Loading…
Loading…
Tender Value
₹37.9 L
EMD Value
₹37,930
Closing Date
20 May 2026, 4:00 pmClosed
Superintending Engineer, Transmission Circle GETCO Jambuva
Bi-Annual Rate Contract for the year of 2026-28 for the work of Transportation of any sub-station / line materials from various Store / Sub-station of GETCO to various store / sub-station / line site of GETCO including Loading, Unloading and Stacking of material on as and when required basis under Jambuva Circle
299535
JTC/ 25- 26 / n-03
Open
Electrical
Works
Vadodara
12 documents required · 12 mandatory
₹1,180
Gujarat Energy Transmission Corporation Limited
₹37,930
29 Apr 2026
29 Apr 2026
29 Apr 2026
20 May 2026
29 Apr 2026
Name of work : Bi-Annual Rate Contract for the year of 2026-28 for the work of Transportation of any sub-station / line
materials from various Store / Sub-station of GETCO to various store / sub-station / line site of GETCO including Loading,
Unloading and Stacking of material on as and when required basis under Jambuva Circle
TECHNICAL SPECIFICATION
(to be submitted on line through n-code only)
Seal & Signature of Bidder
TENDER NOTICE No – JTC/ 26-27 / n-
Superintending Engineer, Transmission Circle GETCO Jambuva ( Address of the office - Gujarat Energy Transmission
Corporation Limited, Circle Office, 220kv Jambuva sub-station compound, N.H. No-8, PO:- Jambuva, Tal & Dist: Vadodara.-
390 014 ) invites “On line Tenders” (e-tendering) for the purchase/ works of following items. Tender Papers & Specifications
may be down loaded from Web site https://tender.nprocure.com (For view, down load and on line submission) and
GUVNL/GETCO web site www.guvnl.com (For View & download only).
All tender documents, scanned copies of original documents (Notarized / self-attested copies of original – as
specified in tender document) along with scan copy of transaction slip of payment made through RTGS/NEFT for
Tender Fee & EMD shall be unloaded through on line only ( which is mandatory) on (n) procure portal.
Bidders shall compulsorily pay tender fee and EMD through RTGS/NEFT only. No any physical documents,
Demand Draft / Banker’s cheque or Pay order for tender fee and EMD to be submitted by bidders.
All the bidders, in respect of tender item must have vendor registration with the GETCO or their any subsidiary company
viz. prior to the date of opening of technical bid of the tender, otherwise their bids will not be considered eligible for technical
scrutiny and their technical bids will not be opened.
Sr. Description
1 Tender No.: JTC/ 25- 26 / n-03
Bi-Annual Rate Contract for the year of 2026-28
for the work of Transportation of any sub-station
/ line materials from various Store / Sub-station
2 Purchase/Work of of GETCO to various store / sub-station / line site
of GETCO including Loading, Unloading and
Stacking of material on as and when required
basis under Jambuva Circle
3 Tender Fee (non refundable) Rs. 1,180.00 ( Rs. 1,000 .00 + GST Rs. 180.00)
4 Estimated cost incl. of GST in Rs. Lacs Rs.
5 Earnest Money Deposit amount in Rs. Rs.
On line (E-tendering) tender/ offer submission last date
up to 16.00 hours only (This is mandatory)
7 Date of opening online technical bid at 16:10 Hours. 20.05.2026
8 Tentative Date of online opening of Price bid. Shall be intimated separately.
9 Prices Percentage Basis
10 Validity of offer 180 days
11 Time limit 24 Months
12 Appropriate / Registration Class Only GETCO registered contractor of Any class
1. All tender documents, scanned copies of original (Notarized / self-attested copies of original – as specified in
tender document) documents along with scan copy of transaction slip of payment made through RTGS/NEFT for
Tender Fee & EMD shall be uploaded through on line only (which is mandatory) on (n) procure Portal. No any
physical documents , Demand Draft / Banker’s cheque or Pay order for tender fee and EMD will be accepted
2. Bidder shall have to made payment for Tender fee and EMD though RTGS / NEFT only on or before due date and time
of submission of tender .Tender fee and EMD paid though Demand Draft / Banker’s cheque or Pay order will not be
accepted and no any further communication in the matter will be entertained.
3. It is mandatory for all the bidders to upload their tender documents by on line (E-tendering) in scheduled time.
4. It shall be sole responsibility of the bidder that the uploaded scanned documents (in PDF form) remain legible (readable)
and should not be password protected.
5. All the Appendices, forms, formats, declaration, undertaking, etc (To be submitted on bidder’s letterhead), Tender
acceptance letter (on bidder’s letterhead), price bid, tender documents specified in the tender must be submitted through
online on n-procure portal (mandatory) (All the documents to be duly self attested by the bidder). For any differences or
wrong entry bidder shall be sole responsible for that documents.
6. Tender will be evaluated on the basis of Data / Details / Documents submitted by the bidders though online offer only.
7. The bidders are required to upload complete technical bid duly filled, sealed & signed by bidder ( all the appendices
(annexure)/forms etc). This is intended for transparency and speedy evaluation of the bids. Instead of simply
confirming/attached in bid/refer physical offer, the bidder shall fill in the particulars against appropriate place in respect
of each line appearing in Technical bid (In the absence of required details in uploaded tender documents, technical bid
Seal & Signature of Bidder
, the purchaser has every right to evaluate the bids accordingly and bidder cannot raise any objection against any point
during evaluation).
8. In case of short submission of documents with bid and / or clarification if any required from the bidder,the required details
/ documents may be asked from the bidder in physical form.
9. Payment of Tender Fee and Earnest Money Deposit (EMD ) : The EMD and Tender fee plus GST as applicable shall
be paid through RTGS/NEFT only .
1) Payment of Tender fee , EMD through RTGS/NEFT : For the payment through RTGS/NEFT the scan copy of
payment made (transaction slip of payment made) shall be uploaded online with the Tender documents on n-procure
2) Bidder has to provide following detail on the same date of payment made so that receipt can be generated at
below mentioned e-mail ids:
Sr. No. Required Details
1 Name & Postal Address of the bidder
2 Contact Detail & e-mail id of the bidder
3 Tender No. with due date
4 Mode of Payment made
5 Ref. ID with Bank Details(UTR number)
6 Amount Paid for Tender fee in Rs.
7 Amount Paid for EMD in Rs.
8 GST Registration No.
3) GETCO Beneficiary Bank Details are as under:
Sr.No. Particulars Requisite Details
1 Name of Bank BANK OF BARODA
2 Name of Branch MAKARPURA VILLAGE BRANCH, VADODARA
5 IFSC Code BARB0MAKARP
6 Name of Account GETCO , JAMBUVA
8 GST No. 24AABCG4029R2ZC
12. Tender fee and EMD paid though Demand Draft / Banker’s cheque or Pay order will not be accepted. Also, Tender
fee and EMD received after due date and time as specified in the tender will not be accepted/opened irrespective of
delay due to any reasons and the Corporation shall not assume any responsibility for late receipt of the same.
13. Tender without EMD and tender fee plus GST as applicable shall be rejected.
14. Bidders are requested to remain in touch with the n-procure portal for any amendment/corrigendum or extension of
15. The GETCO reserves the right to award the work to one or more bidders, considering their technical and financial
capacity OR to reject any or all tenders or accept any tender without assigning any reason thereof.
Any technical questions, information and clarification that may be required pertaining to this enquiry should be referred
to: The Superintending Engineer (TR), Gujarat Energy Transmission Corporation Limited, Circle office Jambuva.
GETCO reserves the right to reject any OR all tenders without assigning any reasons thereof.
Yours faithfully,
Superintending Engineer
C.O., GETCO, Jambuva
To view the PDF file please use “Acrobat Reader” software which can be downloaded from “Adobe” website
In case bidder needs any difficulty in accessing / submission of on line bid / clarification or if training required for
participating in online tender, they can contact the following office: (n) Procure Cell, (n) code solutions-A division of GNFC Ltd.,
403, GNFC Infotower, S.G. Road, Bodakdev Ahmedabad –380054 (Gujarat ).
Email: [email protected]
Seal & Signature of Bidder
Seal & Signature of Bidder
INSTRUCTIONS TO BIDDERS
A. INTRODUCTION
1.0 General Particulars
1.1 The Gujarat Energy Transmission Corporation Ltd., Baroda hereinafter called ‘GETCO’/ ‘OWNER’ intends to
receive bids for Bi-Annual Rate Contract for the year of 2026-28 for the work of Transportation of any sub-station /
line materials from various Store / Sub-station of GETCO to various store / sub-station / line site of GETCO including
Loading, Unloading and Stacking of material on as and when required basis under Jambuva Circle as detailed in
the accompanying specifications in accordance with Terms and Conditions herein. The bids shall be prepared and
furnished as per these Instructions.
2.0 Bidding Costs
All costs/expenses in the preparation and submission of the Bid (including any post Bid discussions/presentations)
shall be fully borne by the Bidder. Owner will not be responsible/liable for these costs irrespective of the course and
conclusion of this Bidding.
3.0 BID DOCUMENTS
Details of Documents
The following Bid documents apart from Invitation to Bid detail the material and equipment
specifications/characteristics, the bidding procedures and the terms & conditions of contract:
a. Instructions to Bidders (ITB-Part I)
b. General Conditions of Contract (GCC-Part I)
c. Erection Conditions of Contract (ECC-Part I)
d. Special Conditions of Contract (SCC-Part I)
e. Technical Specifications (TSP-Part IIA)
f. Technical Data Sheets (TDS-Part IIB)
4.0 Knowing the Bid Documents
4.1 Every intending Bidder is to examine and understand all instructions, forms, terms, conditions and specifications in
the Bid Documents and fully know himself all the conditions and contents therein, which may in any manner, affect
the scope & content of work and the costs thereof. Submission of a Bid not substantially responsive to the Bid
Document in all respects and/or failure to furnish all information required by the Bid Document may entail rejection
of the Bid at the Bidder’s risk.
5.0 Clarifications on Bid Documents
5.1 In case an intending Bidder finds any discrepancy or omission in the documents and specifications or is in doubt
as to the true meaning of any part, he shall make a request, in writing not later than the date of pre Bid discussion,
to the owner in triplicate. The owner will issue explanations, interpretations and clarifications as deemed fit in writing
as a response to this request. On receipt of such interpretations/clarifications, the Bidder may submit his Bid within
the date and time stipulated in the Bid invitation, All such explanations, interpretations and clarifications from the
Owner shall be deemed as part of Bid Documents and shall invariably accompany the Bidder’s proposal.
5.2 Any verbal/telephonic clarifications and information given by the Owner or his employee (s) or his representative(s)
will not in any way be binding on the Owner.
6.0 Amendment of bidding document:
6.1 At any time prior to the deadline for submission of Bids the Owner may, for any reason, whether at his own initiative
or in response to a clarification requested by the intending Bidder, modify the Bidding Document with
6.2 The amendment will be notified in writing or Fax /web site to all intending Bidders who have received the Bidding
Document at the address contained in the letter of request for issue of Bidding document from the Bidders. Owner
will bear no responsibility or liability arising out of non-receipt of the same in time or otherwise.
6.3 In order to afford prospective bidders reasonable time in which to take the amendment into account in preparing
their bids, the Owner may, at his discretion, extend the deadline for the submission of bids.
6.4 Such amendments, clarifications etc. shall be binding on bidders and will be given due consideration by the Bidders
while they submit their bids and shall invariably enclose such documents as a part of the bid.
7.0 PREPARATION OF BIDS
7.1 Language of Bid:
The Bid prepared by the Bidder and all correspondence and documents relating to the Bid, exchanged by the
Bidder and the Owner, shall be written in the English language, provided that any printed literature furnished by the
Bidder may be written in another language so long as accompanied by an English translation of its pertinent
Seal & Signature of Bidder
passages. Failure to comply with this may disqualify a bid. For purposes of interpretation of the bid, the English
translation shall govern.
Bidders have to make the Bid in the formats furnished with this Document. Verbatim without adding any
printed/typewritten text of their own.
8.0 Local Conditions:
8.1 It will be imperative on each Bidder to fully inform himself of all local conditions and factors, which may have any
effect on the execution of the Contract covered under these documents and specifications. The Owner shall not
entertain any request for clarifications from the bidders, regarding such local conditions.
8.2 It must be understood and agreed that such factors have properly been investigated and considered while
submitting the proposals. No claim for financial adjustment to the Contract awarded under these specifications and
documents will be entertained by the owner. Neither any change in the time schedule of the Contract nor any
financial adjustments arising thereof shall be permitted by the Owner, which are based on the lack of such clear
information or its effect on the cost of the works to the Bidder.
9.0 Documents comprising the Bid:
in the Bidding Documents, indicating, for the services to be rendered, a brief description of services, quantity and
9.2 All tender documents, scanned copies of original (Notarized / self-attested copies of original – as specified in tender
document) documents along with scanned copy of original document for Tender Fee & EMD shall be uploaded
through on line only (which is mandatory) on (n) procure Portal to establish that the Bidder meets the Qualification
Requirements as detailed in ANNEXURE -I. No physical documents to be submitted by the bidder.
9.3 Complete technical bid / Tender Documents / formats are to be filled in all respects. Same shall be sealed and
signed by the Company Authorized Signatory wherever specified and scanned copies of original (Notarized / self-
attested copies of original – as specified in tender document) documents along with scanned copy of original
document shall be uploaded through on line only (which is mandatory) on (n) procure Portal.
9.4 Bidder shall have to made payment for Tender fee and EMD though RTGS / NEFT only before due date and time
of submission of tender. Tender fee and EMD paid though Demand Draft / Banker’s cheque or Pay order will
not be accepted and no any further communication in the matter will be entertained .
9.5 In case of short submission of documents with bid & / or clarification if any required from the bidder, the required
details/ documents may be asked from bidder in physical form.
9.6 It shall be sole responsibility of the bidder that the uploaded scanned documents ( in PDF form) remain legible &
should not be password protected.
9.7 Bidder shall have to upload scanned copies of complete technical bid filled in all respect and sealed and signed by
Company Authorized Signatory through on line only (which is mandatory) on (n) procure Portal
10.0 Bid Price:
enclosed in bid proposal sheets for erection, testing and commissioning, and other services it proposes to furnish
under the contract. The % age above/below indicated shall be inclusive of all taxes and duties applicable
inclusive of GST applicable on required inputs and services.
10.2 The Bidder shall specifically note that the Tenders are invited on percentage rate increase/decrease based in
11.0 Price Basis:
11.1 The Price shall be quoted on firm basis.
11.2 The Price quoted by the bidder shall remain fixed during the bidder's performance of the contract and shall not be
subject to variation on any account save for change in quantity. A bid submitted with an adjustable price quotation
shall be treated as non-responsive and rejected.
12.0 Taxes and Duties:
12.1 Goods and Service Tax (GST):
12.1.1 The F.O.R. Destination prices are excluding GST and Cess as applicable which will be paid extra on a given taxable
goods and/or services within the original contractual delivery period. The amount and% of GST and Cess as
applicable should clearly be indicated separately. (GST/Cess means all applicable Tax/Cess under GST Laws.
GST Laws means IGST Act, GST(Compensation to the State for Loss of Revenue) Act, CGST Act, UTGST Act
and SGSCT Act, 2017and all related ancillary legislations).
12.1.2 You shall have to submit a C.A Certificate& duly authorized Signatory of successful bidder, certifying that you have
not claimed Refund of any applicable GST and Cess, charged to COMPANY or shall not claim any such Refund,
on a future date, from the concerned Authorities and if, any Refund, in respect of such GST and Cess, is claimed
by you, it will be immediately passed on to the COMPANY, without COMPANY making any specific Claim, for the
same, either from the Department or from you.
Seal & Signature of Bidder
12.1.3 The offers having price INCLUSIVE OF GST and Cess is likely to be rejected if the rate of GST and Cess is not
mentioned clearly unless the bidder has opted for Compostion Scheme under GST Act, which should be clearly
indicated in the price bid. COMPANY may at its discretion consider such offer with presumption of highest
applicable rate of VAT/GST/Cess prevailing when the price quoted is inclusive of GST and Cess.
12.1.4 If the Supplier/Contractor has opted for the Composition scheme of GST, the same must be clearly specified with
valid Declaration & Certificate from Department. In the event of withdrawal/cessation of the Supplier from
Composition scheme during the tenure of the contract, the rate mentioned in the price bid shall be final and any
additional GST will have to be borne by the tenderer. In no case additional amount towards tax or otherwise will be
paid / reimbursed to supplier/contractor. Further Statutory Variation clause will not be applicable in case of Supplier
/ Contractor has opted for Composition Scheme under GST.
12.1.5 Supplier/Contractor should charge GST in Invoice at the rate as agreed to / mentioned in acceptance of tender only
and any deviation in the same shall not be accepted. Further, any additional liability of GST (later on due to wrong
mentioning of GST rate, mis-interpretation of HSN/SAC Code, etc.) over and above as charged in the invoice shall
be borne by the Supplier/Contractor. However, any refund received by the supplier / contractor on account of GST
charged from the company; such refund shall have to be passed on to the company, along with interest if any. Such
refund along with interest needs to be passed on suo-moto by the supplier / contractor.
12.1.6 Further, the Company has a right to recover the amount of GST along with penal interest at the rate of 15% per
annum if GST charged is not paid / short paid to the government or fail to upload the details or uploads inaccurate
particulars on GSTIN portal by the Supplier / Contractor within the stipulated time limit.
12.1.7 In case, Govt. revises the rate of GST rate / Code during the tenure of the contract, the provision of GUVNL’s
statutory variation clause shall apply.
12.1.8 INPUT TAX CREDIT BENEFIT
In the event of any statutory increase in the rate of Input Tax Creditand / or due to inclusion of any other additional
item of their inputs / input services under the ambit of the Input Tax Credit provisions under the GST Act,
subsequent to the date of submission of the offer, the same should be passed on to COMPANY and you should
inform such changes to COMPANY from time to time.
12.1.9 GST, other taxes and other levies and duties including custom duty solely in respect of the transaction between the
owner and the contractor under this contract, if any, shall be included in the bid price. These shall also be indicated
separately wherever applicable as mentioned in the Tender.
12.2 As regards the income Tax, surcharge on income tax and any other corporate tax, including GST if any ,the owner
shall not bear any tax liability whatsoever. The bidder shall be liable and responsible for payment of such taxes as
attracted under the provisions of the law.
12.3 Notwithstanding the tax liabilities as per the sub-clause 12.1 above the owner shall have the right to make deduction
at source from the amounts payable to the contractor in respect of Income Tax (on the cost of items of supply
included in the works contract) as may be mandatory in terms of the law. The owner shall not bear any liability in
this regard but shall issue necessary certificate in respect of such deduction made.
12.4 In case any tax or duty is newly introduced by the Government applicable for this contract with effect from the next
day of the date submission of the bid and if the contractor is required to pay additional tax or duty, then the owner
shall reimburse the contractor the additional tax or duty so paid by the contractor against submission by the
contractor of documentary evidence to the satisfaction of the owner. This provision will not be applicable to
transaction between the contractor and his sub-contractors and will be applicable only to the direct transaction
between the contractors and owner. Besides the said statutory variation, no other statutory variation shall be
payable by the owner.
12.5 The owner’s liability for all taxes and duties including GST under the contract shall be limited to those indicated by
the Bidder in the Bid Proposal Sheets, subject to the statutory variations and variations as per Clause No.
12.6 If the cost to the Contractor during the performance of the ‘Contract’ shall be increased or reduced by reasons of
the making, passing or promulgation of any law after the date of submission of bid or by any order, regulation or
bye-law having the force of law the amount of such increase or reduction shall be added to or deducted from the
“Contract Price” as the case may be for direct transactions between contactor & owner, and not for bought out
items. It is the Bidders responsibility to furnish details of taxes, duties, levies etc. applicable as on the date of
submission of the bid.
12.7 No claim for any increase towards the statutory variation regarding enhancement of existing tax or duty or
introduction of a new tax or duty applicable shall be entertained by the Owner during the extended period of
contract, if any, provided the extension of the contract is required by causes attributable to the contractor.
12.8 The provision of statutory variation regarding enhancement of existing tax or duty or introduction of a new tax or
duty will be applicable only to the direct transaction between the contractor and the owner.
12.9 Before quoting, the bidder may ascertain from the concerned tax authorities of Government of Gujarat the
applicability of Entry Tax, GST in respect of this work and include the same in the quoted price. The Owner in this
regard will entertain no separate claim, as it is the responsibility of the Bidder to pay all these taxes.
12.10 In addition, the conditions detailed under Special Conditions of Contract shall apply.
13.0 Time Schedule:
13.1 The basic consideration and the essence of the contract shall be strict adherence to the time schedule for
performing the specified works.
Seal & Signature of Bidder
13.2 The Owner’s requirements of completion schedule for the Works are mentioned in the accompanying Special
Conditions of Contract.
13.3 The completion schedule as stated in the special conditions of contract shall be one of the major factors in
consideration of the bids.
13.4 The owner reserves the right to request for a change in the work schedule during pre- award discussions with
successful bidder.
13.5 The successful bidder will be required to prepare detailed Bar chart and finalize the same with the owner as per
the requirement of Clause no 27.0 of GCC
14.0 Contract Quality assurance:
14.1 The Bidder shall include in his proposal the Quality Assurance Program containing the overall quality management
and procedures which he proposes to follow in the performance of the Works during various phases as detailed in
relevant clause of the General Technical Conditions.
14.2 At the time of Award of Contract, the detailed Quality Assurance Program to be followed for the execution of the
Contract will be mutually discussed and agreed and such agreed Program shall form a part of the Contract.
14.3 The Bidder shall clearly specify the list of sub-vendors from whom the bought out items are being supplied wherever
specifically indicated in the tender document shall supply only from those vendors. Such details shall be
accompanied by their list of previous supplies made performance reports etc. However, in case of orders are
placed, specific approval shall be obtained from the owner for the vendor-supplied materials. The quality assurance
program shall be furnished for each material separately for approval.
15.0 Insurance:
The Bidder’s insurance liabilities pertaining to the scope of Works are detailed out in Clauses titled Insurance, in
General Terms and Conditions of Contract and in Erection Conditions of this Part-I. Bidder’s attention is specifically
invited to these clauses. Bid price shall include all the costs in fulfilling all the insurance liabilities under the Contract.
16.0 Erection Tools and Tackles:
The Bidder under a separate schedule, in his proposal shall include a list of all-special equipment tools & tackles
etc. which he proposes to bring to site for the purpose of erection, handling, testing and commissioning including
performance and guarantee tests of the equipment. If any such equipment is listed anywhere else in the proposal
and not specially mentioned in the above schedule, it shall be deemed to have been included in the Bidder’s
proposed scope of supply.
17.0 Brand Names:
17.1 The specific reference in these specifications and documents to any material/equipment by brand name makes or
catalogue number shall be construed as establishing standards of quality and performance and not as limiting
competition. However, Bidders may offer other similar material/equipment provided they meet the specified
standard, design and performance requirements. The Bidder shall furnish adequate technical information about
such alternative material equipment to enable the Owner to determine its acceptability. The Owner shall be the sole
judge on the acceptability or otherwise of such alternatively material/equipment.
17.2 The bidder shall note that standards for workmanship material and equipment, and reference to brand name of
catalogue numbers designed by the Owner in its Technical Specifications are intended to be descriptive only and
not restrictive. The Bidder may substitute alternative standards, brand name and/or catalogue numbers in its bid,
provided that it demonstrates to the Owner’s satisfaction that the substitutions are substantially equivalent or
superior to those designed in the Technical Specification.
18.0 Bid Security/EMD:
The bidder shall furnish, as a part of its bid EMD, bid security for an amount of one percent of estimated cost to be
a) Payment of Earnest Money Deposit ( EMD ) can be accepted by RTGS/ NEFT only
1. In case of payment through RTGS/NEFT the scan copy of payment made (transaction slip of
payment made) shall be uploaded online with the Tender documents on n-procure portal.
2. Bidder has to provide following detail on the same date of payment made so that receipt can be
generated at below mentioned e-mail ids:
Sr. Required Details
1 Name & Postal Address of the bidder
2 Contact Detail & e-mail id of the bidder
3 Tender No. with due date
4 Mode of Payment made
Seal & Signature of Bidder
5 Ref. ID with Bank Details(UTR number)
6 Amount Paid for Tender fee in Rs.
7 Amount Paid for EMD in Rs.
3. GETCO Beneficiary Bank Details are as under:
Sr.No. Particulars Requisite Details
1 Name of Bank BANK OF BARODA
2 Name of Branch MAKARPURA VILLAGE BRANCH, VADODARA
5 IFSC Code BARB0MAKARP
6 Name of GETCO , JAMBUVA
8 GST No. 24AABCG4029R2ZC
18.1 The offer should be valid for a minimum period of 180 days from the date of opening of technical bid.
18.2 The bid security is required to protect the owner against the risk of Bidder’s conduct, which would warrant the
guarantee forfeiture, pursuant to relevant paras elsewhere The bid guarantee shall be made payable to the Owner
without any condition whatsoever.
18.3 The Owner as non-responsive will reject any bid not secured in accordance with Para 18.1 above. No exemptions
are made in the furnishing of the security.
18.4 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of tender or three months from the
date of submission of tender whichever is later.
18.5 The successful bidders, Bid Security will be discharged upon, furnishing the contract performance guarantee
18.6 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the bidder on the bid Form:
b) If a bidder refuses to accept the contract or fails to commence the works including supplies within thirty
days of letter of award of contract)
19.0 Format of Bid:
19.1 The original and all copies of the bid shall be typed or written in indelible ink and shall be signed by the
Bidder or a person or persons duly authorized by the Bidder to sign the Contract. The letter of
authorization shall be indicated by written power-of-attorney accompanying the bid. All pages of the
bid, except for un-amended printed literature, shall be initiated by the person or persons signing the bid.
19.2 Complete technical bid / all Tender Documents / formats are to be filled in all respects. Same shall be sealed and signed
by the Company Authorized Signatory wherever specified and scanned copies of original (Notarized / self-attested
copies of original – as specified in tender document) documents along with scanned copy of original document shall be
uploaded through on line only (which is mandatory) on (n) procure Portal. No physical documents to be submitted by
19.3 The bid shall contain no interlineations, erasures or overwriting except as necessary to correct errors made by
the Bidder, in which case such corrections shall be initiated by the person or persons signing the bid.
19.4 The bid shall contain no interlineations, erasures or overwriting except as necessary to correct errors
made by the Bidder, in which case such corrections shall be initiated by the person or persons signing the
19.5 Bids shall be submitted as under:
Complete Technical Bid, Tender documents as per QR , Price Bid and transcation slip for
payment made for tender fee & EMD through RTGS / NEFT ,shall be submitted ‘online’ only.
20.0 Signature of Bids:
20.1 The bid must contain the name, residence and place of business of the person or persons making the bid and must
be signed and sealed by the Bidder with his usual signature. The names of all persons signing should also be typed
or printed below the signature.
20.2 Bid by a partnership must be furnished with full names of all partners and be signed with the partnership name,
followed by the signature(s) and designation(s) or the authorized partner(s) or other authorized representative(s).
20.3 Bids by Corporation/Company must be signed with the legal name of the Corporation/Company by the
President/Managing Director or by the Secretary or other person or persons authorized to bid on behalf of such
Corporation/Company in the matter.
20.4 A bid by a person who affixes to his signature the word ‘President’, ‘Managing Director’, ‘Secretary’, ‘Agent’ or other
designation without disclosing his Principal will be rejected.
Seal & Signature of Bidder
20.5 If it is found that two or more persons who are connected with one another either financially or as a principal and
agent have bid under different names without disclosing their connection then such bids will be liable for rejection.
Satisfactory evidence of authority of the person signing on behalf of the Bidder shall be furnished with the bid.
20.6 The Bidder’s name stated on the proposal shall be the exact legal name of the firm.
20.7 Bids not conforming to the above requirements of signing may be disqualified and EMD forfeited.
21.0 Sealing and marking of bids:
21.1 Complete Technical Bid, Tender documents as per QR ,Price Bid and transaction slip for payment made
for tender fee & EMD through RTGS / NEFT ,shall be submitted ‘online’ only
Price Bid : Technical & Price bid shall be submitted ‘online’ only through n-code.
21.2 The Technical Bid and accompanying documents, RTGS/ NEFT transaction slip for payment made for
tender fee and EMD shall be uploaded (scanned copies of original document ) through on line only
(which is mandatory) on (n) procure Portal by the bidder.
21.3 Addressed to the Owner at the following address:
The Superintending Engineer
GETCO, Circle Office,
220kv Jambuva sub-station compound.
NH -8, Jambuva ,Vadodara-
22.0 Deadline for submission of bids:
22.1 The Bidders have to submit the bid documents with detail of payment of tender / Fee /EMD paid though
NEFT / RTGS by online mode only as per schedule closing date of submission of online bid.
22.2 The Owner may, at its discretion, extend this deadline for the submission of bids by amending the Bidding
Document in which case all rights and obligations on the Owner and Bidders previously subject to the
deadline will thereafter be subject to the deadline as extended.
23.1 Any bid received by the Owner after the time and date fixed or extended for submission of bids prescribed by the
Owner, will be rejected and not considered for evaluation.
24.0 Modification and withdrawal of bids:
24.1 The Bidder may modify or withdraw its bid after the bid’s submission provided that written notice of the modification
or withdrawal is received by the Owner prior to the deadline prescribed for submission of bids.
24.2 The Bidder’s modification or withdrawal notice shall be prepared, sealed, marked and dispatched in accordance
with the provisions of clause 23.0. The envelope should clearly indicate whether the modification is for the Technical
bid or the Price bid. No bid modifications notice by Telex/Grams/Fax shall be entertained by the Owner.
24.3 No bid shall be modified in any manner, whatsoever subsequent to the deadline for submission of bids.
24.4 No bid may be withdrawn in the interval between the deadline for submission of bids and the expiration of the period
of bid validity specified by the Bidder on the Bid Form. Withdrawal/modification of a bid during this interval may
result in the Bidder’s forfeiture of its bid security.
25.0 Information required with the proposal:
25.1 The bids must clearly indicate the name of the manufacturer, the type and/or model of each principal item of
equipment proposed to be furnished and erected. The bid should also contain drawings and descriptive materials
indicating general dimensions, materials from which the parts are manufactured, principles of operation, the extent
of pre-assembly involved, major construction equipment proposed to be deployed, method of erection and the
proposed erection organizational structure.
25.2 The above information shall be provided by the Bidder in the form of separate sheets, drawings, catalogues, etc.
in five copies.
25.3 Any bid not containing sufficient descriptive material to describe accurately the equipment proposed may be treated
as incomplete and hence rejected. Such descriptive materials and drawings submitted by the Bidder will be retained
by the Owner. Any major departure from these drawings and descriptive material submitted will not be permitted
during the execution of the Contract without specific written permission of the Owner.
25.4 Oral statements made by the Bidder at any time regarding quality, quantity or arrangement of the equipment or any
other matter will not be considered.
25.5 Standard catalogue pages and other documents of the Bidder may be used in the bid to provide additional
information and data as deemed necessary by the Bidder.
25.6 The Bidder, along with his Proposal, shall submit a list of recommended erection equipment and materials which
will be required for the purpose of erection of equipment and materials supplied under the Contract.
25.7 In case the ‘Proposal’ information contradicts specification requirements, the specification requirements will govern,
unless otherwise brought out clearly in the technical commercial deviation schedule.
26.0 BID OPENING AND EVALUATION
Seal & Signature of Bidder
Opening of bids by owner:
26.1 The Owner will open the technical bids online on Date of opening online technical bid.
26.2 The Bidder’s names, Technical modifications, bid withdrawal and such other details as the Owner, at his
discretion may consider appropriate, will be announced in the Technical Bid Opening.
26.3 Price bid will be open ‘online’ only through n-code after technical scrutiny of tender.
Technical bid and Price bid will be open ‘online’ only through n-code.
27.0 Purpose of evaluation of bids:
27.1 The Bids received/accepted/opened will be evaluated by the Owner to ascertain the technical responsiveness of
the bid for the complete scope of the proposal, as covered under these specifications and documents. All technically
responsive bids shall then be examined to determine the LOWEST EVALUATED COMMERCIALLY AND
TECHNICALLY RESPONSIVE BIDS.
27 ( A) Policy for bids under consideration:
27.A.1 Bids shall be deemed to be under consideration immediately after opening of Technical Bid and until such time
official intimation of award/rejection is made by the Owner to the Bidders. While the Bids are under consideration,
Bidders and/or their representatives and other interested parties are advised to refrain from contacting by any
means, the owner and/or his employee’s representatives on the matters related to Bids under consideration.
27.A.2 Clarification of bids:
To assist in the examination evaluation and comparison of Bids the owner may on his own ask the Bidder for a
clarification of its bid. The request for clarification and the response shall be in writing and no change in the price
or substance of the bid shall be sought, offered or permitted.
28.0 Preliminary Examination:
28.1 The Owner will examine the bids to determine whether they are complete, whether any computational errors have
been made, whether required sureties have been furnished, whether the documents have been properly signed,
and whether the bids are generally in order.
28.2 Arithmetical errors will be rectified on the following basis:
If there is a discrepancy between the unit price and the total price that is obtained by multiplying the unit price and
quantity, the unit price shall prevail and the total price shall be corrected. If there is a discrepancy between the total
bid amount and the sum of total costs, the latter shall prevail and the total bid amount will be corrected accordingly.
If there is a discrepancy between words and figures, the amount advantageous to the Owner will prevail. If the
Bidder does not accept the correction of the errors as above, his Bid will be rejected and the amount of Bid Security
each other. In the case of any inconsistency in the prices furnished in the specified prices schedules to be identified
in Bid Form for this purpose, the Owner shall be entitled to consider the highest price for the purpose of evaluation
and for the purpose of award of Contract use the lowest of the prices in these schedules.
28.3 Prior to the detailed evaluation, the Owner will determine the substantial responsiveness of each bid to the Bidding
Document. For purpose of these Clauses, a substantially responsive bid is one which conforms to all the terms and
conditions of the Bidding Document without material deviations. A material deviation is one which affects in any
way the prices, quality, quantity or delivery period of the equipment, completion of works or which limits in any way
the responsibilities or liabilities of the Bidder of any right of the Owner as required in these specifications and
documents. The Owner’s determination of a bid’s responsiveness shall be based on the contents of the bid itself
without recourse to extrinsic evidence.
28.4 A bid determined as not substantially responsive will be rejected by the Owner and may not subsequently be made
responsive by the Bidder by correction of non-conformity.
28.5 The Owner may waive any minor informality or non-conformity or irregularity in a bid which does not constitute a
material deviation, provided such waiver does not prejudice or affect the relative ranking of any Bidder.
29.0 Evaluation of Price Bids:
29.1 Definitions and Meanings:
For the purpose of the evaluation and comparison of bids, the following meanings and definition will apply: -
a) ‘Bid Price’ shall mean the price quoted by each Bidder in his proposal for the complete scope of works.
b) ‘Evaluated Bid Price’ shall be summation of ‘Bid Price’, ‘Differential Price’ and ‘Cost Compensation for
30.0 Calculation of differential Price & Cost Compensation for Deviations.
The Differential Price to be added to the Bid Price of each bid during evaluation and comparison shall be derived
Seal & Signature of Bidder
Differential Price (DP)=n1F1+n2F2…+nn Fn, where F1, F2…Fn are the various factors in Indian Rupees per unit
of parameter differential or deficiency in the equipment and services offered as stipulated in these specifications:
n1, n2…nn are the respective parameter differential or deficiency in the corresponding units to be determined from
the Bidder’s proposal. The above factors and corresponding units of parameter differential are derived from the
Technical Specifications, Data sheets and/or Special Conditions of Contract.
Deviations from the Bidding Documents in so far as practicable will be converted to a Rupee value (D) and from
the Bidding Document while evaluating the bids. In determining the Rupee value of the deviations the Owner will
use parameters consistent with those specified in the specifications and documents and or other information as
necessary and available to the Owner.
30.1 Comparison of Bids
The bids shall be compared on the basis of lumpsum prices (i.e., for erection services to be rendered as quoted by
the Bidder) for the entire scope of the proposal as defined in the Bidding Document.
For comparison purposes all the evaluated bid prices shall be in Indian Rupees as under:
W = Total Comparison Price
Q = Bid Price quoted by the bidder in Indian Rupees (Value of erection cost including other components if any.)
DP = Different price in Indian Rupees calculated as above
D = Cost compensation for deviations calculated as above.
All evaluated bid prices of all the bidders shall be compared among themselves to determine the lowest evaluated bid and,
as a result of this comparison, the lowest bid will be selected for the award of the Contract.
31.0 AWARD OF CONTRACT
31.1 The owner will award the contract to the successful Bidder, whose bid has been determined to be substantially
responsive and has been determined as the lowest evaluated bid, providing further that the Bidder is determined
to be qualified to perform the contract satisfactorily. The Owner shall be the sole judge in this regard.
32.0 MATCHING OF END COST:
32.1 In case the GETCO decides to award contract on matching end-cost basis, the bidder has to reduce all the quoted
rates proportionately. The reduction on overall basis will not be accepted (i.e. all unit rates of erection schedule
shall be reduced proportionately by difference in percentage). The confirmation for matching end cost shall be
given within 7 (seven) days from the letter from GETCO.
32.2 Further, the Owner reserves the right to award separate contracts to two or more parties in line with the terms
and conditions specified in the accompanying Technical Specifications.
33.0 Owner’s right to accept any bid and to reject any or all bids:
33.1 The Owner reserves the right to accept or reject any bid, and to annual the bidding process and reject all bids at
time prior to award of contract, any without thereby incurring any liability to the affected Bidder or Bidders or any
obligation to inform the affected Bidder or Bidders of the grounds for the Owner’s action.
34.0 Notification of award:
34.1 Prior to the expiration of the period of bid validity and extended validity period, if any, the Owner will notify the
successful Bidder in writing by registered letter or cable or telex or FAX, to be confirmed in writing by registered
letter, that its bid has been accepted.
34.2 The notification of award will constitute the formation of the Contract.
34.3 Upon the successful Bidder’s furnishing of performance guarantee pursuant to relevant clause 36.0, the Owner will
promptly notify each unsuccessful Bidder and will discharge its bid security, pursuant to Clause 18.0.
35.0 Signing of contract:
35.1 At the same time as the Owner notifies the successful Bidder that his bid has been accepted, the Owner will send
the Bidder the detailed of Award, incorporating all agreements between the parties.
35.2 Within 15 days of receipt of the detailed of Award, the successful bidder shall sign the same with date and return it
35.3 The Bidder will prepare the Contract Agreement as per the Performa prescribed and the same will be signed within
30 (Thirty) days of notification of Award.
36.0 Contract Performance Guarantee:
36.1 As a contract performance security, the successful bidder, to whom the work is awarded, shall be required to furnish
a performance guarantee in form of Bank guarantee from a Public Sector Indian bank/Scheduled, Commercial
Bank in the form to be furnished. The guarantee amount shall be equal to five percent (5%) of the Contract price
Seal & Signature of Bidder
and it shall guarantee the faithful performance of the Contract in accordance with the terms and conditions specified
in these documents and specifications. the guarantee shall be valid up to 90 days after the end of Warranty Period.
36.2 The Performance Guarantee shall cover additionally the following guarantees to the Owner:
a) The successful Bidder guarantees the successful and satisfactory operation of the equipment furnished and
erected under the Contract, as per the specifications and documents.
b) The successful Bidder further guarantees that the equipment provided by him/his sub-vendors and installed by
him shall be free from all defects in design, material and workmanship and shall upon written notice from the
Owner fully remedy free of expenses to the Owner such defects as developed under the normal use of the said
equipment within the period of guarantee specified in the relevant clause of the General Terms and Conditions
in the Part-I / Special Conditions of Contract.
36.3 The Contract Performance Guarantee is intended to secure the performance of the entire contract. However, it is
not to be construed as limiting the damages under clause entitled “Equipment Performance Guarantee” in Technical
Specifications, Part-II and damages stipulated in other clauses in the Bid documents.
36.4 The performance guarantee will be discharged without any interest at the end of guarantee period, unless otherwise
specified in Special Conditions of Contract.
37.0 Scope of the proposal
37.1 The Scope of the proposal shall be on the basis of a single Bidder’s responsibility, completely covering all the
equipment erection and other installation services specified under the accompanying Technical Specifications. It
will include among others as specified therein the following: - The work includes transportation of any materials with
it’s relevant accessories from any store center of GETCO to project site/ any store of GETCO including loading,
transportation, unloading and stacking of materials as per instruction of EIC. No charge will be given for empty trip.
37.2 As specified in the Special Conditions of Contract, no deviation whatsoever to certain conditions of the bidding
documents permitted by the Owner and therefore, the Bidders are advised that while making Bid Proposals and
quoting prices these conditions may appropriately be taken into consideration. Bidders are required to furnish a
certificate in this regard as per the format provided in Special Conditions of Contract in a separate sealed envelope
containing Bid security, which shall accompany the Technical Bid. Any Bid not accompanied by such certificate
shall be rejected by the Owner and shall not be opened.
37.3 Bids not covering the above cited entire scope of works may be treated as incomplete and hence rejected.
37.4 The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets, Technical Data Sheets and
specified elsewhere. The Qualifying Data should be filled in the required schedule of Bid Proposal Sheets
37.5 No deviation whatsoever to certain conditions of the bidding documents permitted by the Owner and therefore,
the Bidders are advised that while making Bid Proposals and quoting prices these conditions may appropriately be
taken into consideration. Bidders are required to furnish a certificate in this regard as per the format provided in
Special Conditions of Contract in a separate sealed envelope containing Bid security, which shall
accompany the Technical Bid. Any Bid not accompanied by such certificate shall be rejected by the Owner and
shall not be opened.
QUALIFYING REQUIREMENT
1 Registration: Bidder shall be strictly a GETCO registered contractor of any class.
2 Experience: Contractor should have executed similar nature of work up to 50 % of tender amount in single contact
for Annual carting contract for transportation, loading and unloading of structure material, tower material, steel,
power/control cable, conductor, earth wire, equipments (CT, PT, LA, Panels, Battery set etc from one store to other
in Gujarat of GETCO as a main contractor in last three financial years and bidder shall have to submit work order
along with satisfactory work completion certificate from respective departments
3. Solvency: Latest bank solvency certificate from any Nationalized/Scheduled Bank of a sum of minimum 20 % of the
estimated cost shown in the tender.
4 Provident Fund Code: Separate provident fund code number towards firm registered with
Regional P. F. Commissioner.
5 Profit & Loss Account Statement: The Bidder should submit certified Xerox audited copy of the Balance sheet
with profit and loss account of last three Years.
6 Nature of Firm: Attested copy of Partnership Deed, Power of Attorney, if any, for signing the bid documents in
case of partnership firm & self affidavit for proprietorship firm. All such documents shall have to be NOTARISED
7. GST Registration: The Bidder shall be registered under the GST. The certified Xerox copy of such registration of
GST shall have to be submitted along with the bid by the bidder.
8. I.T. PAN CARD: The bidder should submit the attested zerox copy of PAN Card of their firm.
Seal & Signature of Bidder
9. List of tools, tackles and equipment, vehicle available for execution of work.
1. Complete Technical bid ,all tender documents (Scan copy of notarized/self-attested as per tender specification) ,RTGS/
NEFT transaction slip for payment made for tender fee and EMD to be submitted on line only (which is mandatory) on
(n) procure Portal. No physical documents to be submitted by the bidder
2. The above-cited requirements are only indicative. The owner reserves the right to requisition any other relevant
information and also reserves the right to reject the Bid proposal of any Bidder, if in the Owner’s opinion the Qualification
data is incomplete and Bidder is not qualified to perform the Contract satisfactorily.
1. The Scope of the proposal shall be on the basis of a single Bidder’s responsibility, completely covering all the services
specified under the accompanying Technical Specifications.
2. The Bidder shall complete all the schedules & annexure in the Bid Proposal Sheets, technical Data Sheets and specified
3. The scope of work is “Bi-Annual Rate Contract for the year of 2026-28 for the work of Transportation of any sub-station
/ line materials from various Store / Sub-station of GETCO to various store / sub-station / line site of GETCO including
Loading, Unloading and Stacking of material on as and when required basis under Jambuva Circle” as per standard
specification and standard practice of GETCO and as per EIC.
4. The above work shall be carried out as per GETCO’s approved drawing/layout.
5. Necessary field quality plan of GETCO shall be implemented and necessary documentation shall also be maintained as
per GETCO’s norms and instruction of EIC. If required field quality plan shall be available at field offices.
6. During the work of erection safety check list shall be followed. Necessary check list will be available at our field office.
7. Successful bidder has to appoint site Engineer to maintained site register & FQP as per ISO.
8. All work should be done accordingly to ISO & FQP and all require documents including Filled FQP, testing results etc.
should be submitted while handing over the completed work.
9. The quantity mentioned in price bid is tentative and may vary while actual work execution.
Detail scope of transportation:
a) Contractor shall have to arrange construction of approach depending upon site situation, if required at his own cost
without damaging any of the GETCO / other property during the entire job at his own cost. The cost of any damage
shall be recovered from contractor’s bill.
b) All equipment/materials such as 400/220/132/66 KV class current transformers, potential transformers, circuit
breakers, control relay panels, girders, tower materials etc. & other accessories shall have to be transported by the
contractor in vehicle / truck / trailer of adequate capacity.
c) equipment/materials such as 400/220/132/66 KV class current transformers, potential transformers, circuit
breakers, control relay panels, girders, tower materials etc.with its accessories is to be transported up to destination
safely at contractor’s risk and cost. All necessary labours, tools, tackle etc. shall have to be arranged by the
contractor for loading & unloading & stacking of material. The material shall be unloaded at site / store as per
instruction of EIC.
d) The contractor shall be fully responsible for any shortages, breakages or damages to the EQUIPMENTS/
accessories that may occur during the time of loading, transportation & unloading and stacking. The cost of any
such shortages, breakages of damages if any shall be recovered from the contractor, the assessment of which will
be done by Engineer In Charge at his sole discretion and his decision shall be binding to the contractor. Bidder is
fully responsible for settlement of claim with insurance company at his own.
e) The contractor shall be responsible for any accident or damage to private public properties etc. during loading
unloading and transportation etc.
f) The GETCO shall not responsible for any accident injury etc. to the contractor’s labours or equipments during the
execution of the job.
g) The successful bidder shall have to indemnify the GETCO against any possible claim of compensation for damage
to his equipment or for injury to him or fatal/non-fatal accident to human life, his staff or any other person during
execution of above job. If for any reasons the GETCO is called upon to pay such claim/compensation, same will
be recovered from bidder from his dues.
h) The contractor or his authorized person dully approved by GETCO shall always be present at the time of loading,
transportation, unloading, and stacking of material.
i) If at any stage the contractor fails to carry out the job, the work will be get done at his risk & cost by giving notice
as per rules as the time is the essence of the contract. Contractor will not be entertained for any dispute in this
j) The contractor shall have to make his own arrangement for PWD road permit,R.T.O. permission or any other
permission from local or other authority or movement of tractor / Trailer in Gujarat state Government which may be
required for transportation stated above. If necessary the GETCO will extend all possible assistance to the
contractor by way of recommendation, letters for issue of such permission to the various authorities if required but
without any commitment and without prejudice to the other terms & conditions of tender.
Seal & Signature of Bidder
k) All taxes permit from RTO, toll tax and other taxes shall have to be paid by the successful bidder without any burden
to GETCO for transportation of transformers and accessories.
l) All expenditure towards railway traffic / power block & HV/LV/EHV line outages from other utility, if required shall
be borne by successful bidder for early completion of work. However, GETCO will reimburse the charges for railway
traffic / power block & HV/LV/EHV line outages at actual on production of proof of original money receipt from
concern department.
m) Wherever necessary reinforcement to the small bridge or culvert coming the way while transporting shall have to
be arranged by contractor at his cost.
n) The bidder should quote his rate correctly taking in to consideration all points mentioned in the Schedule- ‘B’
attached. The rates should be quoted without any condition and should be in words and figures in legible hand.
o) The GETCO reserves the right to reject any or all tenders without assigning any reasons thereof.
p) The entire work of unloading, loading, stacking of material shall have to be carried out mostly in surrounding live
switch yard in the substation hence skilled supervisor is to be engaged to avoid any electrical accident. GETCO is
not responsible for any electrical accident.
q) Transformer oil and accessories should be transported separately for which weigh bridge slip shall be considered
r) Insurance for material to be transported is to be taken by the contractor covering contractual period including
unloading, loading, stacking and transportation.
Signature of Contractor Superintending Engineer (TR)
GETCO, CO, Jambuva
Seal & Signature of Bidder
GENERAL TERMS & CONDITIONS OF CONTRACT
A. INTRODUCTION
1.0 DEFINITION OF TERMS
1.1 The ‘Contract’ means the agreement entered into between the Owner and the Contractor as per the Contract
Agreement signed by the parties, including all attachments and appendices thereto and all documents incorporated
by reference therein.
1.2 ‘‘Owner’ shall mean the Gujarat Energy Transmission Corporation Ltd, Vadodara or any of its group companies.
i.e. GUVNL, GSECL, MGVCL, DGVCL, PGVCL, UGVCL and shall include its legal representatives, successors
1.3 ‘Contractor’ shall mean the Bidder whose bid is accepted by the Owner for the award of the Works and shall include
such successful Bidder’s legal representatives, successors and permitted assigns.
1.4 ‘Sub-Contractor’ shall mean the person named in the Contract for any part of the Works or any person to whom
any part of the Contract has been sublet by the Contractor with the consent in writing of the Engineer and will
include the legal representatives,successors and permitted assigns of such person.
1.5 ‘Engineer’ shall mean the officer appointed in writing by the Owner to act as Engineer from time to time for the
purpose of the Contract.
1.6 The terms ‘Stores’ and ‘Materials’ shall mean and include equipment, stores and materials to be issued to the
Contractor under the Contract.
1.7 ‘Works’ shall mean and include taking delivery of line materials labour and services, as per the Specifications and
complete erection, testing and putting into satisfactory operation including all transportation, handling, unloading
and storage at the Site as defined in the Contract.
1.8 ‘Specifications’ shall mean the Specifications and Bidding Document forming a part of the Contract and such other
schedules and drawings as may be mutually agreed upon.
1.9 ‘Site’ shall mean and include the land and other places on, into or through which the works and the related
facilities are to be erected or installed and any adjacent land, paths, street or reservoir which may be allocated or
used by the Owner or Contractor in the performance of the Contract.
1.10 The term ‘Contract Price’ shall mean the lump-sum price quoted by the Contractor in his bid with additions and/or
deletions as may be agreed and incorporated in the Letter of Award and the contract agreement for the entire scope
1.11 The term ‘Erection Portion’ of the Contract price shall mean the value of field activities of the works including
erection, testing and putting into satisfactory operation including successful completion of performance and
guarantee tests to be performed at Site by the Contractor including cost of insurances.
1.12 Site Engineer ‘Inspector’ shall mean the owner’s Engineers or any person nominated by the time to inspect the
equipment; stores or Works under the Contract and/or the duly authorized representative of the Owner.
1.13 ‘Notice of Award of Contract’/’Letter of Award’/’Telex of Award’ shall mean the official notice issued by the Owner
notifying the Contractor that his bid has been accepted.
1.14 ‘Order’ shall mean the official letter issued by the Owner informing the acceptance of the bid.
1.15 ‘Date of Contract’ shall mean the date on which letter of commencement of work issued by the respective sub
division deputy engineer.
1.16 ‘Month’ shall mean the calendar month. ‘Day’ or ‘Days’ unless herein otherwise expressly defined shall mean
calendar day or days of 24 hours each.
A ‘Week’ shall mean continuous period of seven (7) days.
1.17 Writing’ shall include any manuscript, type written or printed statement, under or over signature and/or seal as the
1.18 When the words ‘Approved’, ‘Subject to Approval’, ‘Satisfactory’, ‘Equal to’, ‘Proper’, ‘Requested’, ‘As Directed’,
‘Where Directed’, ‘When Directed’, ‘Determined by’, ‘Accepted’, ‘Permitted’, or words and phrases of like
importance are used the approval, judgment, direction etc. is understood to be a function of the Owner/Engineer.
1.19 Test on completion shall mean such tests as prescribed in the Contract to be performed by the Contractor before
the work is taken over by the Owner.
1.20 ‘Performance and Guarantee Tests’, shall mean all operational checks and tests required to determine and
demonstrate capacity, efficiency, and operating characteristics as specified in the Contract Documents.
1.21 The term ‘Final Acceptance’/‘Taking Over’ shall mean the Owner’s written acceptance of the Works performed
under the Contract, after successful commissioning/completion of Performance and Guarantee Tests, as specified
in the accompanying Technical Specifications or otherwise agreed in the Contract.
1.22 ‘Guarantee Period’ shall mean the period during which the Contractor shall remain liable for repair or replacement
of any defective part of the works performed under the Contract.
Seal & Signature of Bidder
1.23 ‘Latent Defects’ shall mean such defects caused by faulty designs, material or work-man- ship which cannot be
detected during inspection, testing etc, based on the technology available for carrying out such tests.
1.24 ‘Drawing’, ‘Plans, shall mean all:
a) Drawings furnished by the Owner to the Contractor during before execution of work / the progress of the work;
b) Engineering data and drawings submitted by the Contractor during the progress of the work provided such
drawings are acceptable to the Engineer/Owner after duly approved.
1.25 ‘Codes’ shall mean the following including the latest amendments and/or replacements, if any:
a) Indian Electricity Act, 1905 and Rules and Regulations made there under.
b) Electricity Act 2003 and Rules & Regulations made there under.
c) Indian Factory Act, 1948 and Rules and Regulations made there under.
d) Indian Explosives Act, 1884 and Rules and Regulations made there under.
e) Indian Petroleum Act, 1934 and Rules and Regulations made there under.
f) A.S.M.E. Test Codes.
g) A.I.E.E. Test Codes.
h) American Society of Materials Testing Codes.
i) Standards of the Indian Standards Institution.
j) Other Internationally approved standards and/or rules and regulations touching the subject matter of the
1.26 Words imparting the singular only shall also include the plural and vice –versa where the context so requires.
1.27 Words imparting ‘Person’ shall include firms, companies, corporations and associations or bodies of individuals,
whether incorporated or not.
1.28 Terms and expressions not herein defined shall have the same meaning as are assigned to them in the Indian Sale
of Goods Act (1930), failing that in the Indian Contract Act (1872) and failing that in the General Clauses Act (1897)
including amendments thereof, if any.
1.29 In addition to the above the following definitions shall also apply.
a) ‘All equipment and materials’ to be supplied shall also mean ‘Goods’.
b) ‘Constructed’ shall also mean ‘erected and installed’.
c) ‘Contract Performance Guarantee’ shall also mean ‘Contract Performance Security’.
1.30 GST / Cess means all applicable tax / cess under GST Laws ,GST laws means IGST Act, GST ( compensation to
the state for loss of Revenue ) Act, CGST Act, UTGST Act & SGSCT Act, 2017 and all related ancillary legislations.
1.31 Works contract means a contract for composit supply & covered under the definition of works contract as defined
under section 2 ( 119) , of the CGST act , 2017 or SGST act ,2017 & similar provisions, applicable under the UTGST
act, 2017 & the IGST act ,
2.0 APPLICATION
These General Conditions shall apply to the extent that they are not superseded by provisions in other parts of the
The works carried out under this Contract shall conform to the all statutory regulation and provisions the acts,
mentioned in the Technical Specifications, and, when no regulations or standard is mentioned, to the authoritative
regulations or standards/ Act, appropriate to the works and such stipulations shall be the latest issued by the
concerned institution.
4.0 LANGUAGE AND MEASURES
All documents pertaining to the Contract including specifications, schedules, notices, correspondences, operating
and maintenance instructions, drawings or any other writing shall be written in English language. The Metric System
of measurement shall be used exclusively in the Contract.
5.0 CONTRACT DOCUMENTS
5.1 The term Contract Documents shall mean and include the following which shall be deemed to form an integral part
of the Contract:
a) Invitation to Bid including letter forwarding the Bidding Documents, Instructions to Bidders, General Terms
and Conditions of Contract and all other documents included under Volume- I and the Special Conditions of
b) Specifications of the erection of the equipments and other technical services to be provided under the
Contract as brought out in the accompanying Technical Specifications.
c) Contractor’s Bid Proposal and the documents attached there to including the letters of clarifications thereto
between the Contractor and the Owner prior to the Award of Contract except to the extent of repugnancy.
Seal & Signature of Bidder
d) All the materials, literature, data and information of any sort given by the Contractor along with his bid, subject
to the approval of the Owner /Consultant.
e) Letter of Award and any agreed variations of the conditions of the documents and special terms and
conditions of Contract, if any.
5.2 In the event of any conflict between the above mentioned documents the matter shall be referred to the Engineer
whose decision shall be considered as final and binding upon the parties.
6.0 USE OF CONTRACT DOCUMENTS AND INFORMATION
6.1 The Contractor shall not, without the Owner’s prior written consent, disclose the Contract, or any provision thereof,
or any specification, plan, drawing, pattern, sample or information furnished by or on behalf of the Owner in
connection therewith, to any person other than a person employed by the Contractor in the performance of the
Contract. Disclosure to any such employed person shall be made in confidence and shall extend only so far as may
be necessary for the purpose of such performance.
6.2 The Contractor shall not, without the Owner’s prior written consent, make use of any document or information
enumerated in various Contract documents except for the purpose of performing the Contract.
6.3 The Contractor shall not communicate or us in advertising, publicity, sales releases or in any other medium,
photographs or other reproduction of the Works under this Contract, or descriptions of the site, dimensions, quantity,
quality or other information, concerning the works unless prior written permission has been obtained from the
6.4 Any document, other than the Contract itself, enumerated in various Contract documents shall remain the property
of the Owner and shall be returned (in all copies) to the Owner on completion of the Contractor’s performance
under the Contract if so required by the Owner.
7.0 CONSTRUCTION OF THE CONTRACT
7.1 Notwithstanding anything stated elsewhere in the bid documents, the Contract to be entered into will be treated as
a single Contract.
Award shall be placed on the successful Bidder as follows:
For providing services like inland transportation, insurance for delivery at site, unloading, storage, handling at site,
installation, testing and commissioning including performance testing in respect of all the equipment material
equipment/materials given by the owner after observing standard store procedures for transport from owner’s
stores, insurance, unloading storage handling at site installation testing & commissioning.
7.2 In case erection Contract, or where the Owner hands over his equipment to the Contractor for executing, then the
Contractor shall at the time of taking delivery of the equipment/dispatch documents be required to execute an
Indemnity Bond in favor of the Owner in the form acceptable to the SE(TR) GETCO Jambuva for keeping the
equipment in safe custody and to utilize the same exclusively for the purpose of the said Contract. Samples of
Performa for the Indemnity Bond will be furnished during award of Contract.
7.3 The Contract shall in all respects be construed and governed according to Indian Laws.
7.4 It is clearly understood that the total consideration for the Contract(s) has been broken up into various components
only for the convenience of payment under the Contract(s) and for the measurement of deviations or modifications
under the Contract(s).
5.0 JURISDICTION OF CONTRACT
5.1 The laws applicable to the Contract shall be the laws in force in India. The Courts of Vadodara shall have exclusive
jurisdiction in all matters arising under this Contract.
6.0 EXECUTION OF CONTRACT:
6.1 The Owner, after the issue of the Letter of Award to the Contractor, will send one copy of the final agreement to the
Contractor for his scrutiny and approval.
6.2 The Agreement, unless otherwise agreed to, shall be signed within 10 days of the acceptance of the Letter of
Award, at the office the Owner at Jambuva on a date and time to be mutually agreed. The Contractor shall provide
for signing of the Contract, Performance Guarantee, appropriate power of attorney and other requisite materials. In
case the Contract is to be signed beyond the stipulated time, the Bid Guarantee submitted with the Proposal will
have to be extended accordingly.
6.3 The Agreement will be signed in copies to be specified and the Contractor shall be provided with one signed original
and the rest will be retained by the Owner.
6.4 The Contractor shall provide free of cost to the Owner all the Engineering data, drawings, and descriptive materials
submitted with the bid, to form a part of the Contract immediately after issue of Letter of Award
6.5 Subsequent to signing of the Contract, the Contractor at his own cost shall provide the Owner with copies of
agreement within fifteen (15) days after the signing of the Contractor.
7.0 ENFORCEMENT OF TERMS
Seal & Signature of Bidder
7.1 The failure of either party to enforce at any time any of the provisions of this Contract or any rights in respect thereto
or to exercise any option therein provided, shall in no way be construed to be a waiver of such provisions, rights or
options or in any way to affect the validity of the Contract. The exercise by either party of any of its rights herein
shall not preclude or prejudice either party from exercising the same or any other right it may have under the
8.0 COMPLETION OF CONTRACT
8.1 Unless otherwise terminated under the provisions of any other relevant clause, this Contract shall be deemed to
have been completed on the expiry of the guarantee period as provided for under the clause entitled ‘Guarantee’
in this section of the Volume-I.
B. GUARANTEES & LIABILITIES
9.0 TIME – THE ESSENCE OF CONTRACT
9.1 The time and the date of completion of the Contract as stipulated in the Contract by the Owner without or with
modifications, if any, and so incorporated in the Letter of Award, shall be deemed to be the essence of the Contract.
The Contractor shall so organize his resources and perform his work as to complete it not later than the date agreed
9.2 The Contractor shall submit a detailed bar chart within the time frame agreed consisting of adequate number of
activities covering various key phases of the work such as field erection activities within five (5) days of the date of
Notification of Award. This network shall also indicate the interface facilities to be provided by the Owner and the
dates by which such facilities are needed. The Contractor shall discuss the network so submitted with the Owner
and the agreed network shall form part of the Contract documents. During the performance of the Contract, if in the
opinion of the Engineer, proper progress is not maintained, suitable changes shall be made in the Contractor’s
operations to ensure proper progress without any cost implication to the Owner. The interface facilities to be
provided by the Owner in accordance with the agreed network shall also be reviewed while reviewing the progress
of the Contractor.
9.3 Based on the above agreed network/bar chart fortnightly reports shall be submitted by the Contractor as directed
by the Engineer.
9.4 Subsequent to the finalization of the network, the Contractor shall make available to the Engineer a detailed
program in line with the agreed Contract network. Such program shall be reviewed, updated and submitted to the
Engineer every month thereafter.
9.5 The above bar charts/ program shall be compatible with the Owner’s computer environment and furnished to the
Owner on such media as may be desired by the Owner.
10.0 EFFECTIVENESS OF CONTRACT
The Contract shall be considered as having come into force from the date of the commencement given by the
respective construction sub division unless otherwise provided in the notification of award.
11.0 PENALTY FOR DELAY
11.1 If the Contractor fails to successfully complete the work within the time fixed under the Contract, the Contractor
shall pay to the Owner as penalty a sum specified for each specified period of delay. The details of such penalty
are brought out in the accompanying Special Conditions of Contract (SCC).
11.2 Any delay that may take place in work execution beyond Contractual cutoff date stated as per stipulated delivery
period shall be subject to the penalty at the rate of ½ % of the delayed work value plus applicable taxes (if any) per
week or part thereof, with a ceiling of 10 % of the total contract value plus applicable taxes (if any), detailed in the
Special Conditions of Contract (SCC).
11.3 In event of failure of the Contractor to pay the amount of Penalty as demanded, the Owner shall be entitled to
deduct the amount of Penalty for delay from the amounts payable to the Contractors under any bills raised under
this contract or any other contract with the GUVNL and its Subsidiary Companies i.e. GETCO, GUVNL, GSECL,
MGVCL, DGVCL, PGVCL UGVCL. It is permissible for the Owner to adjust the amount of Penalty of delay against
any Bank Guarantee furnished by the Contractor under this contract or any other contract with GUVNL and/or its
subsidiary companies.
11.4 The penalty will be deducted from bills payable either against this contract or from any Bank Guarantee or any
other amount payable under any other contract with the GETCO.
12.1 In the event of any emergency where in the judgment of the Engineer, delay would cause serious loss or damages,
repairs or adjustment may be made by the Engineer or a third party chosen by the Engineer without advance notice
to the Contractor and the cost of such work shall be paid by the Contractor. In the event such action is taken by the
Engineer, the Contractor will be notified promptly and he shall assist wherever possible in making necessary
corrections. This shall not relieve the Contractor of his liabilities under the terms and conditions of the Contract.
Seal & Signature of Bidder
12.2 If it becomes necessary for the Contractor to rectify or renew any defective portions of the works the provision of
this clause shall apply to portion of the works so rectified or corrected until the expiry of six (6) months from the
date of such rectification or correction. If any defects are not rectified within a reasonable time, the Engineer may
proceed to do the work at the Contractor’s risk and cost but without prejudice to any other rights which the Owner
may have against the Contractor in respect of such defects.
12.3 The rectification or correction of the work will be carried out free of cost by the Contractor. If any rectification or
correction is carried out on his behalf at the site, the Contractor shall bear the cost of such rectification or correction.
12.4 The acceptance of the works by the Engineer shall in no way relieve the Contractor of his obligations under this
12.5 At the end of the guarantee period, the Contractor’s liability ceases except for latent defects. For latent defects, the
Contractor’s liability as mentioned in Clause Nos. 15.1 through 15.5 above, shall remain till the end of 6 months
from the date of completion of guarantee period.
13.0 TAXES, PERMITS & LICENCES
The Contractor shall be liable and pay all non-Indian taxes, duties, levies lawfully assessed against the Owner or
the Contractor in pursuance of the Contract. In addition the Contractor shall be responsible for payment of all Indian
duties including GST, levies and taxes lawfully assessed against the Contractor for his personal income & property
14.0 DEFENCE OF SUITS
If any action in court is brought against the Owner or Engineer or an officer or agent of the Owner, for the failure,
omission or neglect on the part of the Contractor to perform any acts, matters, covenants or things under the
Contract, or for damage or injury caused by the alleged omission or negligence on the part of the Contractor, his
agents, representatives or his Sub-Contractors, or in connection with any claim based on lawful demands of Sub-
Contractors, workmen, suppliers or employees, the Contractor shall in all such cases indemnify and keep the
Owner, and the Engineer and/or his representative, harmless from all losses, damages, expenses or decrees
arising of such action.
15.0 LIMITATION OF LIABILITIES
The final payment by the Owner in pursuance of the Contract shall mean the release of the Contractor from all his
liabilities under the Contract. Such final payment shall be made only at the end of the Guarantee/Warranty period
or after finalization of material account and final bill and till such time as the Contractual liabilities and responsibilities
of the Contractor, shall prevail. All other payments made under the Contract shall be treated as on-account
16.0 ENGINEER’S DECISION
16.1 In respect of all matters which are left to the decision of the Engineer including the granting or with-holding of the
certificates, the Engineer shall, if required to do so by the Contractor, give in writing a decision thereon.
16.2 If, in the opinion of the Contractor, a decision made by the Engineer is not in accordance with the meaning and
intent of the Contract, the Contractor may file with the Engineer, within fifteen (15) days after receipt of the decision,
a written objection to the decision.
Failure to file an objection within the allotted time will be considered as an acceptance of the Engineer’s decision
and the decision shall become final and binding.
16.3 The Engineer’s decision and the filing of the written objection thereto shall be a condition precedent to the right to
request arbitration. It is the intent of the Agreement that there shall be no delay in the execution of the works and
the decision of the Engineer as rendered shall be promptly observed.
17.0 POWER TO VARY OR OMIT WORK
17.1 No alterations, amendments, omissions, suspensions or variations of the Works (hereinafter referred to as
‘variation’) under the Contract as detailed in the Contract Documents, shall be made by the Contractor except as
directed in writing by the Engineer, but the Engineer shall have full powers subject to the provisions hereinafter
contained, from time to time during the execution of the Contract, by notice in writing to instruct the Contractor to
make such variation without prejudice to the Contract. The Contractor shall carry out such variation and be bound
by the same conditions as far as applicable as though the said variations occurred in the Contract Documents. If
any suggested variations would, in the opinion of the Contractor, if carried out, prevent him from fulfilling any of his
obligations or guarantees under the Contract, he shall notify the Engineer thereof in writing and the Engineer shall
decide forthwith whether or not, the same shall be carried out and if the Engineer confirms his instructions, the
Contractor’s obligations and guarantees shall be modified to such an extent as may be mutually agreed. Any
agreed difference in cost occasioned by any such variation shall be added to or deducted from the Contract Price
as the case may be.
17.2 In the event of Engineer requiring any variation, a reasonable and proper notice shall be given to the Contractor to
enable him to work his arrangement accordingly, and in cases where goods or materials are already prepared or
Seal & Signature of Bidder
any design, drawings or pattern made or work done as per the contract requires to be altered, a reasonable and
agreed sum in respect thereof shall be paid to the Contractor.
17.3 In any case in which the Contractor has received instructions from the Engineer as to the requirement of carrying
out the alterations or additional or substituted work which either then or later on, will in the opinion of the Contractor,
involve a claim for additional payment, the Contractor shall immediately and in no case later than thirty (30) days,
after receipt of the instructions aforesaid and before carrying out the instructions, advise the Engineer to that effect.
But the Engineer shall not become liable for payment of any charges in respect of any such variations, unless the
instructions for the performance of the same shall be confirmed in writing by the Engineer.
17.4 If any variation in the Works results in reduction of Contract Price, the parties shall agree, in writing, so to the extent
of any change in the price, before the Contractor proceeds with the change.
17.5 In all the above cases, in the event of a disagreement as to the reasonableness of the said sum, the decision of
the Engineer shall prevail.
17.6 Notwithstanding anything stated above in this clause, the Engineer shall have the full power to instruct the
Contractor, in writing, during the execution of the Contract to vary the quantities of the items or groups of items in
accordance with the provisions of clause entitled ‘Change of Quantity’ in section GCC of this Volume-I. The
Contractor shall carry out such variations and be bound by the same conditions as though the said variations
occurred in the Contract Documents. However, the Contract Price shall be adjusted at the rates and the prices
provided for the original quantities in the Contract.
18.0 ASSIGNMENT AND SUB-LE TTING OF CONTRACT:
No subletting of contract is allowed. Contractor should carry out work on his own under his or his authorized supervisor
and by labours employed by him.
19.0 CHANGE OF QUANTITY
19.1 During the execution of the Contract, the Owner reserves the right to increase or decrease the quantities of items
under the Contract but without any change in unit price or other terms & conditions. Such variations unless
otherwise specified in the accompanying Special Conditions of Contract and/or Technical Specifications, shall not
be subjected to any limitation for the individual items but the total variations in all such items under the Contract
shall be limited to a percentage of the Contract price as specified in the Special Conditions of Contract.
19.2 The Contract price shall accordingly be adjusted based on the unit rates available in the Contract for the change in
quantities as above. The base unit rates, as identified in the Contract shall however remain constant during the
currency of the Contract, except as provided for in Clause 33.0 below. In case the unit rates are not available for
the change in quantity, the same shall be subjected to mutual agreement.
20.0 COOPERATION WITH OTHER CONTRACTORS AND CONSULTING ENGINEERS
The Contractor shall agree to cooperate with the Owner’s other Contractors and Consulting Engineers and freely
exchange with them such technical information as is necessary to obtain the most efficient and economical design
and to avoid unnecessary duplication of efforts. The Engineer shall be provided with three copies of all
correspondence addressed by the Contractor to other Contractors and Consulting Engineers of the Owner in
respect of such exchange of technical information, wherever needed.
21.0 NO WAIVER OF RIGHTS
Neither the inspection by the Owner or the Engineer or any of their officials, employees, or agents nor any order by
the Owner or the Engineer for payment of money or any payment for or acceptance of, the whole or any part of the
Works by the Owner or the Engineer, nor any extension of time, nor any possession taken by the Engineer shall
operate as a waiver of any provision of the Contract, or of any power herein reserved to the Owner or any right to
damages herein provided nor shall any waiver of any breach in the Contract be held to be a waiver of any other or
subsequent breach.
22.0 CERTIFICATE NOT TO AFFECT RIGHT OF OWNER AND LIABILITY OF THE CONTRACTOR.
No interim payment certificate of the Engineer, nor any sum paid on account by the Owner, nor any extension of
time for execution of the Works granted by the Engineer shall affect or prejudice the rights of the Owner against
the Contractor or relieve the Contractor of his obligation for the due performance of the Contract, or be interpreted
as approval of the Works done or of the equipment furnished and no certificate shall create liability for the Owner
to pay for alterations, amendments, variations or additional works not ordered, in writing , by the Engineer or
discharge the liability of the Contractor for the payment of damages whether due, ascertained, or certified or not
or any sum against the payment of which he is bound to indemnify the Owner, nor shall any such certificate nor
the acceptance by him of any sum paid on account or otherwise affect or prejudice the rights of the Owner against
the Contractor.
23.0 PROGRESS REPORTS
Seal & Signature of Bidder
During the various stages of the work in pursuance of the Contract, the Contractor shall at his own cost submit
periodic progress reports as may be reasonably required by the Engineer with such materials as, charts, net-works,
photographs, test certificates, etc. Such progress reports shall be in the form and size as may be required by the
24.0 BAR CHARTS
The Bidder shall furnish along with the bid, the bar charts and project schedules indicating starting and
completion dates of each activity. This is mandatory condition the tenders without which shall be liable to be
25.0 TAKING OVER
Upon successful completion of all the tests to be performed at Site on equipment furnished and erected by the
Contractor, the Engineer shall issue to the Contractor a Taking Over Certificate as a proof of the final acceptance
of the equipment. Such certificate shall not unreasonably be withheld nor will the Engineer delay the issuance
thereof on account of minor omissions or defects which do not affect the commercial operation and/or cause any
serious risk to the equipment. Such certificate shall not relieve the Contractor of any of his obligations which
otherwise survive, by the terms and conditions of the Contract after issue of such certificate.
26.0 SECURITY DEPOSIT CUM PERFORMANCE GUARANTEE DEPOSIT :-
The successful bidder has to pay 100 % security deposit (5% of the Contract) upon placement of LOI within
days. The successful bidder will be required to pay an amount equivalent to 5 % of the value of the order as a
Security Deposit for satisfactory execution of the contract. Such Security Deposit will be payable either in BG/DD
payable at Vadodara. Bank guarantees from Scheduled / Nationalized Banks will be acceptable.
(A) Guarantees issued by the following Banks will be accepted as SD on permanent basis.
1. All Nationalized Banks.
(B) Guarantees issued by following Banks will be accepted as SD for the period up to March 31, 2027. The
validity cut-off date is with respect to date of issue of Bank Guarantee irrespective of date of termination of
Bank Guarantee.
2. AU Small Finance Bank
3. Bandhan Bank
4. City Union Bank
6. DBS Bank India Limited
8. Dhanlaxmi Bank
9. Equitas Small Finance Bank
10. FEDERAL Bank
15. IDFC First Bank
16. IndusInd Bank
17. Jammu and Kashmir Bank
18. Jana Small Finance Bank
19. Karnataka Bank
20. Karur Vysya Bank
21. Kotak Mahindra Bank
23. South Indian Bank
24. Standard Chartered Bank
25. Tamilnad Mercantile Bank
26. Ujjivan Small Finance Bank
28. Ahmedabad Mercantile Co-Op Bank
29. Nutan Nagrik Sahkari Bank Ltd.
30. Rajkot Nagrik Sahkari Bank Ltd
31. Saraswat Co-Operative Bank Ltd
32. SBPP Co-operative Bank Ltd.
33. SVC Co-Operative Bank Ltd.
34. The Cosmo Co-Op Bank Ltd.
35. The Gujarat State Co-Operative Bank
36. The Surat District Co-Operative Bank
37. The Surat People’s Co-Op. Bank Ltd
Seal & Signature of Bidder
38. The Baroda CentraI Co-operative Bank
39. The Panchmahal District Co-Operative Bank
40. The Kalupur Commercial Co-Op. Bank
41. The Rajkot Commercial Co-operative Bank
42. The Banaskantha Mercanttile Co-op. Bank
43. Gujarat Gramin Bank
Note: The banks shall be the banks recognized / notified by the Finance department, Government of Gujarat (GOG)
from time to time.
SD will be refundable after completion of Guarantee period of 06 Months from Date of completion of work.
26.1 The Bank Guarantees furnished / submitted should have one time validity till the completion of the order in all
respect and up to the expiry of the Guarantee period of Six months from the date of completion of work. Bank
Guarantee for interim period will not be allowed. If by any reason the contract period is extended, then contractor
should undertake to renew the Bank Guarantee at least one month before the expiry of the validity failing which
Corporation will be at liberty to en-cash the same, without entering into further correspondence formalities, etc in
26.2 No interest will be allowed on amount of Security deposit. The Security Deposit cum performance Guarantee
deposit of 5% on total contract value shall be valid up 6 months from the completion of work.
26.3 This security deposit is for the performance of contract and the same is liable to be forfeited by the Corporation in
event of non-fulfillment of the term and conditions of this contract by the contractor. (CORPORATE BANK
GUARANTEES NOT ALLOWED)
27.1 The payment to the Contractor for the performance of the works under the Contract will be made by the Owner as
per the guidelines and conditions specified herein. All payments made during the Contract shall be on account
payments only. The final payment will be made on completion of all Works and on fulfillment by the Contractor of
all his liabilities under the Contract.
27.2 Currency of Payment
All payments under the Contract shall be in Indian Rupees only.
Payment terms will be as prescribed in the special conditions of contract and on fulfillment of conditions specified
28.0 Payment Schedule
28.1 Application for Payment
28.2 The Contractor shall submit application for the payment in the prescribed proforma of the Owner. Performa for
application for payment will be as prescribed.
28.3 Each such application shall state the amount claimed and shall set forth in detail, in the order of the Payment
Schedule, particulars of the Works including the Works executed at Site and of the equipment shipped/brought on
to the site pursuant to the Contract upto the date mentioned in the application and for the period covered since the
last preceding certificate, if any.
28.4 Every interim payment certificate shall certify the Contract value of the Works executed upto the date mentioned in
the application for the payment certificate, provided that no sum shall be included in any interim payment certificate
in respect of the works that, according to the decision of the Engineer, does not comply with the Contract.
28.5 Mode of Payment
28.6 Payment due on dispatch of equipment shall be made by the Owner through Owner’s Bank or directly to the
Contractor as per the payment schedule.
28.7 The payment of test charges, if any, payment, taxes and duties (whenever admissible) inland transportation
(including port handling), insurance and the erection portion of the Works shall be made direct to the Contractor by
28.8 All payments under the Contract shall be made as stipulated in the Special Conditions of Contract after signing the
Contract Agreement. The payments linked with the dispatch of materials shall only be made after production of all
dispatch documents as specified in the relevant Contract conditions which will interalia include the Material
Inspection Clearance Certificate issued by the Owner.
Progressive payments linked with erection shall only be made after the issue of certificates by the Engineer, one
for the quantum of work completed and the other for the successful completion of quality check points involved in
the quantum of work billed.
29.0 DEDUCTIONS FROM CONTRACT PRICE
All costs, damages or expenses that the Owner may have paid, for which under the Contract the Contractor is
liable, or any other retention award will be claimed by the Owner. The Owner to the Contractor shall bill all such
Seal & Signature of Bidder
claims regularly as and when they fall due. Such bills shall be supported by appropriate and certified vouchers or
explanations, to enable the Contractor to properly identify such claims. Such claims shall be paid by the Contractor
within thirty (30) days of the receipt of the corresponding bills and if not paid by the Contractor within the said period,
the Owner may then deduct the amount, from any monies due or becoming due by him to the Contractor under the
Contract or may be recovered by sections of Law or otherwise.
D. RISK DISTRIBUTION
30.1 The Contractor at his cost shall arrange, secure and maintain all insurance as may be pertinent to the Works and
obligatory in terms of law to protect his interest and interests of the Owner against all perils detailed herein. The
form and the limit of such insurance as defined herein together with the under-writer in each case shall be
acceptable to the Owner. However, irrespective of such acceptance, the responsibility to maintain adequate
insurance coverage at all time during the period of Contract shall be of Contractor alone. The Contractor’s failure
in this regard shall not relieve him of any of his contractual responsibilities and obligations. The insurance covers
to be taken by the Contractor shall be in the joint name of the Owner and the Contractor. The Contractor shall,
however, be authorized to deal directly with Insurance Company or Companies and shall be responsible in regard
to maintenance of all insurance covers. Further the insurance should be in freely convertible currency.
30.2 Any loss or damage to the equipment during handling, transportation, storage, erection, putting into satisfactory
operation and all activities to be performed till the successful completion of commissioning of the equipment shall
be to the account of the Contractor. The Contractor shall be responsible for preference of all claims and make
good the damages or loss by way of repairs and/or replacement of the equipment, damaged or lost. The transfer
of title shall not in any way relieve the Contractor of the above responsibilities during the period of Contract. The
Contractor shall provide the Owner with copy of all insurance policies and documents taken out by him in pursuance
of the Contract. Such copies of documents shall be submitted to the Owner immediately after such insurance
coverage. The Contractor shall also inform the Owner in writing at least sixty (60) days in advance regarding the
expiry/cancellation and/or change in any of such documents and ensure revalidation, renewal etc., as may be
necessary well in time.
30.3 The perils required to be covered under the insurance shall include, but not be limited to fire and allied risks,
miscellaneous accidents (erection risks) workman compensation risks, loss or damage in transit, theft, pilferage,
riot and strikes and malicious damages, civil commotion, weather conditions, accidents of all kinds, etc. The scope
of such insurance shall be adequate to cover the replacement/reinstatement cost of the equipment for all risks up
to and including delivery of goods and other costs till the equipment is delivered at Site. The insurance policies to
be taken should be on replacement value basis and/or incorporating escalation clause. Notwithstanding the extent
of insurance cover and the amount of claim available from the underwriters, the Contractor shall be liable to make
good the full replacement/rectification value of all equipment/materials and to ensure their availability as per project
30.4 All costs on account of insurance liabilities covered under the Contract will be on Contractor’s account and will be
included in Contract Price, However, the Owner may from time to time, during the pendency of the Contract, ask
the Contractor in writing to limit the insurance coverage, risks and
in such a case, the parties to the Contract will agree for a mutual settlement, for reduction in Contract price to the
extent of reduced premia amount. The Contractor, while arranging the insurance shall ensure to obtain all discounts
on premia, which may be available for higher volume or for reason of financing arrangement of the project.
30.5. The clause entitled ‘Insurance’ under the section ECC of this Volume-I, covers the additional insurance
requirements for the portion of the works to be performed at the Site.
30.6 Special Conditions of Contract details out the various insurance liabilities.
35.0 LIABILITY FOR ACCIDENTS AND DAMAGES
Under the Contract, the Contractor shall be responsible for loss or damage to the plant until the successful
completion of commissioning as defined elsewhere in the Bid document.
36.0 DELAYS BY OWNER OR HIS AUTHORISED AGENTS
36.1 In case the Contractor’s performance is delayed due to any act of omission on the part of the Owner or his
authorized agents, then the Contractor shall be given due extension of time for the completion of the Works, to the
extent such omission on the part of the Owner has caused delay in the Contractor’s performance of the Contract.
Regarding reasonableness or otherwise of the extension of time, the decision of the Engineer shall be final.
36.2 In addition, the Contractor shall be entitled to claim demonstrable and reasonable compensation if such delays
have resulted in any increase in cost. The Owner shall examine the justification for such a request for claim and if
satisfied, the extent of compensation shall be mutually agreed depending upon the circumstances at the time of
such an occurrence.
37.0 DEMURRAGE, WHARFAGE, ETC.
Seal & Signature of Bidder
All demurrage, warfare and other expenses incurred due to delayed clearance of the material or any other reason
shall be to the account of the Contractor.
38.0 FORCE MAJEURE
38.1 Force majeure is herein defined as any cause which is beyond the control of the Contractor or the Owner as the
case may be, which they could not foresee or with a reasonable amount of diligence could not have foreseen and
which substantially affects the performance of the Contract, such as:
a. Natural phenomena, including but not limited to floods, droughts, earthquakes and epidemics;
b. Acts of any Government, domestic or foreign, including but not limited to war, declared or undeclared, priorities,
guarantees, and embargoes.
Provided either party shall within fifteen (15) days from the occurrence of such a cause notify the other in writing of
38.2 The Contractor or the Owner shall not be liable for delays in performing his obligations resulting from any force
majeure cause as referred to and/or defined above:
The date of completion will, subject to hereinafter provided, be extended by a reasonable time even though such
cause may occur after Contractor’s performance of obligation has been delayed due to other causes.
39.0 SUSPENSION OF WORK
39.1 The Owner reserves the right to suspend and reinstate execution of the whole or any part of the Works without
invalidating the provisions of the Contract. Orders for suspension or reinstatement of the Works will be issued by
the Engineer to the Contractor in writing. The time for completion of the works will be extended for a period equal
to duration of the suspension.
39.2 Any necessary and demonstrable cost incurred by the Contractor as a result of such suspension of the works will
be paid by the Owner, provided such costs are substantiated to the satisfaction of the Engineer. The Owner shall
not be responsible for any liabilities if suspension or delay is due to some default on the part of the Contractor or
his Sub-Contractor.
40.0 “RIGHTS OF THE OWNER:
Whenever any claim or claims for payment of a sum of money arises out of or under the contract against the
Contractor, the Owner shall be entitled to withhold and also have a lien to retain such sum or sums in whole or in
port from the security, If any, deposited by the Contractor and for the purpose aforesaid, the Owner shall be entitled
to encash and withhold the amount of Performance Bank Guarantee or other security, if any, furnished as the case
may be. The Owner shall also have a lien over the same pending finalization or adjudication of any such claim. In
the event Of the security is insufficient to cover the claimed amount or amounts, the Owner shall be entitled to
withhold and have lien to retain to the extent of the such claimed amount or amounts referred to above, from any
sum or sums found payable or which at any time thereafter may become payable to the Contractor under the same
contract or any other contract with the Owner or GUVNL or its subsidiary companies pending finalization or
adjudication of any such claim.
Lien in respect of Claims in other Contracts:
a) Any sum of money due and payable, to the Contractor (Including the security deposit) under the contract may
be withheld or retained by way of lien by the Owner against any of its claim in respect of payment of a sum of
money arising out of or under any other contract made by the Contractor with the Owner or GUVNL or any of its
subsidiary companies.
b) It is on agreed that the sum of money so withheld or retained under this clause by the Owner will be kept
withheld or retained as such by the Owner till its claim arising out of the same contract or any other contract is
either mutually settled or determined by the arbitrator or competent court, as the case may be, and the Contractor
shall have no claim for interest or damages whatsoever on this account or on any other ground in respect of any
sum of money withheld or retained under this clause and as may be duly notified to the Contractor.
41.0 CONTRACTOR`S DEFAULT
41.1 If the Contractor shall neglect to execute the works with due diligence and expedition or shall refuse or neglect to
comply with any reasonable order given to him, in writing by the Engineer in connection with the works or shall
contravene the provisions of the Contract, the Owner may give notice in writing to the Contractor to make good the
failure, neglect or contravention complained of. Should the Contractor fail to comply with the notice within thirty
(30) days from the date of serving the notice, then and in such case the Owner shall be at liberty to employ other
workmen and forthwith execute such part of the works as the Contractor may have neglected to do or if the Owner
shall think fit, without prejudice to any other right he may have under the Contract to take the work wholly or in part
out of the Contractor’s hands and re-contract with any other person or persons to complete the works or any part
Seal & Signature of Bidder
thereof and in that event the Owner shall have free use of all Contractor’s equipment that may have been at the
time on the Site in connection with the works without being responsible to the Contractor for fair wear and tear
thereof and to the exclusion of any right of the Contractor over the same, and If the sum that the contractor is
entitled to be paid plus the costs incurred by the Owner in completing the works, exceeds the Contract Price or the
entire works if entire works have been completed or the price for part of the work if part of the works have been
completed, the Contractor shall be liable for such excess.
If such excess is greater than the sums due to the Contractor, the Contractor shall pay the balance to the Owner
and if such excess is less than the sums due to the Contractor, Owner shall pay the balance to the Contractor. For
facilitating such payment, Owner shall pay the balance to the contractor. For facilitating such payment, Owner shall
encash the Bank Guarantees of Contactor available with Owner/s and retain such other payment due to the
Contractor under the Contract in question or any other Contract that the Owner/s may have with the Contractor.
Such payment of excess amount shall be independent of the liquidated damages for delay which the Contractor
shall have to pay if the completion of works is delayed.
41.2 In addition, such action by the Owner as aforesaid shall not relieve the Contractor of his liability to pay liquidated
damages for delay in completion of Works as defined in Clause 14.0 of this Section.
41.3 Such action by the Owner as aforesaid the termination of the Contract under this clause shall not entitle the
Contractor to reduce the value of the Contract Performance Guarantee nor the time thereof. The Contract
Performance Guarantee shall be valid for the full value and for the full period of the Contract including guarantee
42.0 TERMINATION OF CONTRACT ON OWNER`S INITIATIVE
42.1 The Owner reserves the right to terminate the Contract either in part or in full due to reasons other than those
mentioned under clause entitled ‘Contractor’s Default’. The Owner shall in such an event give fifteen (15) days
notice in writing to the Contractor of his decision to do so.
42.2 The Contractor upon receipt of such notice shall discontinue the work on the date and to the extent specified in the
notice, make all reasonable efforts to obtain cancellation of all orders and Contracts to the extent they are related
to the work terminated and terms satisfactory to the Owner, stop all further sub-contracting or purchasing activity
related to the work terminated, and assist Owner in maintenance, protection, and disposition of the works acquired
under the Contract by the Owner.
In the event of such a termination the Contractor shall be paid compensation, equitable and reasonable, dictated
by the circumstances prevalent at the time of termination.
42.3 If the Contractor is an individual or a proprietary concern and the individual or the proprietor dies and if the
Contractor is a partnership concern and one of the partners dies then unless the Owner is satisfied that the legal
representatives of the individual Contractor or of the proprietor of the propriety concern and in the case of
partnership, the surviving partners, are capable of carrying out and completing the Contract the Owner shall be
entitled to cancel the Contract as to its incomplete part without being in any way liable to payment of any
compensation to the estate of deceased Contractor and/or to the surviving partners of the Contractor’s firm on
account of the cancellation of the Contract. The decision of the Owner that the legal representatives of the
deceased Contractor or surviving partners of the Contractor’s firm cannot carry out and complete the Contract shall
be final and binding on the parties. In the event of such cancellation the Owner shall not hold the estate of the
deceased Contractor and/or the surviving partners of the estate of the deceased Contractor and/or the surviving
partners of the Contractor’s firm liable to damages for not completing the Contract.
43.0 FRUSTRATION OF CONTRACT
43.1 In the event of frustration of the Contract because of supervening impossibility in terms of Section 56 of the Indian
Contract Act, parties shall be absolved of their responsibility to perform the balance portion of the Contract, subject
to provisions contained in sub-clause 42.3 below.
43.2 In the event of non-availability or suspension of funds for any reasons, whatsoever (except for reason of willful or
flagrant breach by the Owner) and/or Contractor then the works under the Contract shall be suspended.
Furthermore, if the Owner is unable to make satisfactory alternative arrangements for financing to the Contractor
in accordance with the terms of the Contract within three months of the event, the parties hereto shall be relieved
from carrying out further obligations under the Contract treating it as frustration of the Contract.
43.3 In the event referred to in sub-clauses 42.1 & 42.2 above the parties shall mutually discuss to arrive at reasonable
settlement on all issues including amounts due to either party for the work already done on quantum merit basis
which shall be determined by mutual agreement between the parties.
44.0 GRAFTS AND COMMISSIONS ETC.
Any graft, commission, gift or advantage given, promised or offered by or on behalf of the Contractor or his
partner(s), agent(s), officer(s), director(s), employee(s) or servant(s) or any one on his or their behalf in relation to
the obtaining or to the execution of this or any other Contract with the Owner, shall in addition to any criminal liability
Seal & Signature of Bidder
which it may incur, subject the Contractor to the cancellation of this and all other Contracts and also to payment of
any loss or damage to the Owner resulting from any cancellation. The Owner shall then be entitled to deduct the
amount so payable from any monies otherwise due to Contractor under the Contract.
E. RESOLUTION OF DISPUTES
45.0 SETTLEMENT OF DISPUTES
45.1 Any dispute(s) or difference(s) arising out of or in connection with the Contract shall, to the extent possible, be
settled amicably between the parties.
45.2 If any dispute or difference of any kind, whatsoever, shall arise between the Owner and the Contractor, arising out
of the Contract for the performance of the Works whether during the progress of the Works or after its completion
or whether before or after the termination, abandonment or breach of the Contract, it shall, in the first place, be
referred to and settled by the Engineer, who, within a period of thirty (30) days after being requested by either party
to do so, shall give written notice of his decision to the Owner and the Contractor.
45.3 Save as hereinafter provided, such decision in respect of every matters so referred shall be final and binding upon
the parties until the completion of the Works and shall forthwith be given effect to by the Contractor who shall
proceed with the Works with all due diligence, whether he or the Owner requires arbitration as hereinafter provided
45.4 If after the Engineer has given written notice of his decision to the parties, no claim to arbitration has been
communicated to him by either party within thirty (30) days from the receipt of such notice, the said decision shall
become final and binding on the parties.
45.5 In the event of the Engineer failing to notify his decision as aforesaid within thirty (30) days after being requested
as aforesaid, or in the event of either the Owner or the Contractor being dissatisfied with any such decision, or
within thirty (30) days after the expiry of the first mentioned period of thirty days, as the case may be, either party
may require that the matters in dispute be referred to arbitration as hereinafter provided.
46.0 ARBITRATION
(1) Amicable Settlement
Any dispute, difference, controversy or claim between the Parties arising out of or relating to this contract with
reference to the construction, interpretation, breach, termination or validity thereof (hereinafter referred as "the
Dispute") shall, upon the written request of either Party be referred to the authorized representatives of the Disputing
Parties for resolution. The authorized representatives shall promptly meet and attempt to negotiate in good faith a
resolution of the Dispute within thirty days of the service of the request.
(2) Arbitration
If the parties fail to amicably resolve the disputes or differences or contrary claims as indicated herewith in sub
clause (1) of Clause, arising under or in connection with the present works contracts, whether pertaining to works
contracts alone or works and procurement both, the same shall be referred to arbitration under the Gujarat Public
Works Contracts Disputes Arbitration Tribunal Act, 1992."
47.0 RECONCILIATION OF ACCOUNTS
The Contractor shall prepare and submit every two months, a statement covering payments claimed and the
payments received vis-a-vis the works executed, for reconciliation of accounts with the Owner. The Contractor
shall also prepare and submit a detailed account of Owner Issue materials received and utilized by him for
reconciliation purpose in a format to be discussed & finalized with the Owner before the award of Contract.
48.0 Termination of Contract:
In case of contractor fails to complete the transmission line work or part thereof within contractual period or in
case the work is found not in accordance with prescribed specification the GETCO shall exercise its discretionary
48.1 To recover, from the contractor as agreed, by way of penalty clause above applicable taxes (if any)
48.2 To get the work done other contractor after giving due notice to the contractor on account and at the risk of the
contractor for such work executed or other similar description without canceling the contract in respect of the
works not yet due for completion or
49.0 To cancel the contract.
In the event of the risk works of similar description, the opinion of the GETCO shall be final. In the event of action
taken under clause (A) or (B) above, the contractor shall be liable to pay for any loss which the GETCO may
sustain on that account, but the contractor shall not be entitled to have any saving on such purchases made
against default.
The decision of the GETCO shall be final as regards to the acceptability of stores supplied by the contractor and
the GETCO shall not be required to give any reason in writing or otherwise at any time for rejection of the stores.
50.0 LABOUR LAWS:
Seal & Signature of Bidder
50.1 Persons below the age of 18 years shall not be employed for the work. No female worker shall be employed in the
night shift between 07.00 p.m. and 06.00 a.m. next day.
50.2 Contractor shall maintain a valid labor license under the contract Labor (Regulation and abolition) Act for employing
necessary manpower required by him. In the absence of such license, the contract shall be liable to be terminated
without assigning any reason thereof.
50.3 The Contractor shall at his own expenses comply with all labor laws and keep the GETCO indemnified in respect
thereof. Some of the major liabilities under various labor and industrial laws which the Contractor shall comply with,
i) Payment of contribution by way of Employer’s Contribution towards provident Fund, Family Pension
Scheme, Deposit Linked Insurance Scheme, Administrative charges, etc. at the rates made applicable from
time to time by the Government of Gujarat / Government of India or other Statutory Authority.
ii) Payment of deposit in respect of each contract labor at the rate of Rs. 30/- or later prevailing rate with the
Office of Commissioner of Labor as per the Contract Labor (Regulation and Abolition) Act.
iii) License fee as prescribed under the Contract Labor (Regulation and Abolition) Act and Rules framed there
under depending upon the number of workmen.
iv) Paid leave facility and wages as per the provision of the Factories Act at the rate of one day for every
days of working.
v) Identity cards as prescribed under the Factories Act with photo affixed thereto, for identification.
vi) Payment of retrenchment compensation, Notice Pay and other liabilities as per Industrial Dispute Act. Any
payment to the Contractor’s employee arising out of any claim of disputes under the Industrial Disputes Act
1947 or any other Labour Laws.
vii) Payment of compensation in case of accidental injury.
viii) Provision of crèche if the female laborers employed are more than
ix) Maternity Leave as per the provisions of the Maternity Benefit Act.
The above are some of the major liabilities of the Contractor in addition to other liabilities prescribed under the
various labour laws, in force from time to time, from Statutory Authorities like State Government/ Government o
India, which the Contractor shall have to comply with.
50.4 PROVIDENT FUND AND FAMILY PENSION SCHEME:
The Contractor shall submit along with his bills (month wise) a statement regarding deduction against employees
Provident Fund and Family Pension Scheme in respect of each concerned employee. Provident Fund and Family
Pension Scheme at the rate of 18% (or at the rate made applicable by the Government from time to time of the
wages. The Contractor’s contribution and his worker’s contribution towards Provident Fund and Family Pension
Scheme shall be deposited by the Contractor with Regional Provident Fund Commissioner, Ahmedabad.
50.5 DEPOSIT LINKED INSURANCE SCHEME
The contractor shall have to deposit ½ % of the wages in respect of employees who is a member of the Provident
Fund, as the contribution to the Deposit Linked Insurance Scheme with Regional Provident Fund Commissioner,
50.6 ADMINISTRATIVE CHARGES:
Administrative charges for maintaining Provident Fund Account shall be deposited by the Contractor with Regional
Provident Fund Commissioner, Ahmedabad at the rates applicable.
50.7 PAID LEAVE FACILITY:
Paid Leave Facility at the rate of one day for every twenty days worked by the Contract Labor, shall be provided by
the Contractor to his workers. He shall maintain Leave Records, Leave Cards, for individual laborer which shall be
duly verified, approved and certified by the authorized Officer of the GETCO.
50.8 WORKMAN’S COMPENSATION FUND AND EMPLOYER’S LIABILITY INSURANCE:
The contractor shall cover all his employees under workmen’s compensation fund and under the liability insurance.
The purchaser shall not be responsible for any payments of compensation to the workers/supervisor of the
contractor for fatal or non-fatal accidents during the pungency of the contract.
50.9 The contractor shall employ adequate number of experienced skilled at site for daily supervision and for
maintenance of various registers and records required under the law and contract. No payment for supervision
shall be admissible.
50.10 CONTRCTOR TO INDEMNIFY THE GETCO:
Seal & Signature of Bidder
The Contractor shall Indemnify the GETCO and every member officer and employees of the GETCO also,
Engineer-in-Charge and his staff against all actions, proceedings, claims, demands, costs and expenses
whatsoever, arising out of or in connection with the matters referred herein above elsewhere and against all actions,
proceedings, claims, demands, costs and expenses which may be made against the GETCO or Government for or
in respect of performance of his obligation under the contract documents. The GETCO shall not be liable for
intervention of authority Government for or in respect of performance of his obligation under the contract
documents. The GETCO shall not be liable for or in respect of or in consequence of any accident or injury to any
workman or other person in the employment of the Contractor or his Sub-Contractor and the contractor shall
indemnify and keep indemnified the GETCO against all claims, demands, proceedings, cost, charges and expenses
whatsoever in respect thereof or in relation thereto.
50.11 WORKMEN’S COMPENSATION AND EMPLOYER’S LIABILITY INSURANCE
Insurance shall be affected for all the Contractor’s employee engages in the performance of this contract. If any of
the work is sublet, the Contractor shall require the Sub-Contractor to provide workmen’s employer’s liability
insurance for the latter’s employees, such employees shall be covered under the Contractor’s Insurance.
50.12 WAGES TO BE PAID & TIME OF PAYMENT ETC. BY THE CONTRACTOR
a) The Contractor shall pay minimum wages per day to his Labors/ Workers as per rates fixed under the minimum
wages act. The wages of every Contract Labor employed by him under this contract shall also be paid by him
before the expiry of 7th day of the last day of the month in respect of the wages are payable (i.e. wages of a month
have to be paid by him in the first week of the next month). Any default will result in cancellation of contract
forthwith or else the contractor shall be punishable to the extent of Rs. 100/- per each day or as per the prevailing
rules of labor laws.
b) The Contractor shall give his Telephone Number and Address to the GETCO, so that, in case of labor trouble etc.
the Contractor can be contacted. The Contractor shall arrange to have his office outside the factory work premises
and the Contractor shall arrange to have his office outside the factory work premises and the Contractor shall
keep himself present throughout the working hours.
51.0 REGISTRATION WITH PROVIDENT FUND OFFICE
I) The separate P.F. code issued from P.F. commissioner is required to be taken by contractor.
ii) If the contractor does not possess separate P.F. code number of RPFC, his tender will not be considered
for acceptance.
iii) The contractor should mention separate P.F. code number allotted by PPFC, along with the tender.
Date: Superintending Engineer (TR)
(Signature of Contractor) GETCO,C.O., Jambuva
Seal & Signature of Bidder
ERECTION CONDITIONS OF CONTRACT
1.1 The following shall supplement the conditions already contained in other parts of these specifications & document
and shall govern the portion of the work of this Contract to be performed at Site.
1.2 The Contractor upon signing of the Contract shall, nominate a responsible officer as his representative at Site
suitably designated for the purpose of overall responsibility and coordination of the works to be performed at Site.
Such person shall function from the Site office of the Contractor during the pendency of Contract.
2.0 REGULATION OF LOCAL AUTHORITIES AND STATUTES
2.1 The Contractor shall comply with all the rules and regulations of local authorities during the performance of his field
activities. He shall also comply with the Minimum Wages Act, 1948 and the Payment of Wages Act (both of the
Government of India) and the rules made there under in respect of any employee or workman employed or engaged
by him or his Sub-Contractor. He shall abide by labour laws and others as specified in the special conditions of
2.2 All initial registration and statutory inspection fees, if any, in respect of his work pursuant to this Contract shall be
to the account of the Contractor. Should any such inspection or registration need to be re-arranged due to the fault
of the Contractor or his Sub Contractor, the additional fees to such inspection and/or registration also shall be borne
by the Contractor.
3.0 OWNER’S LIEN ON EQUIPMENT
The Owner shall have lien on all tower, H-frame, Stringing and other line material brought to the Site for the purpose
of erection, testing and commissioning of the line to be erected under the Contract. The Owner shall continue to
hold the lien on all such material throughout the period of Contract. No material brought to the Site shall be removed
from the Site by the Contractor and/or his Sub-Contractors without the prior written approval of the Engineer.
4.0 CONTRACTOR’S SITE ESTABLISHMENT
The Contractor shall at all times keep posted an authorized representative for the purpose of the Contract. Any
written order or instruction of the Engineer or his duly authorized representative shall be communicated to the said
authorized resident representative of the Contractor and the representative shall be available at a stated address
for this purpose.
5.0 ACCESS TO SITE AND WORKS ON SITE
5.1 Suitable access to and possession of the Site shall be afforded to the Contractor by the Owner in reasonable time.
5.2 The works so far as it is carried out on the Owner’s premises, shall be carried out at such time as the Owner may
approve and the Owner shall give the Contractor reasonable facilities for carrying out the works.
5.3 In the execution of the works, no person other than the Contractor or his duly appointed representative, Sub-
Contractor and workmen, shall be allowed to do work on the Site,except by the special permission, in writing of the
Engineer or his representative.
6.0 CO-OPERATION WITH OTHER CONTRACTORS
6.1 The Contractor shall co-operate with all other Contractors or tradesmen of the Owner, who may be performing other
works on behalf of the Owner and the workmen who may be employed by the Owner and doing work in the vicinity
of the Works under the Contract. The Contractor shall also so arrange to perform his work as to minimize, to the
maximum extent possible, interference with the work of other Contractors and their workmen. Any injury or damage
that may be sustained by the employees of the other Contractors and the Owner, due to the Contractor’s work shall
promptly be made good at the Contractor’s own expense.
7.0 DISCIPLINE OF WORKMEN
The Contractor shall adhere to the disciplinary procedure set by the Engineer in respect of his employees and
workmen at Site. The Engineer shall be at liberty to object to the presence of
any representative or employee of the Contractor at the Site, if in the opinion of the Engineer such employee has
misconduct himself or is incompetent or negligent or otherwise undesirable and then the Contractor shall remove
such a person objected to and provide in his place a competent replacement.
8.0 CONTRACTOR’S FIELD OPERATION
8.1 The Contractor shall keep the Engineer informed in advance regarding his field activity plans and schedules for
carrying-out each part of the works. Any review of such plan or schedule or method of work by the Engineer shall
not relieve the Contractor of any of his responsibilities towards the field activities. Such reviews shall also not be
considered as an assumption of any risk or liability by the Engineer or the Owner or any of his representatives and
no claim of the Contractor will be entertained because of the failure or inefficiency of any such plan or schedule or
Seal & Signature of Bidder
method of work reviewed. The Contractor shall be solely responsible for the safety, adequacy and efficiency of
plant and equipment and his erection methods.
8.2 The Contractor shall have the complete responsibility for the conditions of the Work-site including the safety of all
persons employed by him or his Sub–Contractor and all the properties under his custody during the performance
of the work. This requirement shall apply continuously till the completion of the Contract and shall not be limited to
normal working hours.
9.0 PROGRESS REPORT
9.1 The Contractor shall furnish three (3) copies each to the Engineer of progress including if any, photographs of the
work done at Site.
9.2 The monthly progress report detailing-out the progress achieved on all erection activities shall highlight comparison
to the schedules. The report shall also indicate the reasons for the variance between the scheduled and actual
progress and the action proposed for corrective measures, wherever necessary.
10.0 MAN-POWER REPORT
10.1 The Contractor shall submit to the Engineer, on the first day of every month, a man hour’s schedule for the
month, detailing the man hours scheduled for the month, skill-wise and area-wise.
11.0 PROTECTION OF WORK
The Contractor shall have total responsibility for protecting his works till it is finally taken over by the Engineer. No
claim will be entertained by the Owner or by the Engineer for any damage or loss to the Contractor’s works and the
Contractor shall be responsible for complete restoration of the damaged works to original conditions to comply with
the specification and drawings.
12.0 EMPLOYMENT OF LABOUR
12.1 The Contractor will be expected to employ on the work only his regular skilled employees with experience of his
particular work. No person below the age of eighteen years shall be employed.
12.2 All traveling expenses including provisions of necessary transport to and from Site, lodging, allowances and other
payments to the Contractor’s employees shall be the sole responsibility of the Contractor.
12.3 In case the Owner becomes liable to pay any wages or dues to Labour or any Government agency under any of
the provisions of the Minimum Wages Act, Workmen Compensation Act, Contract Labour Regulation Abolition Act
or any other law due to act of omission of the Contractor, the Owner may make such payment and shall recover
the same from the Contractor’s bills.
13.0 FACILITIES TO BE PROVIDED BY THE OWNER
13.1 Space : Land for Contractor’s Store, Workshop etc.
a) The Engineer shall at his discretion and for the duration of execution of the Contract make available at site, land for
construction of Contractor’s field office, workshop, stores,etc. required for execution of the Contract. Any such
temporary construction shall be done by the Contractor at his cost.
b) On completion of work the Contractor shall hand over the land duly cleaned to the Engineer. Until and unless the
Contractor has handed over the vacant possession of land allotted to him for the above purpose, the payment of his
final bill shall not be made.
13.2 Electricity:
The concerned Executive Engineer shall apply for temporary connection at site.Sub-division paying required service
charges & deposit.Such temporary connections to be released on the name of Contractor on recommendation of the
concerned Executive Engineer. The power so consumed shall be charged at the prevailing tariff rate
14.0 FACILITIES TO BE PROVIDED BY THE CONTRACTOR
14.1 Tools, tackles and scaffoldings
The Contractor shall provide all the construction equipments; tools, tackles and scaffoldings required for pre-
assembly, erection, of the Towers, H-frame, string, earthing etc, covered under the Contract. He shall submit a list
of all such materials to the Engineer before the commencement of work at Site. These tools and tackles shall not
be removed from the Site without the written permission of the Engineer.
The Contractor shall provide necessary first-aid facilities for all his employees, representatives and workmen
working at the Site. Enough number of Contractor’s personals shall be trained in administering first-aid.
14.3 Cleanliness
The Contractor shall be responsible for keeping the entire area allotted to him clean and free from rubbish, debris
etc. during the period of Contract. The Contractor shall employ enough number of personnel to keep the work area
clean. Materials and stores shall be so arranged to permit easy cleaning of the area. In areas where equipment
might drip oil and cause damage to the floor surface, a suitable protective cover of a flame resistant, oil proof sheet
shall be provided to protect the floor from such damage.
Seal & Signature of Bidder
15.0 LINES AND GRADES
All the works shall be performed to the lines, grades and elevations indicated on the drawings. The Contractor shall
be responsible to locate and lay-out the works. Basic horizontal and vertical control points will be established and
marked by the Engineer at site at suitable points. These points shall be used as datum for the works under the
Contract. The Contractor shall inform the Engineer well in advance of the times and places at which he wishes to
do work in the area allotted to him so that suitable datum points may be established and checked by the Engineer
to enable the Contractor to proceed with his works. Any work done without being properly located may be removed
and/or dismantled by the Engineer at Contractor’s expense.
16.0 FIRE PROTECTION
16.1 The work procedures that are to be used during the erection shall be those, which minimize fire hazards to the
extent practicable. Combustible materials, combustible waste and rubbish shall be collected and removed from the
Site at least once each day. Fuels, oils and volatile or inflammable materials shall be stored away from the
construction and equipment and materials storage areas.
16.2 All the Contractor’s supervisory personnel and select number of workers shall be trained for fire fighting. Enough
of such trained personnel must be available at the Site during the entire period of the Contract.
The Contractor shall have total responsibility for all equipment and materials in his custody/stores, loose, semi-
assembled and/or erected by him at Site. The Contractor shall make suitable security arrangements ensure the
protection of all materials, equipment and works from theft, fire, pilferage and any other damages and loss.
18.0 MATERIALS HANDLING AND STORAGE
18.1 All the material furnished under the Contract and arriving at Site shall be promptly received, unloaded, transported
and stored in the storage spaces by the Contractor.
18.2 Contractor shall be responsible for examining all the shipment and notify the Engineer immediately of any damages,
storage, discrepancy etc, for the purpose of Engineer’s information only. The Contractor shall submit to the
Engineer every week a report detailing all the receipts during the week. However, the Contractor shall be solely
responsible for any shortages or damages in transit, handling and / or in storage and erection of the equipment at
Site. Any demurrage, wharf age and other such charges claimed by the transporters, railways etc, shall be to the
account of the Contractor.
18.3 The Contractor shall maintain an accurate and exhaustive record detailing out the list of all equipment materials
received by him for the purpose of erection and keep such record open for the inspection of the Engineer in-charge.
18.4 All material shall be handled very carefully to prevent any damage or loss. The equipment stored shall be properly
protected to prevent damage either to the equipment or to the floor where they are stored. The equipment from the
store shall be moved to the actual location at the appropriate time so as to avoid damage of such equipment at
18.5 All material shall be protected against moisture ingress and corrosion during storage and periodically inspected
18.6 The consumable and other supplies likely to deteriorate due to storage must be thoroughly protected and stored in
a suitable manner to prevent damage or deterioration in quality by storage.
18.7 All the materials stored in the open or dusty location must be covered with suitable weatherproof and flame proof
covering material wherever applicable.
18.8 If the materials belonging to the Contractor are stored in areas other than those earmarked for him, the Engineer
will have the right to get it moved to the area earmarked for the Contractor at the Contractor’s cost.
18.9 The Contractor shall be responsible for making suitable indoor storage facilities to store all equipment, which require
indoor storage. Normally, all the electrical equipment such as motors, control gears, generators, exciters and
consumables like electrodes, lubricants etc. shall be stored in the closed storage space. The Engineer, in addition,
may direct the Contractor to move certain other materials, which in his opinion will require indoor storage, to indoor
storage areas, which the Contractor shall strictly comply with.
19.0 CONSTRUCTION MANAGEMENT
19.1 The field activities of the Contractors working at Site will be coordinated by the Engineer and the Engineer’s decision
shall be final in resolving any disputes or conflicts between the Contractor and other Contractors and the tradesmen
of the Owner regarding scheduling and coordination of work. Such decision by the Engineer shall not be a cause
for extra compensation or extension of time for the Contractor.
19.2 The Engineer shall hold weekly meetings of the Contractor at Site, at a time and place to be designated by the
Engineer. The Contractor shall attend such meetings and take notes of discussions during the meeting and the
decision of the Engineer and shall strictly adhere to those decisions in performing his works. In addition to the
above weekly meeting, the Engineer may call for other meetings either with individual Contractors or with selected
number of Contractors and in such a case the Contractors if called, will also attend such meetings.
19.3 Time is the essence of the Contract and the Contractor shall be responsible for performance of his works in
accordance with the specified construction schedule. If at any time, the Contractor is falling behind the schedule,
Seal & Signature of Bidder
he shall take necessary action to make good for such delays by increasing his work force or by working overtime
or otherwise accelerate the progress of the work to comply with the schedule and shall communicate such actions
in writing to the Engineer, satisfying that his action will compensate for the delay. The Contractor shall not be
allowed any extra compensation for such action.
19.4 The Engineer shall, however, not be responsible for provision of additional labour and/or materials or supply or any
other services to the Contractor except for the coordination work between various Contractors if any at site.
20.0 FIELD OFFICE RECORDS
The Contractor shall maintain up to date copies of all drawings, specifications and other Contract Documents and
any other supplementary data complete with all the latest revisions thereto. The Contractor shall also maintain in
addition the continuous record of all changes to the above Contract Documents, drawings, specifications, and
supplementary data, etc. effected at the field and on completion of his total assignment under the Contract shall
incorporate all such changes on the drawings and other Engineering data to indicate as installed conditions of the
equipment furnished and erected under the Contract. Such drawings and Engineering data shall be submitted to
the Engineer in required number of copies.
21.0 CONTRACTOR’S MATERIALS BROUGHT TO SITE
21.1 The Contractor shall bring to Site all materials, including construction equipment, tools and tackles for the purpose
of the works under intimation to the Engineer. All such goods shall, from the time of their being brought vest in the
Owner, but may be used for the purpose of the works only and shall not on any account be removed or taken away
by the Contractor without the written permission of the Engineer. The Contractor shall nevertheless be solely liable
and responsible for any loss or destruction thereof and damage thereto.
21.2 The Owner shall have a lien on such goods for any sum or sums which may at any time be due or owing to him by
the Contractor, under, in respect of or by reasons of the Contract. After giving a fifteen (15) days notice in writing
of his intention to do so, the Owner shall be at liberty to sell and dispose off any such goods, in such manner as he
shall think fit and to apply the proceeds in or towards the satisfaction of such sum or sums due as aforesaid.
21.3 After the completion of the Works, the Contractor shall remove from the Site under the direction of the Engineer
the materials such as construction equipment, erection tools and tackles, scaffolding etc. with the written permission
of the Engineer.
22.0 PROTECTION OF PROPERTY AND CONTRACTOR’S LIABILITY
22.1 The Contractor shall be responsible for any damage resulting from his operations. He shall also be responsible for
protection of all persons including members of public and employees of the Owner and the employees of other
Contractors and Sub-Contractors and all public and private property.
23.1 In addition to the conditions covered under the Clause entitled ‘Insurance’ in General Terms and Conditions of
Contract of this Volume-I, the following provisions will also apply to the portion of works to be done beyond the
Contractor’s own or his Sub-Contractor’s manufacturing Works.
23.2 Workmen’s Compensation Insurance
This insurance shall protect the Contractor against all claims applicable under the Workmen’s Compensation Act,
1948 (Government of India). This policy shall also cover the Contractor against claims for injury, disability, disease
or death of his or his Sub-Contractor’s employee, which for any reason are not covered under the Workmen’s
Compensation Act, 1948. The liabilities shall not be less than:
Workmen’s : As per statutory
Compensation Provisions
Employee’s : As per statutory
Liability Provisions
23.3 Comprehensive General Liability Insurance
The insurance shall protect the Contractor against all claims arising from injuries, disabilities, disease or death of
members of public or damage to property of others, due to any act of omission on the part of the Contractor, his
agents, his employees, his representatives and Sub-Contractors or from riots, strikes and civil commotion.
23.4 The hazards to be covered will pertain to all the works and areas where the Contractor, his Sub-Contractors, his
agents and his employees have to perform work pursuant to the Contract.
23.5 The above are only illustrative list of insurance covers normally required and it will be the responsibility of the
Contractors to maintain all necessary insurance coverage to the extent both in time and amount to take care of all
his liabilities either direct or indirect, in pursuance of the Contract.
24.0 UNFAVOURABLE WORKING CONDITIONS
Seal & Signature of Bidder
The Contractor shall confine all his field operations to those works, which can be performed without subjecting the
equipment and materials to adverse effects during inclement weather conditions, like monsoon, storms etc. and
during other unfavorable construction conditions. No field activities shall be performed by the Contractor under
conditions, which might adversely affect the quality and efficiency thereof, unless special precautions or measures
are taken by the Contractor in a proper and satisfactory manner in the performance of such Works and with the
concurrence of the Engineer. Such unfavorable construction conditions will in no way relieve the Contractor of his
responsibility to perform the Works as per the schedule.
25.0 PROTECTION OF MONUMENTS AND REFERENCE POINTS
The Contractor shall ensure that any finds such as relic, antiquity, coins, fossils, etc. which he may come across
during the course of performance of his Works either during excavation or elsewhere, are properly protected and
handed over to the Engineer. Similarly, the Contractor shall ensure that the bench marks, reference points, etc,
which are marked either with the help of Engineer or by the Engineer shall not be disturbed in any way during the
performance of his Works. If any work is to be performed which disturbs such reference the same shall be done
only after these are transferred to other suitable locations under the direction of the Engineer. The Contractor shall
provide all necessary materials and assistance for such relocation of reference points etc.
26.0 WORK & SAFETY REGULATIONS
26.1 The Contractor shall ensure proper safety of all the workmen, materials, plant and equipment belonging to him or
to GETCO or to others, working at the Site. The Contractor shall also be responsible for provision of all safety
notices and safety equipment required both by the relevant legislations and the Engineer, as he may deem
26.2 All equipment used in construction and erection by Contractor shall meet Indian/International Standards and where
such standards do not exist, the Contractor shall ensure these to be absolutely safe. All equipment shall be strictly
operated and maintained by the Contractor in accordance with manufacturer’s Operation Manual and safety
instructions and as per Guidelines/rules of GETCO in this regard.
26.3 Periodical examinations and all tests for all lifting/hoisting equipment & tackles shall be carried-out in accordance
with the relevant provisions of Factories Act 1948, Indian Electricity Act 1910 and associated Laws/Rules in force
from time to time. A register of such examinations and tests shall be properly maintained by the Contractor and
will be promptly produced as and when desired by the Engineer or by the person authorized by him.
26.4 The Contractor shall provide suitable safety equipment of prescribed standard to all employees and workmen
according to the need.
26.5 The Contractor shall provide safe working conditions to all workmen and employees at the Site including safe
means of access, railings, stairs, ladders, scaffoldings etc. The scaffoldings shall be erected under the control and
supervision of an experienced and competent person. For erection, good and standard quality of material only
shall be used by the Contractor.
26.6 The Contractor shall not interfere or disturb electric fuses, wiring and other electrical equipment belonging to the
Owner or other Contractors under any circumstances, whatsoever, unless expressly permitted in writing by GETCO
to handle such fuses, wiring or electrical equipment
26.7 Before the Contractor connects any electrical appliances to any plug or socket belonging to the other Contractor or
Owner, he shall:
a. Satisfy the Engineer that the appliance is in good working condition;
b. Inform the Engineer of the maximum current rating, voltage and phases of the appliances;
c. Obtain permission of the Engineer detailing the sockets to which the appliances may be connected.
26.8 The Engineer will not grant permission to connect until he is satisfied that;
a. The appliance is in good condition and is fitted with suitable plug;
b. The appliance is fitted with a suitable cable having two earth conductors, one of which shall be an earthed
metal sheath surrounding the cores.
26.9 No electric cable in use by the Contractor/Owner will be disturbed without prior permission. No weight of any
description will be imposed on any cable and no ladder or similar equipment will rest against or attached to it.
26.10 No repair work shall be carried out on any live equipment. The equipment must be declared safe by the Engineer
and a permit to work shall be issued by the Engineer before any repair work is carried out by the Contractor. While
working on electric lines/equipment, whether live or dead, suitable type and sufficient quantity of tools will have to
he provided by the Contractor to electricians/workmen/officers.
26.11 In case any accident occurs during the construction/ erection or other associated activities undertaken by the
Contractor thereby causing any minor or major or fatal injury to his employees due to any reason, whatsoever, it
shall be the responsibility of the Contractor to promptly inform the same to the Engineer in prescribed form and also
to all the authorities envisaged under the applicable laws.
26.12 The Engineer shall have the right at his sole discretion to stop the work, if in his opinion the work is being carried
out in such a way that it may cause accidents and endanger the safety of the persons and/or property, and/or
equipment. In such cases, the Contractor shall be informed in writing about the nature of hazards and possible
injury/accident and he shall comply to remove shortcomings promptly. The Contractor after stopping the specific
Seal & Signature of Bidder
work can, if felt necessary, appeal against the order of stoppage of work to the Engineer within 3 days of such
stoppage of work and decision of the Engineer in this respect shall be conclusive and binding on the Contractor.
26.13 The Contractor shall not be entitled for any damages/compensation for stoppage of work due to safety reasons as
provided in Para 31.18 above and the period of such stoppage of work will not be taken as an extension of time for
completion of work and will not be the ground for waiver of levy of liquidated damages.
26.14 It is mandatory for the Contractor to observe during the execution of the works, requirements of Safety Rules which
would generally include but not limited to following
a) Each employee shall be provided with initial indoctrination regarding safety by the Contractor, so as to enable
him to conduct his work in a safe manner.
b) No employee shall be given a new assignment of work unfamiliar to him without proper introduction as to the
hazards incident thereto, both to himself and his fellow employees.
c) Employees must not leave naked fires unattended. Smoking shall not be permitted around fire prone areas and
adequate fire-fighting equipment shall be provided at crucial location.
d) There shall be a suitable arrangement at every work site for rendering prompt and sufficient first aid to the injured.
e) Requirements of ventilation in underwater working to licensed and experienced divers, use of gum boots for
working in slushy or in inundated conditions are essential requirements to be fulfilled.
26.15 The Contractor shall follow and comply with all GETCO Safety Rules, relevant provisions of applicable laws
pertaining to the safety of workmen, employees, plant and equipment as may be prescribed from time to time
without any demur, protest or contest or reservations. In case of any discrepancy between statutory requirement
and GETCO Safety Rules referred above, the latter shall be binding on the Contractor unless the statutory
provisions are more stringent.
a. Fatal injury or accident Rs. 1, 00,000/- : These are applicable
Causing death per person for death
b. Major injuries or accident causing Rs. 20,000/- : injury to any person,
25% or more permanent disablement per person whosoever.
to Workmen or employees
Permanent disablement shall have same meaning as indicated in Workmen’s Compensation Act. The
compensation mentioned above shall be in addition to the compensation payable to the workmen/employees under
the relevant provisions of the Workmen’s Compensation Act and rules framed there under or any other applicable
laws as applicable from time to time. In case the Owner is made to pay such compensation then the Contractor is
liable to reimburse the Owner such amount in addition to the compensation indicated above.
27.0 CODE REQUIREMENTS
The erection requirements and procedures to be followed during the installation of the equipment shall be in
accordance with the relevant Codes and accepted good engineering practice, the Engineer’s drawings and other
applicable Indian recognized codes and laws and regulation of the Government of India.
Seal & Signature of Bidder
SPECIAL CONDITIONS OF CONTRACT
1.0 General Particulars :
This part of the Bid Document relates to certain specific/special terms and conditions particular to the Contract. The
provisions herein are to be read and understood in conjunction with the relevant provisions elsewhere in the
Instructions to Bidders (ITB), the General Conditions of Contract (GCC) and Erection Conditions of Contract (ECC).
The intent of provisions herein are specific to this contract and are, in general, supplementary to related provisions
under ITB,GCC and ECC. However, in certain provisions which are contrary to those in ITB, GCC and ECC, the
provisions in these Special Conditions of Contract will prevail.
2.0 Tender Fee/ Earnest Money Deposit (EMD) :
Bidders shall compulsorily pay tender fee and EMD through RTGS/NEFT only.
a) Payment of Tender fee / Earnest Money Deposit ( EMD ) can be accepted by RTGS/ NEFT.
3.0 For payment through RTGS/NEFT the scan copies of payment made (transaction slip of payment made) shall be
uploaded online with the Tender documents on n-procure portal.
4.0 Bidder has to provide following detail on the same date of payment made so that receipt can be generated at below
mentioned e-mail ids:
Sr. Required Details
1 Name & Postal Address of the bidder
2 Contact Detail & e-mail id of the bidder
3 Tender No. with due date
4 Mode of Payment made
5 Ref. ID with Bank Details(UTR number)
6 Amount Paid for Tender fee in Rs.
7 Amount Paid for EMD in Rs.
3. GETCO Beneficiary Bank Details are as under:
Sr.No. Particulars Requisite Details
1 Name of Bank BANK OF BARODA
2 Name of Branch MAKARPURA VILLAGE BRANCH, VADODARA
5 IFSC Code BARB0MAKARP
6 Name of GETCO , JAMBUVA
8 GST No. 24AABCG4029R2ZC
2.1 The bid security is required to protect the owner against the risk of Bidder’s conduct, which would warrant the
guarantee forfeiture, pursuant to relevant para elsewhere The bid guarantee shall be made payable to the Owner
without any condition whatsoever.
2.2 The Owner will reject any bid not secured in accordance with Para 18.1 above, as non-responsive. No exemptions
are made in the furnishing of the security.
2.3 Unsuccessful Bidder’s bid security/EMD will be returned/refunded on finalization of tender or three months from the
date of submission of tender.
2.4 The successful bidders, Bid Security will be discharged upon, furnishing the contract Performance guarantee
2.5 The bid guarantee may be forfeited.
a) If a Bidder withdraws its bid during the period of bid validity specified by the bidder on the bid Form:
b) If a bidder refuses to accept the contract or fails to commence the works (including supplies within thirty days of
letter of award of contract)
2.6 Bidders are requested to pay an earnest money deposit by RTGS/NEFT. Banker’s cheque / demand draft
shall not be accepted.
2.7 Tenders no accompanied by EMD shall be rejected.
2.8 If during the tender validity period, i.e. 180 days, the tenderer withdraws his tender, the EMD shall be forfeited
and the tenderer may be disqualified from tendering for future works of GETCO.
Seal & Signature of Bidder
5.0 2.9 The EMD will be returned promptly to the unsuccessful tenderer. The EMD will be returned to the
successful tenderer after he furnishes the Security Deposit for performance and duly enters into the contract.
If he fails to furnish the SD or to execute the contract for the work offered to him, his EMD shall be forfeited
and the tenderer may be disqualified from tendering for further works for GETCO.
3.0 Validity period: The offers should be valid for minimum period of 180 Days from date of opening of tender
(Technical Bid).
4.0 Declaration by Bidder:
The Bidder shall sign the Declaration enclosed to this SCC and not furnishing the same will make the Bid invalid.
5.0 Qualifying Criteria:
5.1 TECHNICAL CRITERIA:
As mentioned in Qualifying Requirement
5.2 FINANCIAL CRITERIA:
As mentioned in Qualifying Requirement
Scope of work to be included:
“The work includes transportation of any materials with its relevant accessories from any store center of
GETCO to project site/ any store of GETCO including loading, transportation, unloading and stacking of
materials as per instruction of EIC. No charge will be given for empty trip.”
6.0 Additional Documents:
Apart from various documents to be furnished along with the Bid as required in the GCC and ECC, the following
documents/details are to be furnished by the Bidder:
1. GST Registration No. date
2. Details of Partners/Directors of the Firm/Company.
3. Experience Record and details of orders pending / executed for GETCO
4. PF registration along with proof of challan etc.
5. Solvency certificate from Bank (up to 20 % of Bid value).
7.0 Price Inclusions (including Taxes & Duties) :
7.1 The prices quoted shall be all inclusive of transportation accessories from any store center of GETCO to project
site/ any store of GETCO including loading, transportation, unloading and stacking of materials as per
instruction of EIC after observing all store formalities of GETCO.
7.2 No extra payment toward any tools tackle will be made
Contractor has to submit the GST Registration certificate.
(ii) Contractor should be registered under GST laws
(iii) Any change in Tax applicability on this service will also apply to this tender.
(iv) GST on said service will be applicable at 12% charged by the agency on bills.The Agency has to submit
declaration for the Input Tax Credit if claimed at the time of submission of 1st RA bill otherwise GST 5% will
be paid under RCM by GETCO
( v ) The Contractor has to submit invoice to GETCO indicating following.
Name, address and GST registration no. of the service provider
Name and address of person receiving the service i.e. GETCO
Description and value of service provided
Contractor has to also supply tax invoice as described under GST rules and Regulation indicating GSTIN No
7.4 WELFARE CESS:-
1. As per the Welfare Cess Act, the welfare cess @ 1% is applicable on supply and erection items for supply,
erection, testing & commissioning of substation, transmission lines, EPC/Turnkey projects, and civil works.
2. Contractor shall get registered under Welfare Cess Act before commencement of work in required head as per
nature of work. Office of the Factory Inspector is authorized at present as a registering authority.
3. GETCO shall pay the welfare cess by way of reimbursing to contractors on production of documentary evidence
of payment. Registration charges will not be reimbursed.
4. The contracts for which supply or part supply of material are in the scope of GETCO, then contractors shall
deposit welfare cess on estimated cost of supplied items to GETCO on progressive basis of utilization. As this
part of welfare cess is on GETCO account, the same shall be reimbursed to the contractor on receipt of request
letter along with documentary evidence of payment. For calculation of welfare cess on supply part, valuation
as per MR shall be taken and informed to the contractor for payment. This will be over and above the A/T value.
The modality of payment/ reimbursement of welfare cess will be as under.
5. On receipt of A/T, the contractor / bidder will get them registered under Welfare Cess Act and submit the
documentary evidence to the concern office. Copy of Registration certificate shall be submitted before
submission of 1st RA bill
Seal & Signature of Bidder
6. Before release of payment of first R.A.Bill, the contractor has to submit the documentary evidence of
registration. Only thereafter, the bill will be processed for payment.
7. Before release of payment of subsequent R.A.Bills, the contractor has to submit the documentary evidence of
payment of welfare cess of previous R.A.Bill.
8. The welfare cess shall be reimbursed to the contractor on submission of copy of documentary evidence of
payment by observing due formalities.
7.5 GST & welfare tax shall be reimbursed on production of proof of such payments made by the contractor to
the appropriate department as per GETCO & Govt’s rules.
7.6 The contractor will have to give indemnity bond on Non-judicial Stamp paper of value Rs. 300/-to GETCO
for material as per attached format.The cost of stamp paper will be born by the contractor.
7.7 Also the successful bidder will have to execute Agreement on stamp paper of value Rs.300/- at our Circle
office Jambuva before commencement of works as per GETCO’s prescribed Performa.The cost of stamp
paper will be born by the contractor.
7.8 The contractor will have to give safety cum indemnity on Non-judicial Stamp paper of value Rs. 300/- to
GETCO against any possible claim of compensation for damage to contractor’s staff or any of third party
during the execution of work. The cost of stamp paper will be born by the contractor.
7.9 Statutory Variations:
Any statutory increase or decrease in the taxes and duties subsequent to your offer if it takes place within the
original contractual delivery date will be to the GETCO’s account subject to the claim being supported by
documentary evidence.However, if any decrease takes place after the contractual delivery date, the advantage will
have to be passed on to the GETCO.
7.10 Income Tax
Income tax at source at the prevailing rate will be deducted from each and every bills in accordance with the
provision of Income-Tax laws and to that effect a certificate will be issued to the contractor.
8.0 SECURITY DEPOSIT CUM PERFORMANCE GUARANTEE DEPOSIT :-
The successful bidder has to pay 100 % security deposit (5% of the Contract) upon placement of LOI within
days.The successful bidder will be required to pay an amount equivalent to 5 % of the value of the order as a
Security Deposit for satisfactory execution of the contract. Such Security Deposit will be payable either in BG/DD
payable at Vadodara. Bank guarantees from Scheduled / Nationalized Banks will be acceptable.
SD will be refundable after completion of Guarantee period of 06 Months from Date of completion of work
8.1 The Bank Guarantees furnished / submitted should have clear one time validity till the completion of the order in all
respect and up to the expiry of the Guarantee period of Six months from the date of completion of work. Bank
Guarantee for interim period will not be allowed. If by any reason the contract period is extended, then contractor
should undertake to renew the Bank Guarantee at least one month before the expiry of the validity failing which
Corporation will be at liberty to en-cash the same, without entering into further correspondence formalities, etc in
8.2 No interest will be allowed on amount of Security deposit.The Security Deposit cum performance Guarantee deposit
of 5% on total contract value shall be valid up 6 months from the completion of work.
8.3 This security deposit is for the performance of contract and the same is liable to be forfeited by the Corporation
in event of non-fulfillment of the term and conditions of this contract by the contractor. (CORPORATE BANK
GUARANTEES NOT ALLOWED)
9.0 Completion Period:
Overall Completion period for this Contract will be 24 Months from the date of commencement issued by Circle
office Jambuva .
No mobilization period, idling or stoppage period will be allowed during this period of the Contract.
Contractor shall have to arrange necessary man power / tools tackles / vehicles for execution of subjected work
within 12 hours from the date of receipt of instructions or intimation through e -mail / telephone from concerned
division office / circle office. Copy of Gate pass shall be by EIC to Division office for initialization of process for
issuance of sub order by Division office.
There might be possibility of more than one incident / emergency arise at same point of time like in cyclone,
moonsoon season etc.In that case, successful contractor shall have to take prompt action to collect material from
various stores and deliver the same to site/ stores as per instruction of EIC by arranging gang /man power /tools
tackels/ vehicles of required capacity.
If required, the Bi-annual rate contract may be extended for the period of further 12 Month with mutual
understanding at the same rate and terms and condition. Also, if amount remains pending in Bi-annual rate contract
extension may be given up to completion of amount with mutual understanding.
Seal & Signature of Bidder
The time limit for the work may be reduced and contractor should make all his efforts to complete the work within
stipulated time limit as may be given by the Engineer in charge depending upon emergency of work, GETCO
reserves the right to reduce the time limit without giving any notice.
The completion date will be deemed to be the date on which all works on the Contract are demonstrated to be
complete to the satisfaction of the GETCO/Engineer and is complete in all respects as per the terms and conditions
of this Contract.
10.0 GUARANTEE PERIOD:
Total material supplied and work executed shall be covered under guarantee period against any defect in materials,
poor workmanship or defect/ wrong design etc. for a period of 6 Months from the date of completion of work.
11.0 PENALTY FOR DELAY:
11.1 The tenderer should note that the completion time allowed for carrying out the work should be strictly observed.
Any delay that may take place in work execution beyond Contractual cutoff date stated as per stipulated delivery
period shall be subject to the penalty at the rate of ½ % of the delayed work value plus applicable taxes (if any) per
week or part thereof, with a ceiling of 10 % of the total contract value plus applicable taxes (if any).
11.2 In event of failure of the Contractor to pay the amount of Penalty as demanded, the Owner shall be entitled to
deduct the amount of Penalty for delay from the amounts payable to the Contractors under any bills raised under
this contract or any other contract with the GUVNL and its Subsidiary Companies i.e. GETCO, GUVNL, GSECL,
MGVCL, DGVCL, PGVCL UGVCL. It is permissible for the Owner to adjust the amount of Penalty of delay against
any Bank Guarantee furnished by the Contractor under this contract or any other contract with GUVNL and/or its
subsidiary companies.
11.3 The penalty will be deducted from bills payable either against this contract or from any Bank Guarantee or any
other amount payable under any other contract with the GETCO.
12.0 Billing and Payment Terms
(a) Each Sub-Order shall be treated as First and Final Bill. Sub –order will be issued by Concern AM Division
(b) For each Sub-Order, all statutory liability shall be full fill as per GOG/GETCO’s Rules and Regulations.
(c) The material account shall be finalized for each Sub-Order, and not to carry out up to Final Bill. Also, the
liability towards CWWC shall be treated Separate for each Sub-Order and all terms and Conditions shall
be applicable as per prevailing practice and guideline of Competent authority. Hence, being a Sub-order
is First as Final for Billing the liability towards CWWC is to be full fill before release payment for Sub-
(d) If net payable amount is more than Rs 10.00 Lacs, payment will be released from circle office/corporate
office. The payment will be made by RTGS/NIFT only
(e) The payment will be released within 60 days. However, in case of any delay due to any eventuality no any
interest charges shall be paid. The payment shall be made by concern AM division through RTGS/NIFT
(f) All the bills in accordance with the above clauses must be submitted with the following information:
Transportation / work done for each trip
Item wise work done
Gate pass copy
Weigh slip for each trip i.e. material transported
Certificate of concern EE AM / S/S incharge stating work carried out in terms of transportation / loading
/ unloading / staking work carried out by agency, distance travelled, material qty (weight ) and necessary
Vehicle documents for hired / owned vehicle for each trip
(g) For non-submission or part submission of above information, an additional 5% amount of the respective
RA bill shall be withheld and shall only be released at the time of final bill.
(h) The R.A. Bill shall be submitted to concern Executive Engineer ( AM)
13.0 Terms of Payment
The payment for work done shall be made as under only after execution of the contract documents/furnishing of
Security Deposit and on execution of work.
14.0 TAKING DELIVERY AND INSURANCE:
14.1 The contractor has to take delivery of S/S equipment and materials from any R & M store/ construction store of
GETCO and keep in safe custody and transport to the respective sites / any R & M store/ construction store of
GETCO and will be fully responsible for any damage to or loss of all materials at any stage during transportation
or taking over of the S/S incharge.
14.2 The contractor shall have to arrange necessary tools tackles for subjected work.
Seal & Signature of Bidder
14.3 The goods carriage shall be properly secured within the body of the vehicle to prevent it falling from the vehicle.
Vehicle is to be so covered & secured having sufficient capacity to carry material so that there shall not be any
danger, injury to the employee of GETCO/ property of GETCO or any public or to the property of the public / any
14.4 It will be the responsibility of the contractor to ensure tools, tackles, torch and First-Aid Kit to be made available in
14.4 STORAGE-CUM-INSURANCE : -
The contractor shall take suitable storage cum erection insurance cover at his cost for the entire work for Rs.
lakh, which are required to complete the work. Contractor shall have to take comprehensive insurance policy
against any loss, damage, theft, pilferage, fire etc. for the complete order period during loading, unloading and
staking activity at store. The contractor shall deal directly and pursue the claim with the Insurance Company and
shall be responsible in regard to maintenance of all insurance coverage as well as for settlement of claim. The proof
of insurance policy taken by the successful contractor shall be furnished to SE (TR), JAMBUVA. In absence of the
above insurance policy, R.A. Bill payment will be withheld. No material shall be issued to bidder/erection agency in
absence of such insurance policy.
14.5 In the event of any damage, theft, loss, pilferage, fire etc., you shall be responsible to lodge, pursue and settle all
the claims with the Insurance Company for all items, materials and the Corporation shall be kept informed about it.
You shall replace the lost / damaged materials / items promptly irrespective of the settlement of the claims by under
writer and ensure that the work progress is as per agreed schedule. The loss, if any, such replacement will have to
be borne by you and Corporation will not entertain any claim / representation in this regard. However, it will be
contractor's responsibility to insure entire project till the line is taken over by the Corporation.
Successful bidder shall have to take insurance as mentioned below :
Successful bidder has to take insurance amounting Rs.50.00Lakh having validity of 02 years i.e. entire contract
period immediately on receipt of the work order.
During Bi-annaul ARC duration, is any untoward incident took place and contractor is forced to claim the insurance
then GETCO will review the balance insurance cost. In such case, successful bidder will be bound to take additional
insurance policy for the balance period i.e. up to due date of completion of work
If time limit extension beyond the contract period is required on mutual agreement between GETCO & successful
bidder , in that case require insurance policy shall be taken by successful bidder for extension period.
GENERAL CONDITION FOR “BI-ANNUAL CONTRACT FOR WORK OF TAKING DELIVERY, LOADING, UNLOADING,
STACKING INCLUDING TRANSPORTATION OF ANY MATERIAL FROM ANY STORE OF GETCO TO ANY SUB-
STATION / STORE OF GETCO
1. The work should be carried out according to the specification and as per instructions of concern EE AM and
programmed laid out by the DE TECH , CO , JAMBUVA .
2. The Engineer in charge of respective AM divisions / DE Tech Division office has to contact DE Tech circle office
Jambuva for arranging trip / program for vehicle in advance.
3. The tenders shall remain open for acceptance at least for a period of Six Months, from the date of opening of
4. The Gujarat Energy Transmission Corporation Limited reserves the right to reject any or all tender without signing
any reasons whatsoever.
5. The contractor shall engage Supervisor with sufficient qualification and experience who could supervise the work.
6. The work shall be commenced immediately from the date of receipt of instructions from office and should be
completed within thereafter.
7. As regard damage the materials, equipment and worker of the contractor, he himself will be responsible. If there
is any compensation to be paid in respect of “WORKMAN” compensation act of any other statutory provisions, the
same will have to be paid by the contractor direct. If he thinks fit he may take necessary insurance cover, at his
8. Security deposit: - The contractor will have to pay the Security Deposit at 5% of the order value in form of demand
draft/BG in favor of ‘GUJARAT ENERGY TRANSMISSION CORPORATION LTD’ within 10 days from the date of
the issue of LOI.
9. The time allowed for completion the work is 24 months from the date of the commencement of the work.The
tenderer should note that the completion time allowed for carrying out the work should be strictly observed. Any
delay that may take place in work execution beyond Contractual cutoff date stated as per stipulated delivery period
shall be subject to the penalty at the rate of ½ % of the delayed work value plus applicable taxes (if any) per week
or part thereof, with a ceiling of 10 % of the total contract value plus applicable taxes (if any).
In event of failure of the Contractor to pay the amount of Penalty as demanded, the Owner shall be entitled to
deduct the amount of Penalty for delay from the amounts payable to the Contractors under any bills raised under
this contract or any other contract with the GUVNL and its Subsidiary Companies i.e. GETCO, GUVNL, GSECL,
MGVCL, DGVCL, PGVCL UGVCL. It is permissible for the Owner to adjust the amount of Penalty of delay against
Seal & Signature of Bidder
any Bank Guarantee furnished by the Contractor under this contract or any other contract with GUVNL and/or its
subsidiary companies.
The penalty will be deducted from bills payable either against this contract or from any Bank Guarantee or any other
amount payable under any other contract with the GETCO.
10. No higher rate of revised rate will be applicable for the work, if work is held up/ closed due to whatever so reasons.
11. In case of any dispute/ doubt, the decision of Superintending Engineer (TR), GETCO, Jambuva shall be
unchallengeable, final and binding to the contractor.
12. The quantum of the work as mention in estimate/ schedule –‘B’ is tentative and it can be very differ as per site
condition. The payment shall be made only on actual work executed or order quantity, whichever is less.
13. The tenderer will be abiding by and fulfill all the terms and provisions of the “Tender & Contract” for works as
applicable and incase of any discrepancy found GETCO shall forfeit the S.D. or any other action as may be initiated
as decided by Superintending Engineer (TR), GETCO, Jambuva.
14. The time limit for the work may be reduced and contractor should make all his efforts to complete the work within
stipulated time limit as may be given by the Engineer in charge depending upon emergency of work, GETCO
reserves the right to reduce the time limit without giving any notice.
15. The contractor has to remain in contact with Engineer in charge of work who shall issue detailed instruction for
the commencement of the work and DE Tech Jambuva, Circle office who will issue the program for subjected
16. All other general terms and conditions as prevailing in the GETCO shall be applicable to the contract.
17. The cost of damages to the material , if any will be recovered from the Contractor’s bill. The assessment of which
will be done by field Engineer at his sole discretion and his decision shall be binding to the contractor and shall be
considered as final and unchallengeable.
18. The contractor will have to give indemnity bond to GETCO against any possible claim of compensation for damage
to contractor’s equipments or staff or any of third parties during the execution of work.
19. The contractor will have to complete entire job as per directive and instruction of Engineer in charge. If he fails to
do so entire work will be carried out at contractor’s risk and cost.
20. The tender shall be issued to only the experience and contractor who has completed such job of similar nature and
magnitude satisfactorily in time. However, issuance of blank tender, will does not qualifies the tenderer to offer the
21. The contractor shall not refuse to execute the work order at any time and it will be his sole responsibility to execute
and complete this work as per the instruction of Engineer in charge.
22. The contractor has to carry out all the works in accordance with revised and latest provision under I.E. Rules Act
made there under and as per instruction of Engineer in charge.
23. No subcontractor, Power of Attorney shall be allowed.
24. The undersign reserve rights to reject any or all the tenders without assigning any reasons thereof.
25. The contractor has to follow all labour laws, safety rules and regulations. The GETCO does not take any
responsibility in case of accident or injury to the workers. The safety/ security of men, materials and equipments
shall be sole responsibility of the contractor.
26. The bidder shall specifically note that GETCO will not pay any extra amount towards any type of claim except for
the description indicated in Schedule – ‘B’. The party has to carry out all other/ additional required activities/ works
as directed by Engineer in charge which is not mentioned in Schedule but required to be completed as per site
condition and for this work no extra payment shall be made by GETCO.
27. The competent authority can delete any item in schedule of the tender, if he feels that the rate quoted by the
contractor for that item is abnormally high when compared to the estimated rates.
28. The work shall be carried out according to the specification and as per instructions and programmed laid out by the
Superintending Engineer-in-charge of the work.
29. Contractor will abide by and fulfill all the terms and conditions and general terms and condition of the contract for
works available in the office.
30. Tender offer without payment of EMD, documents, list of tools, tackles, equipments etc. required for execution of
job will be out rightly rejected without assigning any reason thereof and decision of Superintending Engineer (TR),
Jambuva will be final and unchallengeable.
31. GETCO shall deduct the Income-Tax and other taxes as per prevailing rules from each and every bill.
32. No part rate or reduced rate shall be allowed in final bill.
33. Successful bidder should abide to follow of all Central/ State Govt. rules, safety and insurance rules , RTO rules
34. The Gujarat Energy Transmission Corporation Limited does not bind itself to accept the lowest or any tender.
GETCO reserves the right to reject any or all tender without signing any reasons whatsoever.
35. The tender includes all minor accessories and items of work which are not have been specifically mentioned in the
specification schedule etc. but are essential for completion of work. The contractor will not be eligible for any extra
payment in respect of such minor accessories and items of work.
36. Bidder will be qualified only who have submitted all the required documents as mentioned in tender notice.
37. GETCO will not pay any idle charge for any site conditions or any circumstances.
38. The tender shall be issued to only the experienced contractor who has completed such job of similar nature and
magnitude satisfactorily in time. However, filling of on line tender, does not qualifies the tenderer to offer the bid.
Seal & Signature of Bidder
39. The Contractor will be governed by The GETCO’s general conditions of works contract. The Booklet will be
available in the concerned office in any working days. In the event of placing order, the contractor will have to sign
this booklet along with other document and agreement. All the usual terms and conditions of the GETCO, through
the same might have not been mentioned in this specification or contractor booklet will applicable to this contract,
and the decision of the Superintending Engineer shall be binding on the contractor.
40. Specification in any items mentioned in tender are subject to change without any prior notice and binding to the
41. For shortages of any materials issued by the GETCO for the work, recovery shall be made from you, on the basis
of prices of the materials (prevailing on the date of settlement of materials account) plus 15% supervision charges
plus GST as applicable.
42. No tools, tackles, manpower, crane facilities etc. will be provided by the GETCO.
SPECIAL TERMS AND CONDITIONS:
1. Scope of Work : The work includes transportation of any materials with it’s relevant accessories from any store center
of GETCO to project site/ any store of GETCO including loading, transportation, unloading and stacking of materials
as per instruction of EIC. No charge will be given for empty trip.
2. The contractor shall undertake loading, unloading, and transportation ,stacking of materials as per specifications,
quantities, and destinations as per program given by concern EIC or DE Tech Circle Office-Jambuva. This includes:
Contractor shall deploy adequate number of vehicles and manpower, tools, and tackles on as and when required
basis as per the programme allotted to him
Contractor shall have to carry out safe loading, handling, shifting, transporting , unloading, stacking of materials
without damage to materials
Contractor shall have to execute the work within stipulated timelines and instructions of the Engineer-in-Charge
Contractor shall have to Provide trained manpower and maintain discipline
Contractor should ensure vehicles which are engaged for subjected work are in good condition and comply with
Vehicles engaged must comply with RTO rules and environmental norms
All safety regulations and site instructions, norms for material loading unloading handling stacking shall be
compulsorily followed by contractor
In case of any breakdown of vehicle took place , replacement must be provided immediately. Standby vehicles
must be available at all times.
3. Contractor shall have to utilize Vehicles having adequate capacity for handling /shifting / transportation of the
materials/equipment’s/ consignment which must comply with RTO rules and environmental norms.
4. Contractor must have all vehicle documents for hired / owned vehicle viz. R.C. book, insurance and all RTO documents
and make them available while trip and same shall be produced along with RA bill to respective EIC.
5. Vehicles must have:
Valid RC, insurance, pollution certificate (PUC), fitness certificate
Permit for inter-state movement (if applicable)
Non-compliant vehicles shall not be allowed
6. Prior intimation in writing for starting the job will be given by the Company. The road route decided for transportation if
changed due to any reasons, no any additional payment will be made.
7. Contractor will be fully & solely responsible for any shortage, damage, leakage to equipments, it’s accessories that
may occur, during dragging, loading, transportation and unloading up to the destination. The cost of damage, shortages
breakages will be recovered from the contractor’s bill. The Assessment of which will be done by Filed Engineer at his
sole discretion and his decision shall be binding to the contractor and shall be considered as final and un-challengeable.
8. Contractor shall have to submit RA bill along with work completion certificate issued by EIC, gate pass , weigh slip to
concern EE( AM).
9. The company will not be responsible for any accident injuries etc. to the contractor’s labour or any disability to those
persons during execution of whole job. Any damage to the contractor’s equipments during executions work will be
liability of the contractor.
10. Contractor shall have to give indemnity bond to GETCO against any possible claim of compensation for damage to
contractor’s equipments or staff or any other third party during the execution of work and whole job. If by any reasons,
Company is called upon the pay any such claim or compensation, the same will be recovered from the contractor’s bill
any where pending with GETCO even any later date.
11. For starting above work the transportation contractor will be informed in advance, so as to keep ready skilled labours,
Trailer, Tools, Tackles and other required materials. The company will not be in any case responsible for any delay in
dragging loading/ unloading and transporting up to destination. No extra charges for any short of delay will be paid to
the contractor. All extra charges incurred will have to be borne by the contractor. In any case Company will have to
execute the job, it will be solely done at contractor’s risk and cost, and all penalty above extra additional expenditure
as per Company’s rules will be levied upon and all pending bills deposits etc will be forfeited reserving the right of the
Company recover balance dues by ways to deemed fit.
12. No crane nor any facilities will be provided by GETCO at loading place, contractor shall have to arrange all necessary
tools / equipment for completion of the job.
Seal & Signature of Bidder
13. Contractor shall have to complete entire job as per directions, if he fails, to do so, entire work will be carried out at
contractor’s risk and cost. Due intimation for the starting the job will be given by Company.
14. Contractor shall have to engage labours for keeping live electric wires away from the equipments ,for tree cutting, if
required and for removing other obstacles during transit. Necessary guidance, permission from any Government
Authority, Railway Authorities, RTO and PWD Department etc will be arranged by Contractor well in time at his own
15. Wherever required , arrangement of smooth road at diversion shall have to be arranged by the contractor.
16. Contractor will be solely and fully responsible to any accident damage either to private or public properties and human
being during the time of execution of job.
17. In case of trailer truck to be provided, the contractor will have to arrange for all permits, such as road permit from RTO,
PWD or other authorities of Gujarat State for movement of his trailer/ truck etc. Contractor has to comply all updated
RTO safety rules, Railway Laws, R&B Deptt. Laws etc and has bear all such clearing permission/ insurance and all
other incidental charges required thereof.
18. Wherever necessary, reinforcement to the small bridges of culverts coming on way, whole transportation should have
to be arranged by the contractor at his cost.
19. The carting contractor shall be fully responsible for safe loading, unloading and transportation of the consignment. In
case of any damage to the consignment, the contractor shall be responsible for making good, the loss sustained, in
terms and replacement, repairs etc as may be required by the Company for putting the consignment in right order of
20. The contractor shall ensure that representative on his behalf is deputed by him to keep in touch with the Engineer with
regard to detailing of work
21. Any other items, activities which is not included in the schedule but required for transportation works should be carried
out by the contractor without any extra charges.
22. If the contractor fails to arrange sufficient capacity of trailer/ vehicle in time & due to this, any revenue loss occurs, the
same shall have to be borne by the contractor.
23. The Bi-Annual rate contract mentioned in the schedule “B” of the tender will be valid up to 02 years or the order amount
whichever is earlier.
24. The successful contractor has to furnish name, address and telephone number of local representative in their offer.
25. The authorized/ responsible representative must have to travel with the truck till the safe delivery of the materials. In
no case the loaded truck should be left idle by him and it will be your sole responsibility for any shortage/ damage to
the material during execution of the order.
26. The materials to be loaded must be weighted on weigh-bridge at source and destination locations in presence of our
authorized representatives/ engineer-in-charge and payment will be made only against actual weight transported with
the shortest route. The weighting charges are to be borne by the contractor.
27. The contractor has to fully co-operate the employees of the GETCO during execution of the work order at either of the
destination places without any excuse. Difficulty of any nature must be brought to the notice of the engineer-in-charge.
28. The contractor has to load/ unload/ stack the material only as per direction of the authorized Representative of the
GETCO or engineer-in-charge.
29. The contractor has to maintain the rules and regulation of the respective store for loading/ unloading of the materials.
30. The quantity and distance mentioned in the Schedule “B” is tentative and payment will be made strictly on the actual
basis i.e. actual weight transported with the shortest distance as certified by the engineer-in-charge.
31. The tenderer has to give local address (Vadodara) along with the name of local representative and phone number, so
as to commence the work immediately within 12 hours. The offer received without local address and contact telephone
number shall be rejected out-rightly without assigning any reason thereof.
32. Any dispute arising out of these tender documents will be subject to Vadodara jurisdiction.
33. Contractor has to provide required vehicles at a time as per the instruction of EIC.
34. During the journey all the RTO rules and regulations should be followed scrupulously and contractor will be responsible
35. Vehicle provided shall be comprehensively insured. Insurance for driver shall be arranged by the contractor
36. The driver should be fully instructed for the good behavior and to drive the vehicle only in accordance to the clear
directives of Officer-in-charge. In case, if driving is found rough, contractor shall have to change the driver with genuine
37. The contractor shall immunize company’s personnel against any claim arising out of accidents or misbehavior of the
drivers. The vehicle shall be properly insured all the time to cover the comprehensive party risk and simultaneously
immunized company on account of likely claims from public, police deptt. etc.
38. No any tools & tackles will be provided by the GETCO.
39. Loading/Unloading Standards
Materials must be handled using proper techniques to avoid damage and as per guideline of OEM and instruction
of site incharge.
Use of mechanical equipment (cranes, forklifts, etc.) wherever required is mandatory
Manual handling must comply with safety norms
40. Material Safety & Protection
Contractor must ensure proper covering (tarpaulin, etc.) during transit
Protection against rain, dust, or spillage is mandatory
Any damage or shortage shall be recovered from the contractor
Seal & Signature of Bidder
41. The contractor will be fully responsible for any shortage, breakage of damages to the materials/equipment that may
occur during the time of transportation, it is to be properly transported and handed over to the GETCO after completion
of the job. The cost of any such shortages/ breakages or damages if any will be recovered from the contractor, the
assessment of which will be done by our field officer at his sole discretion and his decision will be binding on the
42. Insurance: Contractor shall insure Vehicles ,Workers ,Materials in transit / complete work at his own cost
43. Proof of valid insurance must be submitted to EIC before commencement of work
44. The contractor shall be responsible for any accident , incident or damage to privilege, public properties etc. while
execution of work i.e. loading , unloading, transportation, stacking of material
45. The GETCO will not be responsible for any accident, injury etc. to the contractor’s laborer or equipments, during the
execution of the job, it will be the sole responsibility of the contractor.
46. Safety & Compliance
Contractor must comply with all applicable labor laws, safety rules, and regulations
Provision of PPE (Personal Protective Equipment) to workers is mandatory
Any accident or injury shall be the sole responsibility of the contractor
47. The successful bidder will have to give indemnity the GETCO against any possible claim of compensation for damage
to his equipment or for injury to him, or fatal/non-fatal Accident to human life, his staff or any other person during
execution of the above job. If for any reasons the GETCO is called upon to pay such claim or compensation the same
will be recovered from him or his bills.
48. The contractor or his authorized person should always be present at the time of transportation of materials/equipments.
49. If, at any stage the contractor fails to carry out the job, the work will be get done at his risk and cost without giving any
notice or formalities required as per rules as the time is the essence of the contract. Contractor will not be entertained
for any dispute in this regard.
50. The contractor will have to make his own arrangements for PWD road permit, R.T.O. permission or any other permission
from local or other authorities or Gujarat State Government or other state Govt. which may be required for movement
of vehicle in Gujarat State for the transportation of the heavy material. If necessary the GETCO will extend all possible
assistance to the contractor by way of writing recommendation, letters for issue of such permission to the various
authorities if required etc. but without any commitment and without prejudice to the other terms and conditions of this
tender. The transportation inside Railway premises, P.W.D. or Local Authorities Roads shall have to be carried out in
such a manner and during the period (nights or day) they permit.
51. The toll taxes to be paid during transportation shall be borne by contractor. GETCO will not pay any Toll tax / RTO
charges/ penalties if any while transportation
52. It is the whole and sole responsibility of the contractor to pay compensation or damages to the persons, involved during
accident as per prevailing laws.
53. Vehicle provided shall be comprehensively insured. Attested copy of insurance policy shall be submitted to the EIC.
Insurance for driver shall also be arranged by the contractor.Copy of the insurance and all vehicle documents shall be
submitted along with RA bill to EIC / concern division office.
54. The successful bidder shall have to provide full details of supervisor / drivers such as Name /Mobile No/ etc to the EIC
before starting the work
55. Vehicle with well experienced driver ( having valid license according to vehicle ) with necessary tools and tackles to
meet the normal breakdown while on road , torch and First-Aid Kit shall be provided by the contractor
56. The supervisor / driver should be provided with enough money to cover the cost of petrol/ diesel, repairs and incidental
expenditure while in journey. Supervisor / driver shall be provided with mobile phone facility for communication. Driver
should keep all documents relating to vehicle such as RC book copy, insurance, road permit, PUC certificate, valid
license etc. or any other important documents in original copy with vehicle
57. The contractor shall follow all rules and regulations pertaining to the vehicle and its running/working such as RTO,
traffic, etc. scrupulously. Any consequences arising due to non-observance of any such rules shall be borne by the
58. In case of accident to the vehicle, the driver or occupants of the vehicle at the time of the accident, the whole and sole
responsibility of the contractor during accident to pay compensation or damages to the persons, involved as per law or
Act and the GETCO will not be responsible for any claim on this account.
59. The Contractor shall make his own arrangement for the boarding and lodging of his supervisor, workers,driver
The contractor shall also make his own arrangements for refueling, repairs and maintenance of vehicle, operational
costs.No reimbursement in this regards shall be made under any circumstances
60. The contractor must follow all the rules, regulations and implementation of the labour laws relating to engagements of
persons by him.
61. The speedometers of the vehicles must be maintained with full accuracy and in working condition/order at all times.
Any defect noticed therein must be rectified at the earliest.Till such time, the meter starts working; the KMs. of journeys
for various places shall be decided by the users/Engineers based on the road maps or the basis of previous journey.
62. Vehicle shall be equipped with fire extinguisher
63. The rates quoted by the bidder in the schedule of rates must include all charges of every type such as fuel, taxes, and
levies maintenance / repairs of vehicle, driver or contractor’s supervisor, loading , unloading transportation of material
64. Contractor shall obtain necessary permissions for:
Entry of heavy vehicles
Seal & Signature of Bidder
Movement restrictions
GETCO shall not be responsible for such approvals
65. Route & Transit Responsibility
Contractor shall follow approved routes
All transit risks including theft, pilferage, or diversion shall be borne by contractor
66. Contractor must be ready to handle urgent/emergency work at short notice
67. Workers / labours engaged for subjected work must be medically fit and properly trained
68. Spillage, leakage, or pollution during transport must be avoided.Contractor shall be liable for any environmental
damage or penalty imposed by authorities
69. Entry/Exit & Site Discipline :
Workers and vehicles must follow gate entry procedures
Strict discipline and proper behavior must be maintained while working within premises
70. Weighment & Measurement: Measurement of transported material shall be based on:
Weighbridge records / volumetric assessment as approved
Department’s measurement shall be final and binding to the contractor
71. The bidder should quote his rate correctly taking into consideration all points mentioned in the Schedule ‘B’ attached.
The rates should be quoted without any conditions and should be quoted in ink both in words and figures in legible
72. The bill have to be submitted in triplicate to the respective EIC with one copy to concern EE (AM ).Payment will be
made on actual measurement after observing GETCO`s general procedure and GETCO`s rule. The Quantum of work
shown in schedule `B` is provisional.
73. The successful bidder will be governed by the ‘General Terms & Conditions’ of the GETCO and the ‘Tender and
Contract for Works’ booklet of the GETCO which can be issued from this office.
74. The successful bidder will have to enter into agreement with the GETCO on a stamp paper of appropriate value at his
75. The successful bidder will have to take insurance for his equipment, compensation for his labor and third party risk etc.
During transportation of materials/equipment.
76. The GETCO reserves the right to reject any or all tenders without assigning any reasons thereof.
77. The tenderer shall have to complete the job immediately on receipt of the intimation from concerned Engineer and the
same will be given for necessary arrangement in advance. Contractor has to mobilize their gang within 12 hrs.
78. The period of order is 24 Months and if required it will be extended for another 12 months. The transportation of
materials/equipments will have to be carried out mostly under the live line in the sub-station yard for that skill superior
is to be engaged to avoid any electrical accident. GETCO is not responsible for any electrical accident.
79. Monthly statement for execution of work should have to be submitted to SE Jambuva showing detailed work carried
out for monitoring of order quantity/value.
80. No payment will be made for empty trailer.
81. Based on the Hon’ble Supreme Court judgment dt. 9.11.2005 directing all the State Governments to ensure that
the motor vehicles carry only the specified weight and if any excess weight is carried, the same should be off
loaded.In view of above directions, it is mandatory that the transporter should provide trailer having
appropriate registered laden weight as per the weight of the materials.
82. The goods should be carried out as per the specified height width allowable as per RTO rules. If any penalty may be
occurred by you due to carry out the exceed height than the allowable height in such circumstances, you have to
produce the proof of penalty payment for reimbursement. In no other case penalty of RTO will be entertained.
83. In case of any disputes in terms and conditions of this tender or associated matter, decision of SE (TR) Jambuva will
be final and no legality is binding in any dispute aroused by contractor.
Seal & Signature of Bidder
SAFETY CUM INDEMNITY BOND
(On Non-judicial Stamp paper of value not less than Rs.300.00)
KNOW ALL MEN BYTHE SEPRESENTS that we, By this SAFETY CUM INDEMNITY BOND Executed on this
____________ Day of 2026.I/We Having Registered Office (here in after called “THE CONTRACTOR” which
expression shall mean and includes my/our heirs, executors, administrators and legal representatives,
successors and permitted assigns)do hereby binds myself/ ourselves and also our company/firms after having
the power to bind by this promise and undertaking in favour of the Gujarat Energy Transmission Corporation
Limited (GETCO),Vadodara State Transmission Utility under The ElectricityAct,2003 having its registered office
at Sardar Patel Vidyut Bhavan, Racecourse, Vadodara.(here in after called as GETCO, which expression shall
mean and include its legal representative, administrators as signs)has agreed under the terms and conditions
of the contract no. ______________________________________________Dated__________made between
____________________and__________________________ for the contract of the value of Rs
_______________ interalia on Production of Safety cum Indemnity Bond.
We do hereby undertake and agree to Indemnify and keep Indemnified GETCO from time to time to the extent
of Rs. Rupees only against any losses or damages, costs, charges and
expenses caused to or suffered by reason of the CONTRACTOR while Project, R&M, O&M work including work
carried out by outsourcing agency, failing to take proper care or not complying the guidelines given hereunder
as per Annexure-A and instructions which may be given from time to time during the continuance of the contract
and we further undertake to unconditionally pay the amount claimed by the GETCO on demand and without
demur to the extent aforesaid.
Whereas the CONTRACTOR has/ have been awarded to execute the job/works under order no. ____ dated
_____________________________________________issued by the GETCO after having observing
necessary formalities, the details of which is described in the order no. dated and whereas the said
job/works will be /likely to be done in places covered under Employees’ State Insurance Act, 1948 (ESI) and /or
the Workmen Compensation Act,1923 and /or other laws relating to the Labour Management and Welfare Act.
(Respective Amendments)
And whereas according to the condition of the Contract the CONTRACTOR is under obligation to execute this
Safety cum Indemnity Bond before the commencement of actual execution of work
Now the indenture witnesses that I/We the CONTRACTOR do hereby undertake to follow the guidelines as per
Annexure-A prepared by the GETCO.
Further we the CONTRACTOR agree that the GETCO shall be sole judge of and as to whether th ere has been
any breach of the guidelines as per Annexure-A of this bond and as to the extent of the loss, damages, costs,
charges and expenses caused to or suffered by the GETCO.
We the CONTRACTOR further agree that our liability under this bond shall not be discharged because of the
change in the constitution of the GETCO or for the extension of the time limit or for any other reason.
We the CONTRACTOR further agrees to the given terms and conditions:
a. That the CONTRACTOR undertakes /undertake to indemnify and keep harmless the GETCO from all
claims, actions, proceedings and risk, damage danger to any person whether belonging or not belonging
to the. CONTRACTOR.
b. That the CONTRACTOR shall keep harmless the GETCO from all claims, compensation, damages any
proceedings in respect of any of its employee / workmen under the Workmen Compensation Act or any
other laws for the time being in force.
c. That, if during the course of execution of work as stated in the contract order mentioned hereinabove
issued by the OBLIGEE, it is found that the CONTRACTOR has not complied with guidelines as per
Annexure-A or terms and conditions / formalities within the meaning of Employees’ State Insurance
Act,1948 (ESI) or Workmen Compensation Act 1923 or any other laws relating to the Labour Welfare for
the time being in force, and also has not observed the safety norms in accordance with the law prevailing
at the place of work/job to the satisfaction of the GETCO, the GETCO shall have the right to stop the
execution of work/job and the period of such stoppage shall not be taken into account for the calculation
of the total period of completion of work for which the CONTRACTOR is responsible to complete the
work/job and it will be deemed that discontinuance was due to default of the CONTRACTOR .
d. That, if any time, due to exigency, GETCO as the Principle Employer, becomes liable to pay any such
compensation mentioned hereinabove, whether on failure of the CONTRACTOR or for any other reason,
the GETCO shall have the right to recover the said amount from any amount receivable by GETCO or
any bank guarantee deposited or anything payable whether in connection with this contract or other
contract by the CONTRACTOR to the OBLIGEE.
e. That the CONTRACTOR is/are aware and accept that for the persistent or repeated violation of any
guidelines as per Annexure-A and terms and conditions mentioned in this Safety cum Indemnity Bond,
GETCO shall have right to terminate the contract of work issued to the CONTRACTOR.
f. In case if any safety related fatal Electrical / Mechanical accident occurred to any employee of agency or
outsider due to negligence or non-compliance of GETCO safety norms then in addition to the
Seal & Signature of Bidder
compensation and liability as per statutory requirement, contractor / agency is hereby agreed to pay the
penalty amount as given below:
Sr.No Amount of Contract in Rs. Penalty amount
1 Up to 1Lac Rs.5000/- plus applicable taxes if any
2 Above 1Lac to 10Lacs Rs.40000/- plus applicable taxes if any
3 10 to 100 Lacs Rs.100,000/- plus applicable taxes if any
4 >100Lacs 1.0% of contract plus applicable taxes if any
g. I/We the CONTRACTOR here by confirm that in case of any dispute/ difference for settlement of claims
under this Safety Cum Indemnity bond the courts in Gujarat State wherever job/ work is performed or as
per GETCO norms shall have the jurisdiction to decide the rights &liabilities of the parties while
adjudicating the matter of claims under this Safety Cum Indemnity Bond.
h. This Safety cum Indemnity Bond shall continue and hold good until it is released by the GETCO in Writing
on the CONTRACTOR’s application after the Contractor has discharged all his obligations under the order
mentioned hereinabove and submitted a “NO DEMAND CERTIFICATE” from the GETCO under the said
order. The Safety cum Indemnity Bond shall be valid for a CONTRACT PERIOD and renewable thereof
(Claim Period).
i. This Safety cum Indemnity Bond and the guidelines as per Annexure-A herein contained are in addition
to And not by way of limitation or substitution for any other guarantee, indemnities Hereto before given
to the GETCO by the CONTRACTOR and this indemnity does not Revoke or limit such indemnities
or guarantees. IN WITNESS WHEREOF the Parties hereto have executed this indenture the day the year
First hereinabove written.
(Signature with seal of The CONTRACTOR)
In the presence of:
Seal & Signature of Bidder
(Non Judicial Stamp Paper of Rs. 300/-)
INDEMINITY BOND
KNOW ALL MEN BY THESE PRESENTS that we, Messer’s
Contractor” which expression shall, where the context so admits, include their heirs, executors, administrators and legal
representatives, successors and permitted assigns) are hereby held and firmly bind unto the Gujarat Energy Transmission
Corporation Ltd (hereinafter called “the GETCO” which expression shall, where the context so admits, include its
successors and assigns) to refund the full amount of materials supplied by the GETCO under the terms and conditions of
loss damage or deterioration of whatsoever nature occurs to said materials supplied by the GETCO and which are in the
custody of the contractor at their works site, on behalf of the GETCO, at
_______________________________________(name of line) _______________ and / or if any of the said materials,
when inspected by any officer authorized by the GETCO in this behalf, is found to be damaged, lost, deteriorated in quality
or quantity, the contractor hereby agrees to bind himself to indemnity and at all times keep indemnified the GETCO against
all loss, damage and deterioration to the any material supplied by the GETCO during his custody and shall pay in cash on
demand from the GETCO within 30 days the market value of such materials which is lost, damaged or deteriorated in full
to the GETCO and shall also hereby authorize the GETCO to deduct the said sum from any sum due to the contractor or
any sum which may at any time become due to the contractor under the above referred contract or any other contract
entered into by the contractor with the GETCO.
AND WHEREAS the contractors do hereby agree to be responsible for the safe custody and protection and preservation
of the said materials against all risks, excluding war risks and against loss, damage and deterioration of whatsoever nature
in respect of the said materials while it remains in the custody and possession of the contractor.
AND WHEREAS the said materials shall at all times be open for inspection by any officer authorized by the GETCO. Now
the conditions of the above written bond are such that the contractor shall pay the full amount forthwith to the GETCO in
the event of loss, damage or deterioration or whatsoever except due to circumstances arising out of war in respect of the
materials supplied by the GETCO and shall fully and effectually indemnify and keep indemnified to the GETCO against
such loss, damage and deterioration.
The contractor shall keep the said materials open at all times for inspection by the officers authorized by the GETCO and
produce at any time when demanded.
THE WITNESS WHERE OF: We the
(Signature of contractor)
Hereto signed at ___________________
In the presence of
____________address ______________ (Signature)
_____________address ______________ (Signature)
Seal & Signature of Bidder
PROFORMA FOR CONTRACT AGREEMENT
(Non Judicial Stamp Paper of Rs. 300/-)
This Agreement is made at BARODA the_____________ day of ___________ in the Christian Year Two thousand twenty
six between M/s. _____________________________________ (address of office) ________________ (hereinafter
referred to as “THE CONTRACTOR” which expression shall unless excluded by or repugnant to the contract include its
successors or permitted assigns) of the ONE PART and the Gujarat Energy Transmission Corporation Ltd, having their
Head office at VidyutB havan, Race Course, Baroda 390 007 (hereinafter called “The GETCO” which expression shall
unless excluded by or repugnant to the context include its successors or assigns) of the other part.
WHEREAS the aforesaid GETCO has accepted the tender of the aforesaid contractors for
______________________________________ _______________ hereinafter called “the works” and more particularly
described and enumerated or referred to in the specification, terms and conditions prescribed in the order letter, covering
letter and other letters and schedule of price which for the purpose of identification have been signed by Shri
____________________________________ on behalf of the contractors and by ---------------------------------- on behalf
of the GETCO, a list whereof is made out in the Schedule hereunder written and all of which said documents are deemed
to form part of this contract and included in the expression “The works” wherever herein used, upon the terms and subject
to the conditions hereinafter mentioned.
AND WHEREAS THE GETCO has accepted the tender of contractors for the construction of the said works for the sum of
to the conditions herein mentioned.
NOW THIS AGREEMENT WITNESSESS AND IT IS HEREBY AGREED AND DECLARED THAT.
1. The contractors shall do and perform all works and things in this contract mentioned and described or which are
implied therein or there from respectively or are reasonably necessary for the completion of the works as
mentioned and at the times, in the manner and subject to the terms and conditions and stipulations contained in
this contract, and in consideration of the due provision, executions, supply and completion of the works agreed to
by the contractor as aforesaid the Board doth hereby covenant with the contractor to pay all the sums of moneys
as and when they become due and payable to the contractors under the provisions of the contract. Such payment
to be made at such times and in such manner as is provided by the contract.
2. The conditions and covenants stipulated here-in-before in this contract are subject to and without prejudice to the
rights of the Board to enforce penalty for delays and / or any other rights whatsoever including the right to reject
and cancel on default or breach by the contractor of the conditions and the covenants as stipulated in the general
conditions, specifications, forms or tender schedule etc. attached with GETCO’s Order No.
The contract value, extent of supply & erection works, delivery dates , specifications and other relevant matters
may be altered by mutual agreement and if so altered shall not be deemed or construed to mean or apply to
affect or alter other terms and conditions of the contract and the general conditions and the contract so altered or
revised shall be and shall always be deemed to have been subject to and without prejudice to said stipulation.
List of documents forming part of the contract:
1. GETCO’s Tender Specification No. ____________ and contractor’s offer opened on dated ____/____/2026
2. GETCO order No. Dtd. _____ / ______/
3. Contractor’s acceptance of order vide letter no. _______________.
4. Contractor’s Partnership Deed dtd. ________________.
5. Contractor’s Power of Attorney / Board Resolution authorizing person to sign on behalf of Firm.
In witness whereof the parties here to have set their hands and seals this day and month, year first above written.
1) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
For and behalf of M/s. __________________ (Signature)
In the presence of (Full Name, Address and Signatures)
Seal & Signature of Bidder
2) Signed, sealed and delivered by
(Signature with name, Designation and official seal)
For and on behalf of Gujarat Electricity Board, Vidyut Bhavan,
Race Course, Baroda - 390
In the presence of name, Full address and Signature:
Seal & Signature of Bidder
DETAILS OF THE EXPERIENCE FOR Transportation
Sr. Name of Order Order Date of Date of Order fully Status if
No Division / reference no. value Commence completion executed order under
Circle & Date ment execution
A Gujarat Energy Transmission Corporation Ltd., GETCO:
B OTHER STATE ELECTRICITY BOARDS:
C PRIVATE FIRMS:
Seal & Signature of Bidder
In connection with the above subject and reference I/ We confirm the following:
1. I / We, the under signed have read and examined the Tender Specifications in tender mentioned under reference
along with the General/ Commercial terms and conditions.
2. I / We, declare that our Technical Bid is strictly in line with the Tender specifications (except the deviations shown
in Annexure of Technical Deviations..
3. Further, I / We also agree that additional conditions / deviations, if any, found in the tender terms & conditions
(except reference indicated under Annexure ___ this tender document), our offer shall be out rightly rejected without
assigning any reason thereof.
NOTE: ALL THE DOCUMENTS SHOULD BE PROPERLY FILED AND SHOULD BE GIVEN
FLAG MARKING FOR IDENTIFICATION.
DETAILS OF TOOLS AND TACKLES
Sr No Description of Tools & Tackles Make Capacity Unit Available
Seal & Signature of Bidder
(Strike off whichever is not applicable)
This is to declare that Mr/Ms. __________________________________, employee of GETCO at
_______________________(designation & name).
This is to declare that none of the Proprietors/ Partners/ Directors are having any relatives employed or working with Gujarat
Energy Development Agency at any of its offices or its parent Department i.e. Energy & Petrochemicals Dept., Govt. of
DEVIATION SHEET
Any deviations offered from the terms and conditions of the Offer should be clearly specified below in this sheet. If there
are no deviations offered, it should be clearly mentioned on this page.
Deviation offered to Chapter Deviation offered
No, Clause No. of the tender
Seal & Signature of Bidder
Gujarat Energy Transmission Corporation Ltd.
Qualification Requirement.
Contractor must fill up below details & should place at the top of the Technical Bid.
Sr No: List of Documents
1 Registration Class – with valid up to
3 Partnership deed/Proprietor (Notarized copy)
4 Power of Attorney (Notarized copy)
5 Bl. Sheet / P&L A/C, Statement of last three
6 Latest Solvency certificate. Rs. Lacs issued by Bank, branch
8 GST registration No
9 Experience certificate – form 3A of last
years (minimum value of similar work done
should be equal to or more than 50% of
Signature of Tenderer Company’s Round Seal
Seal & Signature of Bidder
Vendor must fill up below details & should place at the top of the Technical Bid.
1 PRICES: (FIRM ONLY)
(Please Specify YES / NO.)
2 SECURITY TERMS AGREED:
(please specify YES / NO)
3 P.G. TERMS AGREED: (wherever applicable):
(P.G. performance Guarantee) (please specify
4 VALIDITY OF THE OFFER AGREED:
(Please specify YES/NO.)
5 PAYMENT TERMS AGREED:
(Please specify YES/NO.)
6 ITEMS OFFERED:
7 TELEPHONE NOS. & FAX NO.
8 Authorized person of the firm
9 If vendor Registration is done: (Please submit copy
of vendor registration approval letter in the EMD
Seal & Signature of Bidder
DETAILS TO BE FURNISHED BY THE TENDERER.
Details required to be furnished by the Tenderers by writing Yes/No against each item.
1) Whether the Tenders submitted is on item rate basis as called for. Yes / No
2) Whether rebate furnished is in percentage basis as called for. Yes / No
3) Whether the tender is submitted by Registered Post. Yes / No
4) Whether all pages of Tender Specifications are sealed and signed by the Contractor. Yes / No
5) a) Whether the Tenderer is registered with GETCO. Yes / No
b) In case of Yes in above, please furnish following details:- Yes / No
i) Registration Letter No. & Date:-
ii) Class of Registration
c) Whether Tenderer is having PF Code No. Yes / No
6) a) Whether EMD Paid. Yes / No
b) In case of Yes, Please furnish details Yes / No
7) Whether following documents of Section-E-IV Part B are submitted.
a) Human Resources Details Yes / No
b) Availability of tools, equipments etc. Yes / No
c) Details of orders executed Yes / No
d) Financial capability Yes / No
e) Latest Income-Tax certificate Yes / No
f) Bank Guarantee (For E.M.D., if applicable) Yes / No
g) Company’s Article Of Association. Yes / No
h) Details Of Partners/Directors. Yes / No
i) B R /P A Authorized Person. Yes / No
j) Power Of Attorney of Consortium Members. Yes / No
The Tenderer should have to submit with Tender on letter pad along with attested copies of the
certificate of (1) PAN No. (2) Registration from GETCO (3)Latest Solvency Certificate from
Schedule Bank / Revenue Bank, (4) Partnership deed, (5) Latest Registration Certificate for
provident fund of Employees / Labors and P.F. Code No. and its latest receipt, (6) Experience
Certificate (7) Payment of Tender Fee & EMD in D.D. in favour Of GETCO, Jambuva. (8) GST
registration proof (9) Copy of work order of such type of work carried out.
The GETCO reserves the rights to reject any or all tenders or accept any tender without assigning any reason
Seal & Signature of Bidder
(UNDERTAKING IN REGARD TO STOP DEAL/BANNED FOR USED BUSINESS DEALING / BLACKLIST
Sub: UNDERTAKING IN REGARD TO STOP DEAL/BANNED FOR USED BUSINESS DEALING/BLACK LIST
Ref: Tender No.______________
All bidders will have to furnish the following undertaking duly filled in, signed and stamped for each quoted item of
the tender along with technical bid.
Authorized signatory of M/s.____ _____________________________________
and thereby certified that M/s.___________________________________________
and their proprietor/any partner/any director of the firm is not stop deal and /or banned for business dealing and /or black
listed by GUVNL/or their any subsidiary company viz. GSECL/GETCO/MGVCL/PGVCL/UGVCL/DGVCL.
Signature of tenderer
Seal & Signature of Bidder
(TO BE SUBMITED ON FIRM’S LETTER HEAD)
The Superintending Engineer (TR)
Gujarat Energy Transmission Corporation Ltd,
Circle Office,Jambuva
We hereby acknowledge, agree and accept your A/T under reference above with terms and conditions mentioned therein.
Designation ___________________
Seal & Signature of Bidder
PRICE BID ( Tender -JTC / 26-27 / n-03 )
Bi-Annual Rate Contract for the year of 2026-28 for the work of Transportation of any sub-station / line
materials from various Store / Sub-station of GETCO to various store / sub-station / line site of GETCO
including Loading, Unloading and Stacking of material on as and when required basis under Jambuva Circle
Sr. SOR Description Qty. Rate in Rs. Unit Amount in Rs.
L Transportation
1 L-1 Transportation of Girder, Rail, All types of
substation / tower structures, conductor,
Insulator, Cables, Hardware, G. I. Strips,
Earthwire, Staywire, Furniture, Transformer
oil, Breaker, CT, PT LA, Panels, Battery set,
Battery charger, PLCC equipment, Isolator,
Testing equipment, etc from GETCO’s
nearest / any Store Centre/ Substation to
another destination including loading and
(i) up to 70 KMs (Upto 6 MT) - Lumsum 40.00 16,848.00 Job /
(To be executed / considered for a particular Lot
Job / Lot while weight is not increasing 6 MT
per Trip like transportation of 03 Nos. of 66kV
(ii) upto 70KMs (Beyond 6 MT) - proportionate 200.00 2,808.00 Per MT
(iii) Beyond 70KMs* 20,000.00 22.00 Per MT
2 L-2 Transportation of Girder, Rail, All types of
substation / tower structures, conductor,
Insulator, Cables, Hardware, G. I. Strips,
Earthwire, Staywire, Furniture, Transformer
oil, Breaker, CT, PT LA, Panels, Battery set,
Battery charger, PLCC equipment, Isolator,
Testing equipment, etc from GETCO’s
nearest Store Centre/ Substation to another
destination excluding loading and unloading.
L - 2 (i) up to 70 KMs (Upto 6 MT) - Lumsum 40.00 12,527.00 Job /
(To be executed / considered for a particular Lot
Job / Lot while weight is not increasing 6 MT
per Trip like transportation of 03 Nos. of 66kV
L - 1 (ii) upto 70KMs (Beyond 6 MT) - proportionate 200.00 2,087.00 Per MT
L - 2 (iii) Beyond 70KMs* 20,000.00 21.00 Per MT
K Loading or unloading (including stacking & 2,00,000.00 Job
segregation) of 400/220/132/66kV valuable works
s/s equipments.
K- 1 (b) (ii) 220kV 858.00 Per No
K- 1 (c) (iii) 132kV 342.00 Per No
K- 1 (d) (iv) 66kV 321.00 Per No
4 Loading or unloading (including stacking &
segregation ) of 400/220/132/66kV valuable
s/s equipments. LA
K- 2 (a) (i) 400kV 643.00 Per No
Seal & Signature of Bidder
K- 2 (b) (ii) 220kV 388.00 Per No
K- 2 (c) (iii) 132kV 280.00 Per No
K- 2 (d) (iv) 66kV 228.00 Per No
5 Loading or unloading (including stacking &
segregation ) of 400/220/132/66kV valuable
s/s equipments.BREAKER
K- 3 (b) (ii) 220kV 2,602.00 Per No
K- 3 (c) (iii) 132kV 1,759.00 Per No
K- 3 (d) (iv) 66kV 1,256.00 Per No
6 Loading or unloading (including stacking &
segregation ) of 400/220/132/66kV valuable
s/s equipments. Isolator without structure
K- 4 (a) (i) 400kV 2,936.00 Per set
K- 4 (b) (ii) 220kV 1,565.00 Per set
K- 4 (c) (iii) 132kV 392.00 Per set
K- 4 (d) (iv) 66kV 303.00 Per set
7 Loading or unloading (including stacking &
segregation ) of 400/220/132/66kV valuable
s/s equipments.Isolator with structure
K- 5 (a) (i) 400kV 3,524.00 Per set
K- 5 (b) (ii) 220kV 1,760.00 Per set
K- 5 (c) (iii) 132kV 489.00 Per set
K- 5 (d) (iv) 66kV 401.00 Per set
8 Loading or unloading (including stacking &
segregation ) of 400/220/132/66kV valuable
s/s equipments.BPI
K-6 (a) (i) 400kV 206.00 Per No
K-6 (b) (ii) 220kV 147.00 Per No
K-6 (c) (iii) 132kV 69.00 Per No
K-6 (d) (iv) 66kV 44.00 Per No
9 K-7 Loading or unloading (including stacking & 71.00 Per No
segregation ) of Transformer oil Barrel
10 K-8 Loading or unloading (including stacking & 219.00 Per MT
segregation ) of steel sections, 11kv power /
control cable drums, conductor & earthwire
drums, and any other packed materails.
11 K-9 Loading or unloading (including stacking & 277.00 Per MT
segregation) of Sub-station structure
materials & tower materials with bolt-nuts
including proper stacking at the store yard.
12 K-10 Loading or unloading (including stacking & 315.00 Per MT
segregation ) of H.W. insulators & other items
of equivalent size & weight,.
13 K-11 Loading or unloading (including stacking & 383.00 Per No
segregation ) of battery set / battery charger,
All class C&R panel, 11kV panel, 11kV
station trasnformer, and LT panel
board.DCDB, PLCC Panel, RTU Panel,
Seal & Signature of Bidder
14 K-12 Loading or unloading (including stacking & 35.00 Per No
segregation ) of Rubber matting/ VHF set with
battery/ Fire extinguisher / computer set/
printer and other items of equivalent size and
15 K-13 Loading or unloading (including stacking & 1,762.00 Per
segregation ) of furniture/ safety articles/ Trip
Uniform cloths and other items of equivalent
size and weight.
16 K-14 Hiring of crane for loading /unloading/ 3,218.00 Per
stacking / segeration of the material Truck
B B ) Percentage above / below = ______ % of ( A ) above / Below Amount Rs.
C C) Total quoted price (A + B) Rs.
D D) Add: GST @ _______% on ( C) Rs.
E E) Grand Total ( C +D) in Rs.
E E) Grand Total ( C +D) in Rs.
1 GST and Workers Welfare Cess will be reimbursed on production of documentary evidence of payment
made to appropriate Government Taxation Department as per Govt. /GETCO’s rules
2 Work to be carried out as per instruction of engineer in charge.
3 Rates for above item no. 3 to 15 are inclusive of utilization of all the required tools ,tackles and crane by
4 While rates of above item no. 3 to 15 are considered,item no.16 rates shall not be applied.
4 TRANSIT CUM STORAGE INSURANCE :- All the material intended under the contract for loading,
transportation & unloading shall be covered under the Storage cum Transit insurance covering the transit
risks shuch as Damage, Loss,Teft,Fire etc. and shall also cover labour insurance. The Bidder shall note this
and the storage cum transit insurance is to be taken at his own cost for covering the above cause for the
amount of Rs.50.00 lakh
5 Work shall be implemented as per Project / job /lot requirement
6 Illustrative Examples against Sr. No. 1 is shown as under. Item Sr. No. 2 shall be implemented same way.
Illustrative Examples against Sr.No.1
1 Weight: 4.5 MT, Distance transported: 52 KM
Total Payment = Rate as per (i) up to 70KMs = Rs. 16, 848/-
2 Weight: 10.5 MT, Distance transported: 65 KM
= Rate as per (ii) up to 70KMs X Unit per MT Rate
3 Weight: 3 MT, Distance transported: 95 KM
= (Rate as per (i) up to 70KMs) + {As per (iii)KM transported beyond 70 KM x Unit Rate of 3 MT}
= Rs. 16, 848 + {25 KM x 3 MT x Rs. 22.00 per MT/KM)
4 Weight: 14 MT, Distance transported: 105 KM
= Rate as per (ii) up to 70KMs X Unit per MT Rate + {As per (iii)KM transported beyond 70 KM x Unit Rate
= 14 MT X Rs. 2,808 per MT + {35 KM x 14 MT x Rs. 22.00 per MT/KM)
5 Extension of contract : The contract can be extended for the further period of 12 months with mutual
agreement with same rate, terms and condition of the contract.
Signature of Contractor Superintending Engineer
GETCO, CO, Jambuva
Seal & Signature of Bidder
I/we am / are ready to carry out the above work ………………………………………. % above/below, (In word
above/ below) of schedule rate of GETCO
Seal & Signature of Bidder
Seal & Signature of Bidder
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Technical bid n-3.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .