| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 LAccepted-Finance | L1 | Accepted-Finance Ok | |
| 2 | L2₹2.0 L+₹5,980 (3.08%)Accepted-Finance | L2 | Accepted-Finance Ok | |
| 3 | L3₹2 L+₹6,000 (3.09%)Accepted-Finance GURU RAM DAS NAGAR SRI SAI VIHAR COLONY ALIGARH ALIGARH ALIGARH UTTAR PRADESH 202001 | ALIGARH | UTTAR PRADESH | 202001 | L3 | Accepted-Finance Ok |
Tender Value
₹2.0 L
EMD Value
₹2,000
Closing Date
6 Apr 2024, 12:00 pmClosed
Executive Engineer
ETD, Firozabad
REPLACEMENT OF SCACA SYSTEM AND INTREGRATION OF 33KV FEEDER
2024_UPTCL_920149_1
ET-17/ETD-203-24
Open Tender
Repair and Maintenance Services
Lump-sum
30 days
ETD
Please refer Tender documents.
2 documents required · 2 mandatory
₹590
Yes
.
₹2,000
Yes
20 Apr 2024
23 Mar 2024
6 Apr 2024
23 Mar 2024
6 Apr 2024
23 Mar 2024
23 Mar 2024 - 6 Apr 2024
Inspection and rectification of GE/Alstom make Substation Automation System, installed at 132KV Substation, Tundla The following works are including for healthy SCADA communication. Rectification of BCU's relays comunication and it's ICD files for healthy communications with SCADA, restoring the rectified Backup files of SCADA, checking the data healthyness at local SCADA. Replacing the defective FO multimod patch cords. Checking & Rectifying the healthiness of LIUJs and its communicating ports. Checking the healthiness of IEC 61850-7 Ethernet switches. Replacing the defective if any CAT-5/LAN cables and checking its healthiness. . Re-installation of old backup to SCADA if required, Checking the healthiness of all protection relay's communication to SCADA. Checking of all required events, alarms, numericals datas, status and signals to SCADA from various bays & feeders. Checking the SLD of S/S to SCADA screen checking the all required operations o equipments from SCADA if required. At the time of rectification all requred materials and computer parts will be arranged by department without extra charges, except the following given material will be provided by contractor.scada license key, activation key, old sas backup, and software CD will be provided by department.
IEC 61850 based SCADA configuration and its integration with 33 KV Industrial Bay work at 132 KV S/S, Tundla includes as SLD generation for feeder bay in existing HMI, bay IED'S ICD files configuration, database creation for newly bay, event ,alarm generation , interlocks and soft logics configuration and testing i any , GPS time synchronisation ETC.
SHILPA ENTERPRISES
AR Electricals & Hardware
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .