| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.7 LAccepted-AOC | ₹13.7 L | L1 | Accepted-AOC L1 bidder |
| 2 | L2₹14.1 L+₹41,617.21 (3.03%)Rejected-AOC | ₹14.1 L+₹41,617.21 (3.03%) | L2 | Rejected-AOC L2 bidder |
| Sl No | Description | Qty | Unit | ANAS A N L1 | ROJIN G RAJ L2 |
|---|---|---|---|---|---|
| 1.00 | Quoted Amount of BOQ1 in figures | 1 | Nos | 13,73,368.05 ₹13,73,368.05 Lowest | 14,14,985 ₹14,14,985.26 |
| 2.00 | GST Rate in percentage | 1 | Nos | 18 ₹2,47,206.25 Lowest | 18 ₹2,54,697.35 |
Tender Value
₹13.9 L
EMD Value
₹34,700
Closing Date
16 Jun 2026, 5:00 pmClosed
Assistant Executive Engineer
Office of the Assistant Executive Engineer Transmission sub division Paruthippara
Trans-Grid downstream work-Bay Extension of 110 KV Substation, Medical College- Providing Yard Metalling and Fencing
2026_KSEB_853589_1
AEE(P)07/TSD-PPRA/2026-27/dtd 01.06.26
Open Tender
Civil Works - Others
Percentage
120 days
110 kV Substation Medical collage
Please refer Tender documents.
5 documents required · 5 mandatory
₹5,900
₹34,700
27 Jul 2026
2 Jun 2026
19 Jun 2026
2 Jun 2026
16 Jun 2026
2 Jun 2026
2 Jun 2026 - 16 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Surface dressing of the ground including removing vegetation and in-equalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m.All kinds of soil | 300 | m2 | 0.2 | ₹60 |
| 2 | Excavating earth work by mechanical means (Hydraulic excavator) / manual means on foundation trenches of drains ( not exceeding 1.5 m in width or 10 m2 on plan,)including dressing of sides and ramming of bottom ,lift up to 1.5 m , including getting out the excavated soil and disposal of surplus excavated soils as directed, within a lead of 50 m. in all kinds of soil. | 17 | m3 | - | - |
| 3 | Providing and laying in position 1 :4: 8 cement concrete using aggregate 40 mm normal size stone, excluding the cost of centering, shuttering, finishing and reinforcement all works as per the direction of department staff at site. | 3.87 | m3 | 0.44 | ₹1.7 |
| 4 | Centering and shuttering including strutting, etc. and removal of form for: Foundations, footings, bases of columns, etc for mass concrete. | 41.5 | m2 | 0.8 | ₹33.2 |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level: 1:2:4 ( 1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) | 17 | m3 | 0.12 | ₹2.04 |
| 6 | 12 mm cement plaster of mix: 1:4 ( 1 cement : 4 fine sand) | 60 | m2 | 0.64 | ₹38.39 |
| 7 | Supplying laying, cutting, and jointing pushed type PVC pipe 50mm 6kgf and specials such as Tees, bends, elbows, etc., complete including trenching to a minimum depth of 0.5m, etc., and refilling complete as per the direction of dept. Staff at the site. | 40 | m | 0.04 | ₹1.6 |
| 8 | Supplying laying, cutting, and jointing pushed type PVC pipe 80mm 6kgf and specials such as Tees, bends, elbows, etc., complete including trenching to a minimum depth of 0.5m, etc., and refilling complete as per the direction of dept. Staff at the site. | 60 | m | 0.32 | ₹19.2 |
| 9 | Supplying, laying, cutting, and jointing pushed type PVC pipe 100mm 6kgf and specials such as Tees, bends, elbows, etc., complete including trenching to a minimum depth of 0.5m, etc., and refilling complete as per the direction of dept. Staff at the site | 80 | m | 0.32 | ₹25.6 |
| 10 | Structural steel work Fabricating and fixing Angle iron post & strut of required size@ 2.50m c/c 30cm embeded in the concrete to fix firmly for fencing including bottom to be split and bent at right angle in opposite direction for 10 cm length and drilling holes upto 10 mm dia. etc. complete.(Materials will be supplied by the Department free of cost) | 575 | kg | 0.2 | ₹114.94 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.36 MB
Tendernotice_2.pdf
PDF • 0.81 MB
BOQ_1442696.xls
BOQ • 0.31 MB
corrigendum-2.pdf
PDF • 0.38 MB
corrigendum.pdf
PDF • 0.38 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .