| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.3 CrAccepted-AOC | ₹64.3 Cr | L1 | Accepted-AOC First Lowest |
| 2 | L2₹65.6 Cr+₹1.3 Cr (2.08%)Rejected-AOC | ₹65.6 Cr+₹1.3 Cr (2.08%) | L2 | Rejected-AOC Second Lowest |
| 3 | L3₹68.9 Cr+₹4.6 Cr (7.16%)Rejected-AOC KANNUR | KERALA | 670001 | ₹68.9 Cr+₹4.6 Cr (7.16%) | L3 | Rejected-AOC Third Lowest |
| Sl No | Description | Qty | Unit | THE URALUNGAL LABOUR CONTRACT CO-OPERATIVE SOCIETY L3 | Baab Construction india Pvt Ltd L1 | M.Rajkumar civil Engineering private Ltd L2 |
|---|---|---|---|---|---|---|
| 1.00Appendix A - Drain, Culvert | ||||||
| 1.00 | 2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means | 221.57 | cum | 1,500 ₹3,32,359.5 Lowest | 1,700 ₹3,76,674.1 | 1,550 ₹3,43,438.15 |
| 1.00 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 1,566.79 | cum | 974 ₹15,26,053.46 | 825 ₹12,92,601.75 | 800 ₹12,53,432 Lowest |
| 1.00 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | 696.76 | cum | 920 ₹6,41,015.52 | 860 ₹5,99,210.16 | 800 ₹5,57,404.8 Lowest |
| 1.00 | 2.4.10.A:Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works - Up to 600 mm dia. | 16.8 | metre | 700 ₹11,760 | 680 ₹11,424 | 650 ₹10,920 Lowest |
| 1.00 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 24,862.39 | cum | 208 ₹51,71,376.29 | 85 ₹21,13,302.81 Lowest | 100 ₹24,86,238.6 |
| 1.01 | 12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M15 ( Without formwork) | 2,064 | cum | 7,500 ₹1,54,80,000 Lowest | 8,800 ₹1,81,63,200 | 8,300 ₹1,71,31,200 |
| 1.01 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 502.6 | cum | 7,600 ₹38,19,729.6 Lowest | 8,900 ₹44,73,104.4 | 9,000 ₹45,23,364 |
| 1.01 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | 2,100 | cum | 7,700 ₹1,61,70,000 | 7,600 ₹1,59,60,000 Lowest | 8,000 ₹1,68,00,000 |
| 1.01 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | 5,712 | cum | 9,500 ₹5,42,64,000 | 9,400 ₹5,36,92,800 Lowest | 11,000 ₹6,28,32,000 |
Tender Value
₹60.0 Cr
EMD Value
₹5 L
Closing Date
12 Nov 2025, 3:00 pmClosed
Project Director, PMU-KRFB, TVM
The Project Director, Kerala Road Fund Board, Project Management Unit, Ground Floor, BSNL Office Building at CGM(O), Doorsanchar Bhavan, PMG Junction Trivandrum 695033
Construction
2025_KRFB_816976_1
PWD/KR/TR/11470/2022_5_1_1/1
Open Tender
Civil Works - Roads
Item Rate
545 days
Thrissur
Please refer Tender documents.
8 documents required · 8 mandatory
₹19,518
Yes
₹5 L
Yes
Office of the Project Director, PMU-KRFB, TVM
15 Sept 2026
30 Oct 2025
14 Nov 2025
30 Oct 2025
12 Nov 2025
30 Oct 2025
5 Nov 2025
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Appendix A - Drain, Culvert | |||||
| 1.001 | 2.4.2.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Prestressed / reinforced cement concrete grade M-20 & above - By Mechanical Means | 0.2 | cum | - | - |
| 1.002 | 2.4.2.A:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Cement Concrete Grade M-15 & M-20 - By Mechanical Means | 1 | cum | - | - |
| 1.003 | 2.4.4.B:Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres Dismantling Stone Masonry - Rubble stone masonry in cement mortar. | 0.4 | cum | - | - |
| 1.004 | 2.4.10.A:Removing all type of Hume Pipes and Stacking within a lead of 1000 metres including Earthwork and Dismantling of Masonry Works - Up to 600 mm dia. | - | metre | - | - |
| 1.005 | 12.1.B.1:Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material. Ordinary Soil - Depth upto 3m - Mechanical Means | 0.4 | cum | - | - |
| 1.006 | 12.8.A:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications PCC Grade M15 ( Without formwork) | - | cum | - | - |
| 1.007 | 12.8.A.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. PCC Grade M15 | 0.4 | cum | - | - |
| 1.008 | 12.4:Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. | - | cum | - | - |
| 1.009 | 12.8.1.C.1:Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications RCC Grade M20 - Using Concrete Mixer | - | cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.05 MB
BOQ_1368651.xls
BOQ • 0.45 MB
Requisitionfore-payment.pdf
Additional Documents • 0.10 MB
SBD.pdf
Tender Documents • 2.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .