Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.0 LAccepted-AOC | ₹1.0 L Quoted ₹1.1 L | L1 | Accepted-AOC L1 |
| 2 | L2₹1.1 LRejected-AOC | ₹1.1 L | L2 | Rejected-AOC L2 |
| Sl No | Description | Qty | Unit | T G GIREESAN L2 | SULFEKAR K A L1 |
|---|---|---|---|---|---|
| 1.00Pre monsoon | |||||
| 1.00 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | 5 | each | 2,527.95 ₹12,639.75 | 2,454.32 ₹12,271.60 |
| 1.00 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | 56 | each | 388.98 ₹21,782.88 | 377.65 ₹21,148.40 |
| 1.00 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | 6 | each | 696.26 ₹4,177.56 | 675.98 ₹4,055.88 |
| 1.00 | OD3190/2026-2027:Cutting timber logs / bamboos using machine saw and removing by engaging man mazdoor using ropes, pulley etc as per the direction of the departmental officers at site | 4 | Day | 9,399.46 ₹37,597.84 | 9,125.69 ₹36,502.76 |
| 1.00 | OD3191/2026-2027:Engaging man mazdoor for removal of tree branches from river | 23 | each | 1,114.65 ₹25,636.95 | 1,082.18 ₹24,890.14 |
| 1.01 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | 27 | cum | 265.36 ₹7,164.72 | 257.63 ₹6,956.01 |
Tender Value
₹1.1 L
EMD Value
₹2,646
Closing Date
28 May 2026, 5:00 pmClosed
Assistant Executive Engineer
Assistant Executive Engineer Irrigation Sub division Kaduthuruthy
Urgent removal of obstruction in Muvattupuzha river and its tributary
2026_Irrig_852593_1
IRR/IA/TR/2698/2026_5_1_1/1
Open Tender
Civil Works - Others
180 days
Muvattupuzha river and its tributary in Vaikom Con
Please refer tender documents
9 documents required · 9 mandatory
₹555
Yes
₹2,646
Yes
18 Jun 2026
23 May 2026
30 May 2026
23 May 2026
28 May 2026
23 May 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Pre monsoon | ||||||
| 1.001 | 2.33.2:Felling trees of the girth (measured at a height of 1 m above ground level) including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceable material.Beyound 60 cm girth up to and including 120 cm girth | - | each | - | - | BI01010001010000000000000515BI0100001114 |
| 1.002 | 50.2.33.5:Cutting branches of trees overhanging above any structures of girth between 40cm to 60cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete. | - | each | - | - | BI01010001010000000000000515BI0100001115 |
| 1.003 | 50.2.33.6:Cutting branches of trees overhanging above any structures of girth between 60cm to 90cm including stacking of serviceable materials and disposal of unserviceable material, cost of labour, hire charges of rope and pully etc without making any damages to nearby structures etc complete | - | each | - | - | BI01010001010000000000000515BI0100001116 |
| 1.004 | OD3190/2026-2027:Cutting timber logs / bamboos using machine saw and removing by engaging man mazdoor using ropes, pulley etc as per the direction of the departmental officers at site | - | Day | - | - | BI01010001010000000000000515BI0100001117 |
| 1.005 | OD3191/2026-2027:Engaging man mazdoor for removal of tree branches from river | - | each | - | - | BI01010001010000000000000515BI0100001118 |
| 1.006 | 2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil | - | cum | - | - | BI01010001010000000000000515BI0100001119 |
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1440634.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.05 MB
Tendernotice_2.pdf
PDF • 1.65 MB
Tendernotice_3.pdf
PDF • 0.27 MB
Tendernotice_4.pdf
PDF • 0.02 MB
Tendernotice_5.pdf
PDF • 0.04 MB
Tendernotice_6.pdf
PDF • 0.07 MB
Tendernotice_7.pdf
PDF • 0.47 MB
BOQ_1440634.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid