| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹33.9 LAccepted-Finance INFRA HOUSE CHURCH ROAD PALLINADA ERNAKULAM KERALA 682025 UDYAM KL 02 0011820 32AABCI6608Q1ZB R M MII STATUS AS NOT VERIFIED | ERNAKULAM | KERALA | 682025 | ₹33.9 L | L1 | Accepted-Finance Lowest Bidder |
| 2 | L2₹34.2 LAccepted-Finance 5TH FLOOR DP 9 P T I BLDG SALT LAKE SALT LAKE KOLKATA WEST BENGAL 700091 | KOLKATA | KOLKATA | WEST BENGAL | 700091 | ₹34.2 L | L2 | Accepted-Finance Second Lowest bidder |
| Sl No | Description | Qty | Unit | KONE Elevator India Private Ltd L2 | INFRA ELEVATORS INDIA PVT LTD L1 |
|---|---|---|---|---|---|
| 1.00ELECTRICAL LIFT WORK | |||||
| 1.00 | OD279771/2025-2026:Supply, Installation,Testing and Commissioning of 13 passenger gearless lift
machine room less with the following specification including all required standard
features.
1 .Type of Lift:13 Passenger capacity , Gearless
2. Load / Persons :884 Kg./ 13persons
3 .Rated speed :1 M/Sec.
4. Travel : 6Mtr ( Approx)
5. No. of floorand entrance served: 2 stops and 2 openings
6. No. of floor served :Two floors
7.Method of control :Micro processor based V3F with ARD system.
8. Size of lift well:2200 mm X 2000 mm
9. Car entrance: As per IS.
10.Leveling accuracy : As per IS
11. Car door opening : As per IS
12. Drive : Variable voltage variablefrequency(V3F)
13 .Operation : Simplex full selective collective control withON/OFF switch
14. Construction of design and furnishing of car body work: Vandal
proof Stainless steel(SS304,make:Tata/Jindal) finish cabinet with Scratch proof
Stainless steel door(sheet minimum1mm thickness), Stainless steel mirror finish
ceiling, Aluminium chequered plate 3mm minimum thickness anti skid flooring, fan with timer cutoff,push to talk, LED display, LED light, hand rails and floor announcement system.All buttons in car and all landings should have Braille sign.
15. Landing entrance :Automatic centre/Telescopic opening Vandal proof stainless steel sliding door as perISS with provision for mechanical opening key for emergency with full length multi beam infrared light curtains.The Upper half of the door shall have glass vision panel using laminated safety glass.
16. Call and position indicators :Up/down direction & position Dot Matrix LED indication shall be provided atall landings
17. Electric supply : 1) Light 230/50C/s single phase 2 wire system. 2)415V 50C/s 3 phase 4 wire system.
18. Infra red door opening system: To be providefor entire length of the door
19. Automatic Rescue Device :Provide automatic rescuedevice with an electronic controller powered by maintenance free batteries withcapacity for minimum four rescue operation at full load . The rescue operation shouldact within 10 seconds of power failure
20. Regulation :350V- 450V (SMPS based)
21.Indication in the car : a) Car position b) Call indicator c) Door close/open push button
d) Emergency stop button e) push button switch for fan and light f) Non stop button
g) Battery operated emergency lamp with rechargeable batteries. h) Battery operated
alarm bell i) Intercom wiring with one master unit with two slaves j) Fireman’s
switch at main lobby i) Auto attendant control (inside the car)
22. Winding handle :Manual winding handle for use in emergency.
23. Safeties a) Bi directional Over speed governoroperated safety gear b) Buffers c) Motor over load and under voltage protection d)Phase reversal protection e) Other safeties as per ISS f) Single phase preventer g)Final limit switch
24. Levelling Automatic levelling at all landing as per IS.
25.Control panel :Control panel will be dust and vermin proof of sheet metal enclosure
26. Announcement System: To provide lift announcement system
27. Tests :At sitetest as per IS to be carried out and approval from Electrical Inspectorate to be obtained beforeHanding over.
28. Scope of work:- a) Supply of lift materials b)Minor civil workssuch asconstruction of buffer block in the pit, machine foundation in the machine room,necessary core cutting , cutting pockets and grounding brackets for the guide rails,grouting boxes for control units, c) Scaffolding d) Door frames e) Supporting steel f) Temporary electricsupply for installation of lift. Electric supply for testing and commissioning of lift isto be arranged by the firm on their own account. g) Intercom facilities with onemaster and two slaves h) Battery operated alarm i) Obtaining Scheme approval as well as License to operate the lift from the electrical Inspectorate including preparationof necessary drawing for the same. inclusive of necessary fee for 3 years to the Inspectorate andfirst year insurance as per new lift rule by the firm for which no refund will be madefrom the department j)Supply of book let with complete details of maintenance schedule and controldiagram. k) Giving training to department staff for attending trouble shooting
29.Guarantee: Company shall carry out free maintenance and service during warranty
Period ie 3years from the date of handing over, which also includes a) Cleaning lift equipment b) Lubrication of all movingparts c) Replacing of lubricating oil when required d) Checking and adjustingcontacts e) Replacing fusible item alarm etc. f) Recharging batteries in case of drain/renewing batteries g ) Replacing /rewinding of all defective parts of the lift including rope,motors and V3F unit etc h) Attending breakdown call within 3hrs | 1 | each | 16,64,000 ₹16.6 L | 15,44,000 ₹15.4 L |
| 1.00 | OD279893/2025-2026:Supply, Installation,Testing and Commissioning of 13 passenger gearless lift
machine room less with the following specification including all required standard
features.
1 .Type of Lift:13 Passenger capacity , Gearless
2. Load / Persons :884 Kg./ 13persons
3 .Rated speed :1 M/Sec.
4. Travel : 8Mtr ( Approx)
5. No. of floor and entrance served: 3 stops and 3 openings
6. No. of floor served :Three floors
7.Method of control :Micro processor based V3F with ARD system.
8. Size of lift well:2200 mm X 2000 mm
9. Car entrance: As per IS.
10.Leveling accuracy : As per IS
11. Car door opening : As per IS
12. Drive : Variable voltage variablefrequency(V3F)
13 .Operation : Simplex full selective collective control withON/OFF switch
14. Construction of design and furnishing of car body work: Vandal
proof Stainless steel(SS304,make:Tata/Jindal) finish cabinet with Scratch proof
Stainless steel door(sheet minimum1mm thickness), Stainless steel mirror finish
ceiling, Aluminium chequered plate 3mm minimum thickness anti skid flooring, fan with timer cutoff,push to talk, LED display, LED light, hand rails and floor announcement system.All buttons in car and all landings should have Braille sign.
15. Landing entrance :Automatic centre/Telescopic opening Vandal proof stainless steel sliding door as perISS with provision for mechanical opening key for emergency with full length multi beam infrared light curtains.The Upper half of the door shall have glass vision panel using laminated safety glass.
16. Call and position indicators :Up/down direction & position Dot Matrix LED indication shall be provided atall landings
17. Electric supply : 1) Light 230/50C/s single phase 2 wire system. 2)415V 50C/s 3 phase 4 wire system.
18. Infra red door opening system: To be providefor entire length of the door
19. Automatic Rescue Device :Provide automatic rescuedevice with an electronic controller powered by maintenance free batteries withcapacity for minimum four rescue operation at full load . The rescue operation shouldact within 10 seconds of power failure
20. Regulation :350V- 450V (SMPS based)
21.Indication in the car : a) Car position b) Call indicator c) Door close/open push button
d) Emergency stop button e) push button switch for fan and light f) Non stop button
g) Battery operated emergency lamp with rechargeable batteries. h) Battery operated
alarm bell i) Intercom wiring with one master unit with two slaves j) Fireman’s
switch at main lobby i) Auto attendant control (inside the car)
22. Winding handle :Manual winding handle for use in emergency.
23. Safeties a) Bi directional Over speed governoroperated safety gear b) Buffers c) Motor over load and under voltage protection d)Phase reversal protection e) Other safeties as per ISS f) Single phase preventer g)Final limit switch
24. Levelling Automatic levelling at all landing as per IS.
25.Control panel :Control panel will be dust and vermin proof of sheet metal enclosure
26. Announcement System: To provide lift announcement system
27. Tests :At sitetest as per IS to be carried out and approval from Electrical Inspectorate to be obtained beforeHanding over.
28. Scope of work:- a) Supply of lift materials b)Minor civil workssuch asconstruction of buffer block in the pit, machine foundation in the machine room,necessary core cutting , cutting pockets and grounding brackets for the guide rails,grouting boxes for control units, c) Scaffolding d) Door frames e) Supporting steel f) Temporary electricsupply for installation of lift. Electric supply for testing and commissioning of lift isto be arranged by the firm on their own account. g) Intercom facilities with onemaster and two slaves h) Battery operated alarm i) Obtaining Scheme approval as well as License to operate the lift from the electrical Inspectorate including preparationof necessary drawing for the same. inclusive of necessary fee for 3 years to the Inspectorate andfirst year insurance as per new lift rule by the firm for which no refund will be madefrom the department j)Supply of book let with complete details of maintenance schedule and controldiagram. k) Giving training to department staff for attending trouble shooting
29.Guarantee: Company shall carry out free maintenance and service during warranty
Period ie 3years from the date of handing over, which also includes a) Cleaning lift equipment b) Lubrication of all movingparts c) Replacing of lubricating oil when required d) Checking and adjustingcontacts e) Replacing fusible item alarm etc. f) Recharging batteries in case of drain/renewing batteries g ) Replacing /rewinding of all defective parts of the lift including rope,motors and V3F unit etc h) Attending breakdown call within 3hrs | 1 | each | 17,54,000 ₹17.5 L | 18,44,000 ₹18.4 L |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
5 Mar 2026, 6:00 pmClosed
Executive Engineer
Executive Engineer PWD Electrical Division Thrissur
DEPOSIT Collegiate Education Department Barrier free Campus Providing Lift facilities to Main Block and New Academic Block at Govt College Chittur SITC of 2Nos Lifts Electrical Lift Work
2026_PWD_841399_1
PWD/BLDG/18399/2025-2026
Open Tender
Electrical Works
300 days
Chittur
Please refer Tender documents.
9 documents required · 9 mandatory
₹2,760
₹50,000
5 Jun 2026
27 Feb 2026
7 Mar 2026
27 Feb 2026
5 Mar 2026
27 Feb 2026
ELECTRICAL LIFT WORK
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
fin_eval.pdf
finance_1419007.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.33 MB
Tendernotice_2.pdf
PDF • 0.12 MB
Tendernotice_3.pdf
PDF • 0.02 MB
NIT.pdf
Tender Documents • 0.02 MB
BOQ_1419007.xls
BOQ • 0.32 MB
SBD.pdf
Tender Documents • 0.56 MB