Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.7 LAccepted-AOC | L1 | Accepted-AOC AOC | |
| 2 | L2₹10.6 L+₹96,897.79 (10.0%)Rejected-Finance | L2 | Rejected-Finance Secoundlowestbidder | |
| 3 | L3₹10.6 L+₹99,482.47 (10.3%)Rejected-Finance | L3 | Rejected-Finance thiredlowestbidder | |
| 4 | L4₹11.1 L+₹1.5 L (15.0%)Rejected-Finance | L4 | Rejected-Finance fourthlowestbidder |
Tender Value
₹12.9 L
EMD Value
₹32,299
Closing Date
25 Jan 2024, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
AEE ,LID and EW Subdivision Vellanad
AEE ,LID and EW Subdivision Vellanad
Annual Plan-2023-24/VLND BP- Constrution of Bridge and Side Wall Concrete at Kurinchilakkadu in Vellanad BP-SO-239/23-24
2024_LSGD_645697_5
658(XII)/AEE/LSGD/VBP/2024
Open Tender
Civil Works - Roads
Item Rate
180 days
Vellanad BP
Please refer Tender documents
7 documents required · 7 mandatory
₹2,760
Yes
₹32,299
Yes
12 Mar 2024
18 Jan 2024
29 Jan 2024
18 Jan 2024
25 Jan 2024
18 Jan 2024
Amount
Bridge
11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth
OD280228/2023-2024:Bailing out water using 5HP engine and pump set including conveyance to site and erection and cost of fuel, lubrication oil and other stores, pay of staff etc, Complete.
OD280229/2023-2024:Putting up ring bund as per approved shape 2.5m bottom width, 1m top wide using empty gunny polythene bag filled with earth placed in two rows at 0.60m apart and filled in between with puddle clay to form bund for an average height 2m including labour, dismantling the bund after completion of the work etc. complete.
11.4.1.1:Providing concrete for plain/reinforced concrete in open foundations complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 I. P.C.C grade M 10 (i) Nominal mix 1:3:6
12.5.1.1:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m I. P.C.C grade M 15 (i) Nominal mix (1:2.5:5)
OD280230/2023-2024:PVC Weep Holes- Providing weep holes using 63mm dia PVC pipes working pressure 4kg/sq.cm including cost of materials, conveyance
12.5.3:Plain/reinforced cement concrete in substructure complete as per drawings and technical specification Clauses 802, 804, 805, 806, 807, 1202 ans 1204 For height upto 5 m III. R.C.C grade M 20
12.7:Supplying, fitting and placing TMT bar reinforcement (Fe 415) in substructure complete as per drawings and technical specification Clauses 1002, 1005, 1010 & 1202
14.8:Providing and laying of dry rubble flooring complete as per drawings and technical specifications Clause 1303.3
75.8.1.1.A:Providing Plain cement concrete for wearing coat CC 1:2:4 (1 cement: 2 fine aggregate:4 course aggregate) laid to required slope as required including compaction, finishingand tamping etc .complete. Max. size of course aggregate not exceeding 25mm , mixedin concrete mixer etc complete as per specification (i) Nominal mix (1:2:4)
13.1.2:Providing and laying reinforced cement concrete in superstructure as per drawing and technical specifications Clauses 800, 1205.4 and 1205.5R.C.C M 25
13.3:Supplying, fitting and placing TMT bar reinforcement in superstructure complete as per drawing and technical specifications Clauses 1002,1010 and 1202
Construction of Side wall, Road and Road Concrete
2.7.D:Dismantling Stone Masonry as per Technical Specification Clause 202. Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of stone masonry, including disposal of unserviceable material and stacking the serviceable material with all lift and lead of 1000 m as per Technical Specification Clause 202. (D) Dry Rubble Masonry
11.1.1.1:Excavation for Structures Earthwork in excavation for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material. I. Ordinary soil (i) Upto 3 m depth
75.7.1:DRY RUBBLE MASONRY with hard stone, including Through/Bond stone in foundation and superstructure including packing to compactness to lines and levels, cost and conveyance of all materials labour charges etc. complete as per approved drawing and relevant technical specifications.
OD306111/2023-2024:Using Departmental Stone masonry for foundation and super structure complete as per drawing & technical specification clause 702,704,1202 and 1204 Random rubble dry stone masonry
12.4.3.2:Stone masonry in cement mortar for substructure complete as per drawing & technical specification Clauses 702, 704, 1202 and 1204<br> III. Random rubble masonry <br>(ii) In 1:4 cement mortar
75.8.1.1:Providing plain/reinforced concrete(1 cement:2 fine aggregate: 4 course aggregate) forsubstructure as per drawings and technical specifications Clause 802, 803, 1202 & 1203as required including compaction, finishing and tamping etc .complete. Max. size ofcourse aggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
11.8:Supplying, fitting and placingTMT bar reinforcement in foundation complete as per drawings and technical specifications Clauses 1000 and 1202
12.3:Plastering with cement mortar (1:4), 15 mm thick on brickwork in substructure as per technical specification Clauses 613.4 & 1204
OD280223/2023-2024:Construction of Embankment with material obtained from borrow pits - Manual compaction construction of embankment with approved material obtained from borrow pits with a lift up to 1.50 m, transporting to site, spreading, grading to required slope and compacting to meet required slope and compacting to meet requirement of Tables 330.1 and 300.2 with a lead up to 1000m as per Technical Specification clause 301.5
OD280225/2023-2024:Surface dressing of the ground including removing vegetation and in equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m
OD280224/2023-2024:Filling up low lying and water logged areas with local material/quarry muck, spreading in layers, leveling the top at site and consolidation by ramming, etc complete for improving the CBR value of sub grade.
75.8.1:Providing Plain cement concrete for road work CC 1:2:4 (1 cement: 2 fine aggregate: 4course aggregate) laid to required slope and camber in panels (@ 3 m c/c) as requiredincluding compaction, finishing and tamping etc .complete. Max. size of courseaggregate not exceeding 25mm , mixed in concrete mixer etc complete as perspecification (i) Nominal mix (1:2:4)
10.7:Painting on Concrete/Steel Surfaces with Epoxy Painting two coats including prime coat with epoxy paint of approved brand on concrete/steel surfaces after through cleaning of surface to give an even shade as per drawing and Technical Specification Clause 1701
OD306500/2023-2024:Supplying and fixing name board 75 x 60 cm Granite plaque engraving letters etc, complete as per the direction of engineer in charge
Gopi S
V ANILKUMAR
Jayakumar N
Bidder Name
Gopi S
Jayakumar N
V ANILKUMAR
AJITHKUMAR P
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_989275.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .