| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.8 LAccepted-Finance | ₹6.8 L | L1 | Accepted-Finance Lowest Bidder |
| 2 | L2₹7.6 L+₹74,075.28 (10.8%)Rejected-Finance | ₹7.6 L+₹74,075.28 (10.8%) | L2 | Rejected-Finance Disqualified |
| 3 | L3₹7.9 L+₹1.1 L (16.0%)Rejected-Finance | ₹7.9 L+₹1.1 L (16.0%) | L3 | Rejected-Finance Disqualified |
| 4 | L4₹8.5 L+₹1.6 L (23.7%)Rejected-Finance | ₹8.5 L+₹1.6 L (23.7%) | L4 | Rejected-Finance Disqualified |
| 5 | Rejected-Technical | - | - | Rejected-Technical Insufficient ITR. Hence rejected |
Tender Value
₹9.1 L
EMD Value
₹18,268
Closing Date
25 Jul 2026, 12:30 pmClosed
Executive Engineer
Jalpaiguri Construction Division
Repair and renovation of office of the District Land and Land Reforms Officer, Jalpaiguri
2026_WBPWD_5016280_1
WBPWD/EE/JCD NIeT No 04 of 2026-27, (Sl No- 01 and 02)
Open Tender
CIVIL WORKS
Percentage
75 days
Jalpaiguri
Please refer tender details
5 documents required · 5 mandatory
₹18,268
Yes
25 Aug 2026
6 Jul 2026
27 Jul 2026
6 Jul 2026
25 Jul 2026
6 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches, levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 1 | %M3 | 11,927 | ₹11,915.07 |
| 2 | (A) Filling in foundation or plinth by fine sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity) | - | %M3 | 75,394 | - |
| 3 | Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. In ground floor including roof. (a) upto 150 mm. thick | 1 | M3 | 939 | ₹938.91 |
| 4 | Supplying and laying Polythene Sheet (150gm / sq.m.) over damp proof course or below flooring or roof terracing or in foundation or in foundation trenches. | - | M2 | 24 | - |
| 5 | Ordinary Cement concrete (mix 1:2:4) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement,if any, in ground floor as per relevant IS codes.
a) Pakur Variety | 1 | M3 | 5,385.38 | ₹5,379.99 |
| 6 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.
(i) Pakur Variety. Ground Floor | - | M3 | 5,895.68 | - |
| 6.01 | 1st Floor | 1 | M3 | 5,990.68 | ₹5,984.69 |
| 7 | Hire and labour charges for shuttering with centreing and necessary staging upto 4 m. using approved stout props and thick hard wood planks of approved thickness with required bracing for concrete slabs, beams, columns, lintels curved or straight including fitting, fixing and striking out after completion of works. (upto roof of ground floor).
(c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work. Ground Floor | - | M2 | 363 | - |
| 7.01 | c) Steel shuttering or 9 to 12 mm thick approved quality ply board shuttering in any concrete work. First Floor | 1 | M2 | 381 | ₹380.62 |
| 8 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m (ii) Tor steel/ Mild SteelI. JSW / JSPL / SHYAM....etc. | - | MT | 58,524.55 | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.31 MB
WBF2911.pdf
Tender Documents • 0.80 MB
BOQ_5085619.xls
BOQ • 0.36 MB
2ndDateCorrigendumSL01.pdf
PDF • 0.82 MB
1stDateCorrigendum.pdf
PDF • 0.65 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .