| 1.00Obstruction removal | ||||
| 1.00 | 2.33.4:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth | 1 | each | 15,290.29 ₹15,290.29 Lowest |
| 1.00 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | 7 | each | 7,632.29 ₹53,426.03 Lowest |
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 56 | each | 1,644.39 ₹92,085.84 Lowest |
| 1.00 | OD32205/2025-2026:Cutting and removing fallen trees from canal including branches and trunks and stacking of serviceable materials and disposal of unserviceable materials as per the orders of departmental officers at site | 120 | hour | 1,269.54 ₹1,52,344.8 Lowest |
| 1.00 | OD32209/2025-2026:Removing water hyacinth and other vegetation and floating bodies from water way cutting, collecting, conveying and disposing at places pointed out by the departmental officers at site with all leads and lift and other incidental charges such as hire charges for country boats and other necessary equipments required for the work etc complete | 34,000 | per sqm | 9.42 ₹3,20,280 Lowest |
| 1.01 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 30 | each | 253.02 ₹7,590.6 Lowest |
| 1.01 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 25 | each | 452.9 ₹11,322.5 Lowest |
| 1.01 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 20 | each | 615.79 ₹12,315.8 Lowest |
| 1.01 | OD51486/2025-2026:Earth work in excavation/desilting from rivers/canals using hydraulic excavator of 1 cum bucket capacity including cutting and trimming, side slopes, in accordance with requirements of lines, grades and cross sections and transporting to the nearest pick-up point within all lifts and lead up to 1000m etc complete | 2,971.5 | cum | 253.83 ₹7,54,255.85 Lowest |
Tender Value
₹21.2 L
EMD Value
₹50,000
Closing Date
18 May 2026, 6:00 pmClosed
Executive Engineer AID Thrissur
Executive Engineer AID Thrissur
GENERAL-IWT - PC Canal-Obstruction removal from PC canal from Poovathumkadavu (Ch. 251.18) to Munayam (Ch.272.18) in Thrissur District-General Civil WorK
2026_Irrig_846115_2
IRR/IA/TR/6788/2025_5_1_1/1
Open Tender
Civil Works - Others
Item Rate
180 days
Poovathumkadavu
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,760
₹50,000
22 Jun 2026
8 May 2026
20 May 2026
8 May 2026
18 May 2026
8 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Obstruction removal | |||||
| 1.001 | 2.33.4:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Above 240 cm girth | - | each | - | - |
| 1.002 | 2.33.3:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyond 120 cm girth up to and including 240 cm girth | - | each | - | - |
| 1.003 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | - | each | - | - |
| 1.004 | OD32205/2025-2026:Cutting and removing fallen trees from canal including branches and trunks and stacking of serviceable materials and disposal of unserviceable materials as per the orders of departmental officers at site | - | hour | - | - |
| 1.005 | OD32209/2025-2026:Removing water hyacinth and other vegetation and floating bodies from water way cutting, collecting, conveying and disposing at places pointed out by the departmental officers at site with all leads and lift and other incidental charges such as hire charges for country boats and other necessary equipments required for the work etc complete | - | per sqm | - | - |
| 1.006 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.007 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | - | - |
| 1.008 | 50.2.33.7:Cutting branches of trees overhanging above any structures of girth between 90cm to 120cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - |
| 1.009 | OD51486/2025-2026:Earth work in excavation/desilting from rivers/canals using hydraulic excavator of 1 cum bucket capacity including cutting and trimming, side slopes, in accordance with requirements of lines, grades and cross sections and transporting to the nearest pick-up point within all lifts and lead up to 1000m etc complete | - | cum | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1435960.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.06 MB
viewnit.pdf
Tender Documents • 0.03 MB
Epaymentrequisition.pdf
Other Document • 0.00 MB
INTEGRITY.pdf
Other Document • 0.25 MB
Affidavit.pdf
Other Document • 0.52 MB
BOQ_1435960.xls
BOQ • 0.24 MB
SBD.pdf
Tender Documents • 1.71 MB
FOT.pdf
Other Document • 0.24 MB
PAG.pdf
Other Document • 0.43 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .