Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹12,000
Closing Date
1 Jul 2026, 4:00 pm7d left
Similar tender results from the same govt authority in the past 3 years.
AGM(Projects and Planning) UC
AGM(Projects and Planning) FACT-UC,Udyogamandal, Kochi, Kerala
Civil work for operators room near Sulphur melting pit at SO2 acid plant FACT-UC.
2026_FACT_912388_1
3009/2026-2027/E33679
Open Tender
Civil Works
120 days
Udyogamandal
Refer Tender Documents
6 documents required · 6 mandatory
₹0
₹12,000
Yes
10 Jun 2026
10 Jun 2026
2 Jul 2026
10 Jun 2026
1 Jul 2026
10 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Civil work for operators room near Sulphur melting pit at SO2 acid plant FACT-UC. | ||||||
| 1.01 | Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50m in all kinds of soil. | 23 | M3 | - | - | item1 |
| 1.02 | Cement concrete work in 1:4:8 mix using first class 40mm nominal size hard granite broken stones including all charges for mixing concrete, laying, consolidating, curing etc. complete foundation/levelling course, flooring etc. complete but excluding cost of formwork. | 3.5 | M3 | - | - | item2 |
| 1.03 | RCC work in 1:1½:3 nominal mix using 20 mm and downgrade hard granite broken stone including all charges for mixing concrete, laying, consolidating, curing etc.complete but excluding cost of form work & reinforcement works- For foundation footings, bottom & sides of trenches, equipment foundations, plinth beams, lintels, slabs, columns & beams etc.up to 5 m from ground level. | 12.5 | M3 | - | - | item3 |
| 1.04 | Cement plastering with CM 1:4,12 mm
thick and a neat cement flushing coat of cement and red oxide powder (red oxide@ 3.50 kg/50 kg of cement) for finishing smooth the concrete floor & trowelled smooth at all levels. | 43 | M2 | - | - | item4 |
| 1.05 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m. | 20 | M3 | - | - | item5 |
| 1.06 | Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) upto plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) including cost of cement | 30 | M3 | - | - | item6 |
| 1.07 | Solid concrete block masonry in cement mortar 1:5 using good quality cement concrete blocks approved by the Engineer in charge for superstructure in ground floor/upto 5m height from plinth level/floor level. | 22 | M3 | - | - | item7 |
| 1.08 | Providing steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete with Thermo-Mechanically Treated bars of grade Fe-500D (TMT bars) including cost of reinforcement steel | 1,300 | Kg | - | - | item8 |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. | 12 | M2 | - | - | item9 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.19 MB
TERMSE33679.pdf
Tender Documents • 15.55 MB
BOQ_958857.xls
BOQ • 0.29 MB
COMPE33679.pdf
Additional Documents • 4.60 MB
Download all tender documents and submit your bid