Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹23.1 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹27.0 L+₹3.9 L (17.1%)Accepted-AOC | L2 | Accepted-AOC L2 | |
| 3 | L3₹28.0 L+₹4.9 L (21.4%)Accepted-AOC SANTHOSH BHAVAN PADAMUGAL KOCHI PIN 682030 | KOCHI | ERNAKULAM | KERALA | 682030 | L3 | Accepted-AOC L3 | |
| 4 | L4₹28.0 L+₹5.0 L (21.5%)Accepted-AOC | L4 | Accepted-AOC L4 | |
| 5 | L5₹33.7 L+₹10.7 L (46.2%)Accepted-AOC NULL | L5 | Accepted-AOC L5 |
Tender Value
₹28.7 L
EMD Value
₹50,000
Closing Date
22 Feb 2022, 2:00 pmClosed
Executive Engineer
Office of the Executive Engineer PWD Bridges Division Ernakulam at Thrikkakara 682021
GENERAL-Nettoor Kadavanthra Bridge across Chambakkara canal in Ernakulam Distict-Investigation for the Construction of Bridge-Investigation Work
2022_PWD_473801_1
PWD/BR/TR/95050/2021_3_1/1
Open Tender
Civil Works - Bridges
Item Rate
120 days
Nettoor-Kadavantra Ernakulam District
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹50,000
Yes
4 May 2022
10 Feb 2022
24 Feb 2022
10 Feb 2022
22 Feb 2022
10 Feb 2022
Amount
Investigation
56.1.a:Mobilization including transportation of all necessary plant and equipment's and materials of boring, field testing and sampling and demobilization after completing the work - For machine boring
56.2.a:Setting up boring at each bore hole locations including carrying all necessary plant, equipment and materials of boring and field tests and collection of samples at each bore hole location - For machine boring.
56.9.1:Erecting platform over 2 nos of 2nd Class Boat using Mango wood planks of not less than 30 mm thick, Mango wood joists of 100 mm x 70 mm at 60 cm intervals including labour and hire of all materials and dismantling the platform after completion of work etc complete. excluding hire of boats (A Platform of minimum size 6.00 m x 5.00 m will be required)
56.10:Hire charges for providing 2 nos of 2nd Class boat with boatman for erecting the platform over which the boring plant is to be erected, and 1 no of 2nd Class boat with 1 boatman for conveying the departmental staff and labour engaged from the banks to platform and back etc.
56.3.a.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.b.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.c.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
56.3.d.1:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For ordinary soil.
OD44212/2021-2022:Boring with rotary power drilling equipment in all types of soil having N value greater than 50 excluding hard rock soft rock, or medium rock for strata at any depth including conducting necessary S.P.T and recovery of undisturbed soil samples at intervals in ordinary soil in land (Data approved by CE administration from KHRI)
56.3.a.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata upto 10m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.3.b.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 20m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.3.c.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata next 10m and upto a depth of 30m including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
56.3.d.2:Boring with rotary power drilling equipment's in - all types of soil having N value less than 50 excluding hard rock, soft rock or medium rock for strata above 30m depth including conducting necessary S.P.T and recovery of undisturbed soil samples at 5m intervals - For under water.
OD21485/2021-2022:Boring with rotary power drilling equipment in all types of soil having N value greater than 50 excluding hard rock soft rock, or medium rock for strata at any depth including conducting necessary S.P.T and recovery of undisturbed soil samples at intervals in ordinary soil in water(Data approved by CE administration from KHRI)
56.8:Recovering disturbed samples and preserving the same in air tight sample containers including waxing labelling packing storing including cost of containers as per IS Code.
56.13:Providing access to the site clearing site and making good for surveying in order to provide clear line of site devoid of any hindrance due to vegetation etc. and clearing areas for station points (This item is applicable only for sites without access such as in case of new road formation, bridge and building sites at in accessible locations).
56.12.b:Total station surveying and preparation of site plan - Plain built up area with hindrance to line of sight due to buildings/structures.
56.14.a:Cross sectional details - River.
56.15.a:Hydraulic Velocity Calculation - River.
OD19119/2021-2022:Taking FLY LEVELS- from the nearest GTS BM and closing on the starting BM including conveyance of instruments etc along road or in heavily built up area or in roads with heavy traffic or in thick jungle ( out turn 4000 m / day )
OD19120/2021-2022:Supplying and fixing TBM with RCC 1:1.5:3 pillar block having a size of 30*30*75 cm, steel reinforcement for RCC work, painting top and sides of pillar with synthetic enamel paint, lettering in the pillar block with 8cm high "TBM" on one face and the reduced level on the outer face, etc complete, fixed in CC1:3:6 using 40 mm metal 55*55*60 cm etc complete and centering and shuttering including strutting , propping and removal of form work for pillar and foundation.
56.11.a:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring for 5 bore holes.
56.11.c:Compilation of all field data with recommendation for a suitable foundation after conducting necessary lab test (report in triplicate) - Machine boring - Extra for additional set for bore holes exceeding 5 nos.
56.16:Preparation of Detailed Project Report of the bridge works containing alignment plan, key plan, contour plan , index map, longitudinal and cross section of road and River/Thodu cross section of bridge hydraulic and velocity calculations including neat filing and supplying five set DPR etc. as per the directions of the departmental officers.
OD45034/2021-2022:Testing charges for CBR test for soil samples collected from the site in the Laboratory including charges of Labour engaged for conducting the test in Lab etc. including the collection of subgrade soil samples carefully by excavating the pit for laboratory test and refilling back and compacting the excavated pit to line and levels with excavated earth as directed by the departmental officers at site etc. complete.
Esteem Developers (P) Limited
AA AND S CONSTRUCTIONS
Synergy Architects and Engineers
G S Infrastructure
Bidder Name
JAYAPRAKASH. TS
Esteem Developers (P) Limited
G S Infrastructure
AA AND S CONSTRUCTIONS
Synergy Architects and Engineers
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_679640.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .