| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹29.8 LAdmitted-Fee/PreQual/Technical/Finance | -25.51% | ₹29.8 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹35.2 L+₹5.4 L (18.1%)Admitted-Fee/PreQual/Technical/Finance | -12.00% | ₹35.2 L+₹5.4 L (18.1%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | - | Not Admitted-Fee/PreQual/Technical/Finance Not qualified for AOC |
Tender Value
₹40.0 L
EMD Value
₹79,980
Closing Date
19 Aug 2026, 3:00 pmClosed
Xen IFC Sopore
Xen IFC Sopore
Seer Canal Construction of Lining Wall and Bed treatment from RD 4000 4200 and RD 9000 9200 MTRS (L 400MTRS)
2026_IFC_320853_3
enit.08.IFCD.SPR.2026.27
Open Tender
Civil Works
Percentage
485 days
Sopore
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,100
Chief Engineer IFC Dept Srinagar
₹79,980
25 Aug 2026
13 Aug 2026
20 Aug 2026
13 Aug 2026
19 Aug 2026
13 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in bulk excavation by Manual Means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil | 525.3 | Cum | 592.9 | ₹3,11,450.37 |
| 2 | Providing and laying Dry stone soling including cost of stones | 87.55 | Cum | 937.9 | ₹82,113.14 |
| 3 | Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with: 1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) | 51.5 | Cum | 5,202.9 | ₹2,67,949.35 |
| 4 | Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 273.98 | Cum | 7,104.35 | ₹19,46,449.81 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level Thermo-Mechanically Treated bars of grade Fe-500D or more. | 5,376.86 | Kg | 123.2 | ₹6,62,429.15 |
| 6Centering and shuttering including strutting, propping etc. and removal of form work for: | |||||
| 6.1 | Foundations, footings, bases for columns | 1,277.2 | Sqm | 286.35 | ₹3,65,726.22 |
| 7Carraige of Materials from souce to Road site of work by Mechanical transport including cost of loading, unloading and stacking etc | |||||
| 7.1 | Stone soiling for an avg lead of 10 kms | 87.55 | Cum | 328.31 | ₹28,743.54 |
| 7.2 | Stone Aggregate 40 mm for an avg lead of 30 kms | 46.35 | Cum | 565.64 | ₹26,217.41 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_1068092.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .