| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹26.9 LAccepted-AOC CHANDRAVILASAM PANACHIKKADU P O KOTTAYAM | KOTTAYAM | KOTTAYAM | KERALA | L1 | Accepted-AOC L1 | |
| 2 | L2₹29.0 L+₹1.6 L (5.82%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹29.4 L+₹2.0 L (7.44%)Rejected-AOC | L3 | Rejected-AOC L3 | |
| 4 | L4₹29.4 L+₹2.1 L (7.52%)Rejected-AOC | L4 | Rejected-AOC L4 | |
| 5 | Rejected-Technical | - | Rejected-Technical Not Qualify the Techncial Bid |
Tender Value
₹30.1 L
EMD Value
₹60,300
Closing Date
21 Jul 2022, 3:00 pmClosed
The Registrar, NUALS
NUALS Campus HMT Colony Kalmassery
Re-construction of Compound Wall in NUALS Campus
2022_NUALS_498599_1
NUALS/ENGG/A4/2369-A/01/2022
Open Tender
Civil Works - Buildings
Item Rate
90 days
NUALS Campus
Please refer Tender documents.
5 documents required · 5 mandatory
₹2,800
Yes
₹60,300
Yes
25 Oct 2022
8 Jul 2022
22 Jul 2022
8 Jul 2022
21 Jul 2022
8 Jul 2022
Amount
Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge. In cement mortar
Centering and shuttering including strutting, etc. and removal of form for:Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc.
Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete above plinth level.Thermo - Mechanically Treated bars of grade Fe-500D or more
Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size
Random rubble masonry with hard stone in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level with:Cement mortar 1:6 (1 cement : 6 coarse sand)
Solid block masonry using pre cast solid blocks (Factory made) of size 30x20x20cm or nearest available size confirming to IS 2185 part I of 1979 for foundation and plinth with thickness 20cm and above in: CM 1:6 ( 1 cement : 6 coarse sand ) etc complete
12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand)
Supplying at site Angle iron post & strut of required size including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.
Providing and fixing concertina coil fencing with punched tape concertina coil 600 mm dia 10 metre openable length (total length 90 m) , having 50 nos rounds per 6 metre length, upto 3 m height of wallwith existing angle iron 'Y' shaped placed 2.4 m or 3.00 apart and with 9 horizontal R.B.T. reinforced barbed wire, stud tied with G.I. staples and G.I. clips to retain horizontal, including necessary bolts or G.I. barbed wire tied to angel iron, all complete as per direction of Engineer- in-charge, with reinforced barbed tape (R.B.T.) / Spring core (2.5 mm thick) wire of high tensile strength of 165 kg/ sq mm with tape (0.52 mm thick) and weight 43.478 gm/ metre (cost of M.S. angle, C.C. blocks shall be paid separately)
Finishing walls with Acrylic Smooth exterior paint of required shade:New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
CROWNFAB
MUHAMMED SIRAJUDHEEN M
JOSEPHNELSON
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .