| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹2.0 LAccepted-Finance | ₹2.0 L | 1 | Accepted-Finance O.K. |
| 2 | 2₹2.1 LAccepted-Finance | ₹2.1 L | 2 | Accepted-Finance O.K. |
| 3 | 3₹2.1 LAccepted-Finance | ₹2.1 L | 3 | Accepted-Finance O.K. |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
9 Jun 2021, 5:00 pmClosed
SE ETC Bareilly
Superintending Engineer Transmission Campus Near L.I.C. Office Rampur Garden, Bareilly
Replacement of Gaskets of 40MVA Transformer-I (ABB make) and other associated works at 220KV Substation Dohna under E.T.D.-II Bareilly
2021_UPTCL_586473_1
E-Tender No. 04/ETC(B)/ 2021-22
Open Tender
Electrical Works
15 days
Bareilly
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
SE ETC BAREILLY
₹2,000
24 Aug 2021
13 May 2021
10 Jun 2021
13 May 2021
9 Jun 2021
13 May 2021
Amount
Replacement of Gaskets of 40MVA Transformer-I (ABB make) and other associated works at 220KV Substation Dohna under E.T.D.-II Bareilly along with other associated Works under E.T.D. Budaun with all Cost of Men, Materials, Misc. Consumables, T&Ps etc. Required for Satisfactory Completion of the Work as per Technical Specifications and Direction of the Supervising Engineer, as per Details below :
To and Fro Carriage of 20KL Oil Storage Tank between designated Primary 400KV / 220KV / 132KV Sub Station in Bareilly (within 30 Km distance) and 220KV S/S Dohna including its loading and its unloading at each Sub Station..
Removal of Jumpers of LV side of the Transformer. The Scope of Work involves Opening of Bolts & Nuts and Removal of Jumpers, Bushing Clamps etc
Partial Draining of Transformer Oil (approx. 10 KL) from the Transformer into Empty Oil Storage Tank to make transformer oil up to required level.
Partly Dismantling of the Transformer. By removing Radiators, Bushings, Cooling Fans, than Stacking of all the Dismantled Parts at Proper Place alongwith other associated Works
Replacement of old Gaskets from different Parts of the Transformer as per Details below. The Scope of Work involves Removal of Gaskets, Cleaning of Surfaces, Fabrication of Gaskets of Appropriate Sizes out of Gaskets of Thickness 12 / 10 / 8 / 6 mm of Konica / Torborze / Nu-cork make and Fixing of Gaskets at Proper Place with Adhesive alongwith other associated Works :
(a) Gaskets of 33 KV Bushings
(b) Gaskets of 33 KV Bushings Top Seal
(c) Gasket of Neutral Bushing ( Top & Bottom )
(d) Radiator Gaskets
(e) Radiator Valves Gaskets
(f) Gaskets of Conservator Tank
Erection of the Transformer. The Scope of Work involves Refitting of all the Dismantled Parts of the Transformer such as Radiators, Bushings etc. The Work also involves Attending the Oil Leakage, if any, after Refilling of Transformer Oil.
Initial circulation of Drained oil in Oil Tank and Filling of Transformer Oil into Main Tank and Radiators from Oil Tanks by of after Execution of Gasket Replacement Work and Centrifuging of oil Taking the BDV Values of Oil and IR Values of the Transformer Bushings, Periodically (every 2 hrs.) till the Required Values are Achieved.
Jumpering of LV side Bushings of the Transformer. The Scope of Work involves Tightening of Bushing Clamps with Appropriate sizes Bolts & Nuts as per Required.
M/s S.S. Refregeration
M/s Abhinav Enterprises
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid