Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical | Accepted-Technical OK |
| 2 | Accepted-Technical | Accepted-Technical OK |
| 3 | Rejected-Technical | Rejected-Technical Non-submission of EMD. |
Tender Value
₹4.1 L
EMD Value
₹8,111
Closing Date
15 Aug 2026, 4:00 pmClosed
Executive Engineer
Araksha Bhawan 3rd Floor Block DJ Sector II Salt Lake City
Day-to-day Electrical Maintenance of all types of Internal and External Electrical Installations of Police Establishments in Darjeeling District and Siliguri Police Commissionerate for FY 2026-2027. (1st Call)
2026_WBPHI_5018039_1
WBPHIDCL/EE-(HQ-I)/NIT- 8(e)/2026-2027
Open Tender
ELECTRICAL WORKS M/R
Percentage
Refer to NIT
Please refer Tender documents.
6 documents required · 6 mandatory
₹0
₹8,111
Yes
3 Sept 2026
6 Aug 2026
17 Aug 2026
6 Aug 2026
15 Aug 2026
8 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Electrical (maintenance works) and operation of pump- motor sets.
Note:All the item of SOR of PWD Electrical works w.e.f 1.11.2017 including up to date addenda , corrigenda and the approved non schedule item of works (including 18% GST & 1% labour cess)
( The work shall continue of the entire contract period as per the requirement & as directed by the Engineer in charge .The payment of the executed work shall be made on the basis of - (A) PWD schedule of rates (B) As per the ANNEXURE - 2023/2 for non-schedule items (C) List of rates proposed by PWD (Sub Committee) on 27/02/2026 for different electrical works.) | - | LOT | 60,000 | - |
| 2 | Day to day Operation of pump- motor sets and Emergent EI Maintenance works
Supply of manpower for operation of pump motor sets and controlling valves in water supply line to provide uniterrupted water supply with minor electromechanical works and Repair , Maintenance of electrical installation as and when required for a period of 274 days as per direction of EIC. Location details of
Electrician (Skilled) :-
A) Darjeeling PD, Dali Police Line
Shift Duration :-
(i) 10:00 AM to 06:00 PM
=> 1 no. Electrician (Skilled) for Day Shift
Therefore, Operation Shift = (1x274x1 ) = 274 ** { Shift x Days x Man Power}
Electrician Cum Pump Operators (Skilled) :-
B) Siliguri Police Commissionerate, Mallaguri Police Line
Shift Duration :-
(i) 08:00 AM to 04:00 PM
=> 1 no. Electrician-Cum-Pump Operator (Skilled) for Day Shift
Therefore, Operation Shift= (1x274x1 ) = 274 ** { Shift x Days x Man Power}
Total = (274 + 274) = 548 Shifts is to be provided by the agency ( Minimum tools and tackles should be provided by the agency)
( RATES ARE INCLUDING 10 % AGENCY PROFIT ,18% GST & 1% LABOUR CESS)
N.B. :- Submission of "License to Electrical Contractors" By the Bidder is mandatory. | - | PerShiftPerElectricianCumPumpOperator | 630.58 | - |
stage.html
html • 0.02 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.18 MB
Tendernotice_2.pdf
PDF • 0.41 MB
Tendernotice_3.pdf
PDF • 0.91 MB
BOQ_5088681.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .