| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.3 CrAccepted-AOC AVANTIKA COLONY NEAR RICE MILL AMROHA | AMROHA | AMROHA | UTTAR PRADESH | ₹3.3 Cr | L1 | Accepted-AOC accepted |
| 2 | L2₹3.4 Cr+₹10.9 L (3.27%)Rejected-AOC | ₹3.4 Cr+₹10.9 L (3.27%) | L2 | Rejected-AOC rejected |
| 3 | Rejected-Technical 35 8 5 RAMPUR GARDEN AMAN TRADERS 35 8 5 RAMPUR GARDEN NEAR L I C BUILDING BAREILLY UTTAR PRADESH BAREILLY BAREILLY UTTAR PRADESH 243001 UDYAM UP 15 0002258 09EUPPS2879C1ZW B R | BAREILLY | UTTAR PRADESH | 243001 | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical NA | NA | NA | 121004 | - | - | Rejected-Technical Non Responsive |
| 5 | Rejected-Technical FLAT NO 02 KAPIL VIHAR NEAR BANAVEDI DHANA ALIGARH | ALIGARH | ALIGARH | UTTAR PRADESH | - | - | Rejected-Technical Non Responsive |
Tender Value
₹3.4 Cr
EMD Value
₹6.7 L
Closing Date
18 Jan 2023, 12:00 pmClosed
S.E.I.W.C.MORADABAD
OFFICE OF THE S.E.I.W.C.MORADABAD
LOT01 CONSTRUTION WORK OF PARKING ON RAGHT BHAKRA CANAL FROM KM. 0.570 TO KM. 0.688 IN TAHSIL BILASPUR DISST. RAMPUR
2023_UPIDC_765852_1
03/SE/2022-23
Open Tender
Civil Works
Item Rate
90 days
BILASPUR
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹6.7 L
13 Mar 2023
11 Jan 2023
18 Jan 2023
11 Jan 2023
18 Jan 2023
11 Jan 2023
Amount
Laying and Jointing PVC Pipe. Heading
Dismanteling of old Structure of Brick Masonary including cost of all material, labour and T&P etc. complete
Dismanteling of old Structure of CC in floor and foundation including cost of all material, labour and T&P etc. complete.
Earth Work in excavation in foundation in ordinary soil including initial lead & lift i/c all labour and T&P etc.complete.
Laying Ordinary sand under P.C.C.concrete including all cost of labour, material and T&P etc. complete.
Laying (M-15) cement Concrete with cement , coarse sand & 20 mm down graded stone grit including cost of all material, labour and T&P etc. complete but excludiing cost of shuttering. And also including dewatering work with all cost of material, T & P and carriage/lift with respect all site conditions etc. complete.
Laying (M-15) cement Concrete with cement , coarse sand & 20 mm down graded stone grit including cost of all material, labour ,T&P and carriage/lift with respect all site conditions etc. complete but excludiing cost of shuttering. Without dewatering
Centering & Shuttering For slab and Bed Block including all cost of material labour T&P etc. for complete work.
Reinforcement in slab, Bed Block laying,cutting,bending,binding and placing in position including all cost of material,labour,T&P etc. for complete work.
Laying R.C.C. Mix (M-35) with Cement, coarse sand 10 & 20 mm stone ballast including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. And also including dewatering work with all cost of material, T & P and carriage/lift with respect all site conditions etc. complete.
Laying R.C.C. Mix (M-35) with Cement, coarse sand 10 & 20 mm stone ballast including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. and also including carriage/lift with respect all site conditions etc. complete without dewatering.
Laying R.C.C. Mix (M-25) with Cement, coarse sand 10 & 20 mm stone ballast including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. And also including dewatering work with all cost of material, T & P and carriage/lift with respect all site conditions etc. complete.
Laying R.C.C. Mix (M-25) with Cement, coarse sand 10 & 20 mm stone ballast including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. and also including carriage/lift with respect all site conditions etc. complete without dewatering.
Laying (M-20) with Cement, coarse sand 10 & 20 mm stone ballast including cost of all material, labour and T&P etc. complete but excludiing cost of Centering, shuttering & Reinforcement. And also including dewatering work with all cost of material, T & P and carriage/lift with respect all site conditions etc. complete.
Supplying and fixing rubber water stop of 300mm in position including cost of all material, labour T&P, all leads and lifts, cutting, forming, fixing and maintaining them in position for proper completion of work as per direction of Engineer-in-charge.
Premould joint filler 25mm thick /m2 including supply of all materials ,labour and completion of work .
Supplying, laying and consolidation 150 mm thick loose to 100mm of stone ballast size 20 mm to 40 mm by road roller including cost of all material, labour and T&P etc.required for proper completion of work.
Supplying and laying tarfelt sheet below aproach slab as paper bearing including cost of all material labour and T&P required for proper completion of work.
Supplying & Fixing 100 MM dia pipe for drain spout including cost of all material, labour and T&P etc. required for proper completion of work.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications.
Supplying and Laying Graded filter behind Abutment Boulder including all cost of material,labour T&P Carriage Royalty and all taxes etc. complete. (Coarse sand)
Supplying and Laying Graded filter behind Abutment Boulder including all cost of material,labour T&P Carriage Royalty and all taxes etc. complete. (4-10 mm Shingle)
Supplying and Laying Graded filter behind Abutment Boulder including all cost of material,labour T&P Carriage Royalty and all taxes etc. complete. (10-20 mm Shingle)
Supplying and laying loose boulder in U/S and D/S apron i/c cost of all and supply of all materials,labour ,T&P etc. complete
Earth work in embankment in ordinary soil, earth work in embankment to be in 20 cm. layers, including ramming and dressing the surface to the required levels and slopes and also including 1.50 m lift and 600 m. lead. The earth from cutting to be used in making embankment or to be deposited as spoil bank withen 30 m distance as directed by Engineer in charge & also including all cost of borrwed earth from pvt. land, material, labour & T&P etc. complete.
Street light with 6.00 metre pole and 70 volte LED light including cost of all material, labour and T&P etc. complete
Painting two coat with ready mixed paint on Crash barrier surface With supreior synthetic enamel paint of standered make brushing to give an even shade and finishrd and i/c cleaning the surface all durt dust and other foreing metter sand paparing and stripping i/c cost matter and scoured with wire brushes fine steel/wood scrappers sand paparing and knotting i/c cost of all and supply of all materials,labour ,T&P etc. complete
M/S ARUN CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .