Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.6 LAccepted-AOC | ₹9.6 L | L1 | Accepted-AOC L1 |
| 2 | L2₹10.6 LRejected-Finance | ₹10.6 L | L2 | Rejected-Finance L2 |
| Sl No | Description | Qty | Unit | SURESH KUMAR.M L1 | BABU L2 |
|---|---|---|---|---|---|
| 1.00APPENDIX-I | |||||
| 1.00 | 15.1:Demolishing lime concrete manually / by mechanical means and disposal of material within 50 metres lead as per direction of Engineer - in- Charge. | 1.43 | cum | 890.83 ₹1,273 | 899.83 ₹1,285.86 |
| 1.00 | 14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand) | 121.8 | sqm | 586.69 ₹71,458.84 | 650 ₹79,170 |
| 1.00 | 13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand) | 1,833.6 | sqm | 389.9 ₹7.1 L | 420 ₹7.7 L |
| 1.00 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 103.2 | sqm | 405.28 ₹41,824.90 | 450 ₹46,440 |
| 1.00 | 50.4.1.1:Providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc. | 2.67 | cum | 9,248.32 ₹24,693.01 | 9,341.74 ₹24,942.45 |
| 1.01 | 4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 4.4 | cum | 9,346.81 ₹41,125.96 | 9,441.22 ₹41,541.37 |
| 1.01 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 22 | sqm | 390.79 ₹8,597.38 | 450 ₹9,900 |
| 1.01 | OD24193/2023-2024:Providing and fixing single scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done . | 420 | sqm | 144.66 ₹60,757.20 | 200 ₹84,000 |
Tender Value
₹9.7 L
EMD Value
₹24,360
Closing Date
7 Feb 2026, 11:00 amClosed
Assistant Executive Engineer
Assistant Executive Engineer O/o the Assistant Executive Engineer, PWD Buildings Sub division, PMG, Thiruvananthapuram. Thiruvananthapuram Pin- 695033
DEPOSIT-Urgent maintenance work of compound wall at central prison Poojappura Thiruvananthapuram-Urgent maintenance work of compound wall at central prison Poojappura Thiruvananthapuram-General Civil Work
2026_PWD_830871_1
PWD/BLDG/TR/8398/2023_5_1_1/1
Open Tender
Civil Works - Buildings
90 days
Thiruvananthapuram
Please refer Tender documents.
8 documents required · 8 mandatory
₹2,150
Yes
₹24,360
Yes
12 Mar 2026
27 Jan 2026
9 Feb 2026
27 Jan 2026
7 Feb 2026
27 Jan 2026
APPENDIX-I
15.1:Demolishing lime concrete manually / by mechanical means and disposal of material within 50 metres lead as per direction of Engineer - in- Charge.
14.1.1:Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 meters lead:With cement mortar 1:4 ( 1 cement : fine sand)
13.4.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 coarse sand)
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
50.4.1.1:Providing and laying in position cement concrete 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 12.5 mm nominal size) up to floor five level excluding the cost of centering, shuttering, finishing for leveling coarse of floor and roof etc.
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III)derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources)
5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete
OD24193/2023-2024:Providing and fixing single scaffolding system (cup lock type) on the exterior side, upto seven story hight made with 40 mm dia. M.S. tube 1.5 m centre to centre, horizontal & vertical tubes joining with cup & lock system with M.S. tubes, M.S. tube challies, M.S. clamps and M.S. staricase system in the scaffolding for working platform etc. and maintaining it in a serviceable condition for the required duration as approved and removing it there after. The scaffolding system shall be stiffened with bracings, runners, connection with the building etc wherever required for inspection of work at required location with essential safety features for the workmen etc. complete as per directions and approval of Engineer- in Charge. The elevational area of the scaffolding shall be measured for payment purpose. The payment will be made once irrespective of duration of scaffolding. Note:- This item to be used for maintenance work judicially, necessary deduction for scaffolding in the existing item to be done .
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1395978.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
epayment.pdf
Tender Documents • 0.05 MB
BOQ_1395978.xls
BOQ • 0.30 MB
SBD.pdf
Tender Documents • 1.64 MB
PreliminaryAgreement.pdf
Tender Documents • 0.03 MB
declaration.pdf
Tender Documents • 0.00 MB
form_of_tender.pdf
Tender Documents • 0.18 MB
integrity_pact.pdf
Tender Documents • 0.05 MB
Download all tender documents and submit your bid