Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹92.1 LAdmitted-Finance | -30.65% | ₹92.1 L | L1 | Admitted-Finance |
| 2 | L2₹1.0 CrAdmitted-Finance | -24.27% | ₹1.0 Cr | L2 | Admitted-Finance |
| 3 | L3₹1.0 CrAdmitted-Finance | -21.08% | ₹1.0 Cr | L3 | Admitted-Finance |
| 4 | L4₹1.1 CrAdmitted-Finance | -16.86% | ₹1.1 Cr | L4 | Admitted-Finance |
| 5 | L5₹1.3 CrAdmitted-Finance | -0.10% | ₹1.3 Cr | L5 | Admitted-Finance |
Tender Value
₹1.3 Cr
EMD Value
₹2.7 L
Closing Date
4 May 2026, 6:00 pmClosed
commissioner
nagar nigam kota
bandha palace shwanshala cenal banae ka work 3 nit 01
2026_DLB_550601_3
NNK/CIVIL/2026-27/1-12 nit 01
Open Tender
Civil Works
180 days
kota
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,500
commissioner
₹2.7 L
Yes
25 May 2026
13 Apr 2026
6 May 2026
13 Apr 2026
4 May 2026
13 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1WORK NAME | ||||||
| 1.01 | Earth work in excavation for roadway, including trimming bottom and side slopes in accordance with requirement of line, grades and cross sections, including disposal of surplus material with all lift and lead upto 1000 metre as per MoRT&H specification clause 301. | - | Cum | - | - | 2 |
| 1.02 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level :1:3:6 (1 Cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size). | - | Cum | - | - | 3 |
| 1.03 | Random rubble masonry with hard stone in foundation and plinth : Cement mortar 1:6 (1 cement : 6 coarse sand) | - | Cum | - | - | 4 |
| 1.04 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers. | - | Sqm | - | - | 5 |
| 1.05 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete Cold twisted bars | - | Kg | - | - | 6 |
| 1.06 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level : 1:1½:3 (1 Cement : 1½ coarse sand : 3 graded stone aggregate 20 mm nominal size). | - | Cum | - | - | 7 |
| 1.07 | Brick work with FPS bricks of class designation 75 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand) | - | Cum | - | - | 8 |
| 1.08 | Centring and shuttering with plywood or steel sheet upto two stories ( each story of height upto 3.5 metre from floor level) including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers. | - | Sqm | - | - | 9 |
| 1.09 | Reinforcement for R.C.C. work at all levels including straightening, cutting, bending, placing in position and binding all complete Cold twisted bars | - | Kg | - | - | 10 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.80 MB
BOQ_981349.xls
BOQ • 0.45 MB
1003.pdf
Tender Documents • 0.48 MB
Download all tender documents and submit your bid