Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
20 Feb 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
PARAU MURMU
MES DEPT ROOM NO 25 ADMIN BUILD RCF LTD CHEMBUR MUMBAI-400074
Biennial Maintenance work for various electrical Equipment in PAP/SAP/CAN-E at RCF Ltd, Trombay Unit
2021_RCFL_614192_1
ET - MES/305/L/2021/316
Open Tender
Miscellaneous Services
Item Rate
730 days
MES DEPT ROOM NO 25 ADMIN
AS PER NIT
9 documents required · 9 mandatory
₹0
Exempted
20 Feb 2021
5 Feb 2021
20 Feb 2021
5 Feb 2021
20 Feb 2021
5 Feb 2021
120 days
Amount
1-MOTORS
1.11-Motors body cleaning up to 25HP
1.12-Motors body cleaning up to above 25HP to 50 HP
1.13-Motors body cleaning up to above 50HP to 100 HP
1.14-Motors body cleaning up to above 100HP to 200 HP
1.15-Motors body cleaning up to above 200 HP
1.16-De-Coupling / Re- coupling of motor up to 25HP
1.17-De-Coupling / Re- coupling of motor above 25HP up to 50HP
1.18-De-Coupling / Re- coupling of motor above 50HP up to 100HP
1.19-De-Coupling / Re- coupling of motor above 100HP up to 200HP
1.2-De-Coupling / Re- coupling of motor above 200HP
1.21-Motor end cover cleaning
1.22-Motor labyrinth cleaning
1.23-Motor grease cup cleaning
1.24-Motor fan cover cleaning
1.25-Motor fan cleaning
1.26-Motor greasing
1.27-Motors up to weight 100Kgs shifting from plant workshop/maintenance bay and vice-versa
1.28-Motors weight above100Kgs and up to 300Kgs shifting from plant workshop/maintenance bay and vice-versa
1.29-Motors weight above300Kgs and up to 600Kgs shifting from plant workshop/maintenance bay and vice-versa
1.3-Motors weight above 600Kgs and up to 1000Kgs shifting from plant workshop/maintenance bay and vice-versa
1.31-Motors Body Painting
1.32-Applying mermaid compound, polythene to T.B. of motors
1.33-HT Motors cooling tubes cleaning
1.34-Dismantling of motors up to 10 HP & cleaning its parts ,mounting new bearing on rotor and assembly of the motor
1.35-Dismantling of motors from 10 HP to 22 HP & cleaning its parts ,mounting new bearing on rotor and assembly of the motor
1.36-Dismantling of motors from 22 HP to 60 HP & cleaning its parts ,mounting new bearing on rotor and assembly of the motor
1.37-Dismantling of motors from 60 HP to 100 HP & cleaning its parts ,mounting new bearing on rotor and assembly of the motor
1.38-Dismantling of motors from 100 HP to 200 HP & cleaning its parts ,mounting new bearing on rotor and assembly of the motor
2-Scrap material & housekeeping
2.1-Segregation of scrap material
2.2-Returning of this scrap material to scrap yard
3-Transformer
3.1-Cleaning transformer radiator
3.2-Cleaning of surface of transformer tank
3.3-Cleaning of Marshaling box cover
4-Miscellaneous
4.1-Shifting of heavy tools interplant up to 200kg
4.2-Shifting of heavy coupling/material to Mechanical workshop up to 200 Kg.
4.3-Shifting of Bearing heater interdepartmental
4.4-Shifting new material from electrical store to plant store up to 200kg
5-Switchgears
5.1-Dedusting and cleaning of switchgear cubicles
5.2-Dedusting and cleaning of VFD panels
5.3-Dedusting and cleaning of charger panels
5.4-Dedusting and cleaning of Breaker panels
5.5-Dedusting and cleaning of Lift cabins
6.1-Cleaning of ceiling fans
6.2-Cleaning of wall mounted fan and blades along with its cover
6.3-Cleaning of Pedestal fan and blades along with its cover
7-Light Fittings
7.1-Cleaning of light fittings
7.2-shifting of ladder at site ,fixing and again keeping at store after job completion
7.3-Shifting of temporary light fittings in plant at various locations
7.4-Shifting of fittings or motor to workshop for repair/ rewinding
7.5-cleaning of junction boxes
Sahani Engineering Service
Smet Construction Compant
Mepico Fabricators
sai tech engineering construction
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .