| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹63.7 LAccepted-AOC | L1 | Accepted-AOC Accepted | |
| 2 | L2₹74.2 L+₹10.5 L (16.5%)Rejected-AOC | L2 | Rejected-AOC Accepted | |
| 3 | L3₹74.7 L+₹11.0 L (17.2%)Rejected-AOC CHOCHUPARAMBIL ERATTUPETTA | IDUKKI | KERALA | 685501 | L3 | Rejected-AOC Accepted |
| Sl No | Description | Qty | Unit | NAUFAL P L1 | SHAHUL HAMEED L3 | ARDEN INFRATECH PRIVATE LIMITED L2 |
|---|---|---|---|---|---|---|
| 1.00Bridge Repair | ||||||
| 1.00 | OD89181/2025-2026:Lifting and Re-positioning of existing RCC span slabs on the Bearing pad by jacking up below i.e by placing the jacks on pier/abutment caps (for span length up to 30m) using suitable capacity Hydraulic jacks , crane and other supporting tools and tackles after providing MS grill platform over MS pipe posts of size 40mm
dia,6m long, frames erected including all hire and labour charges and cost of removal of entire
platform after
completion of the work. etc all complete as per the instruction of Engineer in charge | 1 | 1 nos | 2,37,620.92 ₹2,37,620.92 Lowest | 2,76,802 ₹2,76,802 | 2,76,802 ₹2,76,802 |
| 1.00 | 13.14:Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. | 4,32,000 | Cum cm | 0.97 ₹4,19,040 Lowest | 1.15 ₹4,96,800 | 1.12 ₹4,83,840 |
| 1.00 | OD83763/2025-2026:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. | 2,106 | sqm | 367.67 ₹7,74,313.02 Lowest | 430 ₹9,05,580 | 428.29 ₹9,01,978.74 |
| 1.00 | OD83760/2025-2026:Removing damaged concrete: Loose and delaminated concrete shall be identified and marked before proceeding with the removal. The loose cover concrete including the loose damaged concrete shall be removed upto beyond the corroded bars to a minimum depth of 10 mm behind the reinforcement. Only affected concrete shall be removed and conducting proper investigation, (Good & sound concrete should not be chipped / damaged) by chipping / hacking with chisel and hammer or by mechanical means like light weight chisel hammer, pneumatic chippers, making saw cut at periphery to avoid feather edge for all height and removal and disposal of debris at designated location including all material, labour, tools, temporary supports for structures, electricity, plant
and machineries etc. complete as directed by Engineer-in-charge and/or Consultant. Depth of chipping may vary from 20 to 100 mm | 277.65 | sqm | 541.01 ₹1,50,211.43 Lowest | 630 ₹1,74,919.5 | 629 ₹1,74,641.85 |
| 1.00 | OD83757/2025-2026:Rust remover/Rust Convertor: Cleaning of rust / scales / corrosion from reinforcement bars should be carried out using acid based rust remover, Reebakleens RR of Fosroc or equivalent, or using alkali based rust converters such as Feovert of Krishna Conchem. The material is to be applied to the rusted metal bar, using brush and leaving it to dry for 30 Min. & washing surface with fresh water as
required to exposed reinforcement bar at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries complete as per detail specification and as directed by Engineer-in-charge and/or Consultant. The concrete surface area containing the cleaned rebars shall be measured for payment. | 109.92 | sqm | 387.2 ₹42,561.02 Lowest | 455 ₹50,013.6 | 450 ₹49,464 |
| 1.01 | OD83755/2025-2026:Anti Corrosive treatment to Steel:Providing & applying inhibition coats/system to exposed reinforcement bars & also new bars, after cleaning & removing scales and rust completely as specified in 1.4, Two component inhibitor Nitozinc Primer std. of Fosroc or MasterEmaco P130 of BASF or equivalent having specific gravity of 1.75 and solid content 57(+/-3) Adhesive bond strength > 1.5 N/mm2, 40 microns DFT per coat as approved by Engineer-in-charge and/or Consultant shall be used as per manufacturer?s specification in two coats at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, necessary surface preparation and necessary protection after and during work. The concrete surface area
contianing the rebars where the treatment is carried out shall be considered for measurement. | 109.92 | sqm | 841.58 ₹92,506.47 Lowest | 985 ₹1,08,271.2 | 980 ₹1,07,721.6 |
| 1.01 | OD83762/2025-2026:New/Additional steel Reinforcement: Supplying, cutting, fabricating new reinforcement Fe500 for Jacketing, and providing additional
steel reinforcement to compensate corroded reinforcement in existing member etc. and fixing with old existing reinforcement which was reduced to 15 % or more of its original diameter as required as provided in original structure and additional steels as directed by EIC and/ or consultant as required tying with 16 gauge annealed binding wire complete as per drawing and specifications for all heights including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-incharge and/or consultant (TMT BARS of various size as required). | 1,383.51 | kg | 77.79 ₹1,07,623.55 Lowest | 95 ₹1,31,433.83 | 90.61 ₹1,25,360.2 |
| 1.01 | OD83754/2025-2026:Anchoring mainsteel and stirrups: Drilling holes of min 4mm larger than new rebar diameter into existing concrete substrate for anchoring of new rebar and depth of Min. 10 times the diameter of rebar and fixing with anchor resin grout Lokfix E (35/55/75) series or Lokfix P or Emfix or chemical anchor material or Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18-836 including cleaning, cutting, fabricating, chemicals, material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-chargeand/or consultant for all heights | 65 | no | 363.62 ₹23,635.3 Lowest | 425 ₹27,625 | 422 ₹27,430 |
| 1.01 | OD83753/2025-2026:Anchoring Steel & Shear Connectors: Drilling holes into existing concrete structure for anchoring of new rebar with 10 mm dia. shear
connectors at 0.5 Mt. c/c (or as per design recommendation) and fixing with anchor resin grout Lokfix P / Lokfix E 75/55/35 series or Emfix or pure epoxy resin based cartridge form chemical anchor material or Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18-836. Drilling hole for diameter: 14 mm, Drilling hole for depth: 100 mm including cleaning, cutting, fabricating, chemicals, material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or consultant for all heights | 300 | 1 nos | 252.89 ₹75,867 Lowest | 300 ₹90,000 | 294 ₹88,200 |
Tender Value
₹67.8 L
EMD Value
₹50,000
Closing Date
13 Mar 2026, 3:00 pmClosed
Executive Engineer
O/o Executive EngineerPWD BRIDGESDIVISIONPALAKKAD
GENERALRehabilitation work for Chitturpuzha Bridge at km 0960 of Thathamangalam Nattukal Road inChittur LAC Palakkad District General Civil Work
2026_PWD_844930_1
PWD/BR/TR/12773/2025_5_1_1/1
Open Tender
Civil Works - Bridges
Item Rate
180 days
Near Chittur college
Please refer Tender documents.
11 documents required · 11 mandatory
₹2,760
Yes
₹50,000
Yes
25 Jun 2026
7 Mar 2026
17 Mar 2026
7 Mar 2026
13 Mar 2026
7 Mar 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Bridge Repair | |||||
| 1.001 | OD89181/2025-2026:Lifting and Re-positioning of existing RCC span slabs on the Bearing pad by jacking up below i.e by placing the jacks on pier/abutment caps (for span length up to 30m) using suitable capacity Hydraulic jacks , crane and other supporting tools and tackles after providing MS grill platform over MS pipe posts of size 40mm
dia,6m long, frames erected including all hire and labour charges and cost of removal of entire
platform after
completion of the work. etc all complete as per the instruction of Engineer in charge | - | 1 nos | - | - |
| 1.002 | 13.14:Supplying, fitting and fixing in position true to line and level elastomeric bearing conforming to IRC: 83 (Part-II) section IX and clause 2005 of MoRTH specifications complete including all accessories as per drawing and Technical Specifications. | 0.58 | Cum cm | - | - |
| 1.003 | OD83763/2025-2026:Providing and fixing double scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done. | - | sqm | - | - |
| 1.004 | OD83760/2025-2026:Removing damaged concrete: Loose and delaminated concrete shall be identified and marked before proceeding with the removal. The loose cover concrete including the loose damaged concrete shall be removed upto beyond the corroded bars to a minimum depth of 10 mm behind the reinforcement. Only affected concrete shall be removed and conducting proper investigation, (Good & sound concrete should not be chipped / damaged) by chipping / hacking with chisel and hammer or by mechanical means like light weight chisel hammer, pneumatic chippers, making saw cut at periphery to avoid feather edge for all height and removal and disposal of debris at designated location including all material, labour, tools, temporary supports for structures, electricity, plant
and machineries etc. complete as directed by Engineer-in-charge and/or Consultant. Depth of chipping may vary from 20 to 100 mm | 1 | sqm | - | - |
| 1.005 | OD83757/2025-2026:Rust remover/Rust Convertor: Cleaning of rust / scales / corrosion from reinforcement bars should be carried out using acid based rust remover, Reebakleens RR of Fosroc or equivalent, or using alkali based rust converters such as Feovert of Krishna Conchem. The material is to be applied to the rusted metal bar, using brush and leaving it to dry for 30 Min. & washing surface with fresh water as
required to exposed reinforcement bar at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries complete as per detail specification and as directed by Engineer-in-charge and/or Consultant. The concrete surface area containing the cleaned rebars shall be measured for payment. | - | sqm | - | - |
| 1.006 | OD83755/2025-2026:Anti Corrosive treatment to Steel:Providing & applying inhibition coats/system to exposed reinforcement bars & also new bars, after cleaning & removing scales and rust completely as specified in 1.4, Two component inhibitor Nitozinc Primer std. of Fosroc or MasterEmaco P130 of BASF or equivalent having specific gravity of 1.75 and solid content 57(+/-3) Adhesive bond strength > 1.5 N/mm2, 40 microns DFT per coat as approved by Engineer-in-charge and/or Consultant shall be used as per manufacturer?s specification in two coats at all heights, including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, necessary surface preparation and necessary protection after and during work. The concrete surface area
contianing the rebars where the treatment is carried out shall be considered for measurement. | - | sqm | - | - |
| 1.007 | OD83762/2025-2026:New/Additional steel Reinforcement: Supplying, cutting, fabricating new reinforcement Fe500 for Jacketing, and providing additional
steel reinforcement to compensate corroded reinforcement in existing member etc. and fixing with old existing reinforcement which was reduced to 15 % or more of its original diameter as required as provided in original structure and additional steels as directed by EIC and/ or consultant as required tying with 16 gauge annealed binding wire complete as per drawing and specifications for all heights including all material, labour, tools, temporary supports for structures, electricity, plant and machineries, curing etc. complete as directed by Engineer-incharge and/or consultant (TMT BARS of various size as required). | 0.6 | kg | - | - |
| 1.008 | OD83754/2025-2026:Anchoring mainsteel and stirrups: Drilling holes of min 4mm larger than new rebar diameter into existing concrete substrate for anchoring of new rebar and depth of Min. 10 times the diameter of rebar and fixing with anchor resin grout Lokfix E (35/55/75) series or Lokfix P or Emfix or chemical anchor material or Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18-836 including cleaning, cutting, fabricating, chemicals, material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-chargeand/or consultant for all heights | - | no | - | - |
| 1.009 | OD83753/2025-2026:Anchoring Steel & Shear Connectors: Drilling holes into existing concrete structure for anchoring of new rebar with 10 mm dia. shear
connectors at 0.5 Mt. c/c (or as per design recommendation) and fixing with anchor resin grout Lokfix P / Lokfix E 75/55/35 series or Emfix or pure epoxy resin based cartridge form chemical anchor material or Masterflow 935 of BASF or equivalent as per NF P 18-831 and NF P 18-836. Drilling hole for diameter: 14 mm, Drilling hole for depth: 100 mm including cleaning, cutting, fabricating, chemicals, material, labour, tools, temporary supports for structures, electricity, plant and machineries etc. complete as directed by Engineer-in-charge and/or consultant for all heights | - | 1 nos | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1426709.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 8.70 MB
BOQ_1426709.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .