehch for power cables by A Class brick and P.C.C. work. As per direction of Engineer-In-Charge.
Construction of new trench( 1000x450mm) for power cable by A Class brick work. As per direction of Engineer-In-Charge.
Digging safely for removing 11KV.cable of Dineshpur and Transit Camp Rudrapur. As per direction of Engineer-In-Charge.
Laying 11KV. Cables into new trench after feeling of sand into trench. As per direction of Engineer-In-Charge.
Providing /making of trench cover ( 1000mm.x500mm.) with help of fabrication by M.S. Angle and M.S. bar and RCC in ratio 1:2:4 complete.
Reparing of trench ( 500mm. X 500mm) for control Cables by A Class brick work and CC work including proding of trench coveet made by fabrication of M.S. Angle and M.S. Bar with R.C.C. As per direction of Engineer-In-Charge.
Charges for removing/drainout of power transformer Oil into drums and dismentling of radiators and lv/hv bushing and other valve assembly( drain,buckose, consdervator etc) ( 2x10MVA)As per direction of Engineer-In-Charge.
Charges for centrifusing of power transformer oil ( 2x10MVA)As per direction of Engineer-In-Charge.
Charges of providing and fixing of new gasket, cork sheet and bushing ball( 2x10MVA) completeAs per direction of Engineer-In-Charge..
Charges for top up of oil into power transformer and assmebling of all accessories complete l( 2x10MVA) As per direction of Engineer-In-Charge.
Charges of disconnection and reconnection of lv/hv side cables and complete testing of transformer ( 2x10MVA)As per direction of Engineer-In-Charge.
J AND J COMPANY
Yusuf Hussain Contractor
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .