| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹88.3 LAccepted-AOC | ₹88.3 L Quoted ₹88.6 L | 1 | Accepted-AOC L1 Bidder |
| 2 | 2₹88.6 LSame as 1Rejected-Finance 610 PP TOWERS C 1 2 3 NETAJI SUBHASH PLACE PITAMPURA NORTH WEST DELHI DELHI 110034 | NORTH WEST DELHI | DELHI | 110034 | ₹88.6 LSame as 1 | 2 | Rejected-Finance Non L1 Bidder |
| 3 | 3₹1.4 Cr+₹48.0 L (54.1%)Rejected-Finance OLYMPIA PLATINA PLOT NO 33B SOUTH PHASE GUINDY CHENNAI 600032 | CHENNAI | CHENNAI | TAMIL NADU | 600032 | ₹1.4 Cr+₹48.0 L (54.1%) | 3 | Rejected-Finance Non L1 Bidder |
Tender Value
Refer Docs
Closing Date
15 Nov 2021, 2:30 pmClosed
LS NAGI
Technip India Limited,Technip Tower,A-4,Sector-1 Noida-201301,India
Design, Engineering, manufacturing, procurement of materials and bought out components, assembly at shop, Inspection including inspection by TPIA, Testing at manufacturers works, packing, supply of HVAC SYSTEM
2021_REFHQ_141018_1
TP/81757C001/RFCC/3400-01/1072
Limited
Mechanical - All
Supply
210 days
Refer Tender Details
Refer Tender Details
6 documents required · 6 mandatory
Exempted
28 Feb 2024
20 Sept 2021
17 Nov 2021
20 Sept 2021
15 Nov 2021
6 Oct 2021
21 Sept 2021 - 5 Oct 2021
Amount
HVAC SYSTEM
HVAC SYSTEM FOR VFD SUBSTATION , details as per material requisition,inculding installation, erection & commissioing spares, excluding Mandatory Spares. Mandatory Spares prices to put in 1.02
Mandatory Spares for item no 1.01, details as per material requisition.
Site Work- Installation, Testing, Pre-commissioning and commissioning , Scope details as per material requisition.
Unit rate for Supervision of erection and commissioning as per enclosed instructions to vendor Per Diem charges upto 8 hrs on normal working days. (BIDDERS TO QUOTE UNIT RATE FOR DIEM CHARGES )
Unit rate for Supervision of erection and commissioning as per enclosed instructions to vendor Overtime rate per hour (beyond normal 8 hours on normal working days). (BIDDERS TO QUOTE OVER TIME RATE PER HOUR )
Unit rate for Supervision of erection and commissioning as per enclosed instructions to vendor Overtime rate per hour for work on weekly off days / holidays (as applicable to Refinery Site). (BIDDERS TO QUOTE OVER TIME RATE PER HOUR )
Description of Work / Item(s)
Amount
Two ( 2 )Years Recommended Operational & maintenance Spares
2 years Normal operational & maintenance spares (as per vendor recommendation) - Spare no. - 4.01 ( Details to be furnish in UnPrice Schedule)
Spare no. -4.02
Spare no. - 4.03
Spare no. -4.04
Spare no. - 4.05
Spare no. -4.06
Spare no. - 4.07
Spare no. -4.08
Spare no. - 4.09
Spare no. -4.10
Spare no. - 4.11
Spare no. -4.12
Spare no. - 4.13
Spare no. -4.14
Spare no. - 4.15
Spare no. -4.16
Spare no. - 4.17
Spare no. -4.18
Spare no. - 4.19
Spare no. -4.20
AIR PERFECTION
VERTIV ENERGY PRIVATE LIMITED
AIR PERFECTION
VERTIV ENERGY PRIVATE LIMITED
AIR PERFECTION
VERTIV ENERGY PRIVATE LIMITED
AIR PERFECTION
VERTIV ENERGY PRIVATE LIMITED
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .