Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹3.6 L+₹31.96 (<0.01%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹3.6 L+₹118.79 (0.03%)Rejected-Finance | L3 | Rejected-Finance L3 |
Tender Value
₹3.6 L
EMD Value
₹36,000
Closing Date
26 Oct 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECTIVE ENGINEER IRRIGATION DEPARTMENT IN UP
EXECTIVE ENGINEER SHARSA SAHAYAK KHAND-32 AZAMGARH (UP)
Construction of VRB
2022_UPIDC_734550_30
02/EE/2022-23/C551
Open Tender
Civil Works
Item Rate
180 days
AZMGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹36,000
Yes
5 Nov 2022
20 Oct 2022
26 Oct 2022
20 Oct 2022
26 Oct 2022
20 Oct 2022
Amount
Earth work in digging foundation all type soil including all lead and lift proper disposal and back filling ,labour and T&P etc.
Laying Plain Cement Concrete (1 : 3 : 6) with crushed aggregate and coarse sand including all cost of materials , labour and T&P etc.
First class brick work in 1:4 cement and coarse sand mortar up to 3M lift and 60M lead of materials with including all cost of materials, scafolding, labour and T&P etc.
Cement Pointing (Struck deep) 1:2 Cement and coarse sand mortar on brick masonry including all cost of materials, scafolding, labour and T&P etc.
Laying Reinforcement Cement Concrete (1 : 1.5 : 3) with coarse sand and crushed aggregate including all cost of materials, labour and T&P etc.
Laying C.C. (1 : 1.5 : 3) with coarse sand and crushed aggregate including all cost of material, labour and T&P etc.
(a) Centering & Shuttering for R.C.C. work - For Bridge Slabs upto 3M span including all cost of materials , fixing , removing , lobour and T&P etc.
(b) Shuttering for C.C. blocks and concrete including all cost of materials , labour and T&P etc.
Providing and fixing of Joint Filler Board with cost of all materials, labour and T&P etc.
Providing and fixing of Spout Drainage Pipe including all cost of materials, labour and T&P etc.
Fixing of stone Wheel Guard (0.200 x 0.200 x 0.750m ) , with earth cutting and earth filling, including all materials , Labour and T&P etc.
Making and maintaining of store cum. site office.
Brick on edge Soling over ramp
S/F Sign board during construction of work
E/W in making Ramp
Earth work in making Road Diversion for V.R.B. Construction including all lead , lift ,proper disposal and labour and T&P etc.
Laying , cutting , bending and binding with binding wire excluding shuttering and centering, but including all materials, labour and T&P etc.
SHRI DINESH KUMAR
DEOMAN YADAV
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .