| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.0 LAccepted-AOC CHANDAULI UP UTTAR PRADESH | CHANDAULI | UTTAR PRADESH | ₹7.0 L | L1 | Accepted-AOC l1 |
| 2 | L2₹7.6 LRejected-Finance CHAKIYA CHANDAULI | CHAKIYA | CHANDAULI | UTTAR PRADESH | ₹7.6 L | L2 | Rejected-Finance L2 |
| 3 | L3₹7.8 LRejected-Finance GRAM CHHITONA POST MUSTAFABAD CHAUBEPUR JANPAD VARANASI | ₹7.8 L | L3 | Rejected-Finance L3 |
| 4 | L4₹8.1 LRejected-Finance | ₹8.1 L | L4 | Rejected-Finance L4 |
| 5 | Not Admitted-Fee/PreQual/Technical BODARE CHAKIA CHANDAULI | CHAKIA | CHANDAULI | UTTAR PRADESH | - | - | Not Admitted-Fee/PreQual/Technical Not Complied with technical specification |
| Sl No | Description | Qty | Unit | M/S P S CONSTRUCTION L2 | Pranshul Enterprises L4 | M/S SADGURU CONSTRUCTION L1 | M/S YOGESH KUMAR SINGH L3 |
|---|---|---|---|---|---|---|---|
| 1.00 | Dismentling and disposal of brick masonary including stacking of materials as directed by site incharge , including cost of all labour, T&P etc. | 8.76 | Cum | 250 ₹2,190 | 274 ₹2,400.24 | 216.09 ₹1,892.95 | 250 ₹2,190 |
| 2.00 | Dismantling and disposal of R.C.C.1:2:4 work slab including stacking of materias as directed by Engineer In-Charge. including all labour, T&P etc. | 2.22 | Cum | 585 ₹1,298.70 | 624 ₹1,385.28 | 458.64 ₹1,018.18 | 550 ₹1,221 |
| 3.00 | Dismantling and disposal of C. C. 1:4:8 work of base concrete including stacking of materias as directed by Engineer In-Charge. including all labour, T&P etc. | 4.41 | Cum | 385 ₹1,697.85 | 430 ₹1,896.30 | 314.58 ₹1,387.30 | 400 ₹1,764 |
| 4.00 | Earth work in excavation of foundation in ordinary/sandy loam, clay or sand including lift upto 1.5 m. and lead upto 30.00m. including filling, watering, ramming of excavated earth in to the trenches or upto the space and side of the foundation trenches and removal and disposal of surplus earth as directed by Engineer-in-charge. Including all labour, T&P etc. | 183.66 | Cum | 75 ₹13,774.50 | 80 ₹14,692.80 | 73.5 ₹13,499.01 | 100 ₹18,366 |
| 5.00 | C. C. with M-10 (1:3:6) in foundation of abutment with cement, coarse sand F.M. above 2.0 and stone ballast 45 – 63 mm including all material, labour, T&P etc. | 14.24 | Cum | 4,300 ₹61,232 | 5,711 ₹81,324.64 | 4,382.07 ₹62,400.68 | 5,100 ₹72,624 |
| 6.00 | C. C. with M-10 (1:3:6) in foundation of floor with cement, coarse sand F.M. above 2.0 and brick ballast 20-40 mm including all material, labour, T&P etc. | 4.23 | Cum | 1,300 ₹5,499 | 1,672 ₹7,072.56 | 3,137.71 ₹13,272.51 | 2,300 ₹9,729 |
| 7.00 | First class brick work in 1:4 c.m. with first class brick, cement and coarse sand F.M. 1.5 to 2.0 including all cost of material, labour, T&P etc. | 93.82 | Cum | 5,000 ₹4.7 L | 5,280 ₹5.0 L | 4,582.72 ₹4.3 L | 4,800 ₹4.5 L |
| 8.00 | Shuttering & Centering for slab and bed block including all material, labour, T&P etc. | 43.42 | Sqm | 625 ₹27,137.50 | 555 ₹24,098.10 | 471.87 ₹20,488.60 | 600 ₹26,052 |
| 9.00 | Reinforcement work in slab and bed block with cutting, bending, placing, binding including cost of all material, labour, binding wire, T&P etc. | 0.83 | M. T. | 71,000 ₹58,930 | 92,000 ₹76,360 | 68,585.05 ₹56,925.59 | 89,000 ₹73,870 |
| 10.00 | R. C. C. with M-20 (1:1.5:3) in slab and bed block with cement, coarse sand F. M. above 2.0 and crushed stone grit 10-20 mm and 4.75-10 mm size with mechanically mixed and mechanically compaction including all cost of material, labour, T&P etc. | 8.46 | Cum | 8,800 ₹74,448 | 8,500 ₹71,910 | 6,851.67 ₹57,965.13 | 8,900 ₹75,294 |
Tender Value
₹9.5 L
EMD Value
₹18,952
Closing Date
8 Sept 2025, 2:00 pmClosed
Executive Engineer
Chandraprabha Division PDDU Nagar Chandauli
Reconstruction of a V.R.B. at KM 0.800 0f Janakpur Minor of Chandraprabha Division PDDU Nagar Chandauli
2025_UPIDC_1070583_26
01/EE/2025-26
Open Tender
Civil Works
90 days
Janakpur Minor
Please refer Tender documents.
2 documents required · 2 mandatory
₹766
₹18,952
13 Jan 2026
3 Sept 2025
8 Sept 2025
3 Sept 2025
8 Sept 2025
3 Sept 2025
Amount
Dismentling and disposal of brick masonary including stacking of materials as directed by site incharge , including cost of all labour, T&P etc.
Dismantling and disposal of R.C.C.1:2:4 work slab including stacking of materias as directed by Engineer In-Charge. including all labour, T&P etc.
Dismantling and disposal of C. C. 1:4:8 work of base concrete including stacking of materias as directed by Engineer In-Charge. including all labour, T&P etc.
Earth work in excavation of foundation in ordinary/sandy loam, clay or sand including lift upto 1.5 m. and lead upto 30.00m. including filling, watering, ramming of excavated earth in to the trenches or upto the space and side of the foundation trenches and removal and disposal of surplus earth as directed by Engineer-in-charge. Including all labour, T&P etc.
C. C. with M-10 (1:3:6) in foundation of abutment with cement, coarse sand F.M. above 2.0 and stone ballast 45 – 63 mm including all material, labour, T&P etc.
C. C. with M-10 (1:3:6) in foundation of floor with cement, coarse sand F.M. above 2.0 and brick ballast 20-40 mm including all material, labour, T&P etc.
First class brick work in 1:4 c.m. with first class brick, cement and coarse sand F.M. 1.5 to 2.0 including all cost of material, labour, T&P etc.
Shuttering & Centering for slab and bed block including all material, labour, T&P etc.
Reinforcement work in slab and bed block with cutting, bending, placing, binding including cost of all material, labour, binding wire, T&P etc.
R. C. C. with M-20 (1:1.5:3) in slab and bed block with cement, coarse sand F. M. above 2.0 and crushed stone grit 10-20 mm and 4.75-10 mm size with mechanically mixed and mechanically compaction including all cost of material, labour, T&P etc.
Wearing coat with M-20 (1:1.5:3) in cement, coarse sand F. M. above 2.0 and crushed stone grit 10-20 mm and 4.75-10 mm with mechanically mixed including all cost of material, labour, T&P etc.
Deep struck pointing in 1:2 c.m. on open new brick surface with cement and coarse sand F.M. 1.5 to 2.0 including all material, labour, T&P etc.
Finishing wall with water proof cement paint of approved make such as super snowcem of required shade on new wall surface with two coat of paint over one coat of primer to give an even shade after thoroughly brushing the surface to remove all dirt and remains, loose powdered materials including curing and cost of all materials, labour T&P etc. required for proper completion.
Supplying and fixing of wheel guard stone including cost of all material, labour, t&p etc.
Earth work in correcting section of canal by J.C.B. machine including partial compaction in layers with initial lead and lift of 5.0 m each including cost of all labour t&p etc.
M/S P S CONSTRUCTION (BID ID -5520216)
M/S YOGESH KUMAR SINGH (BID ID -5518079)
Pranshul Enterprises (BID ID -5520023)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf