Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance SADALAYAM THODIYOOR NORTH P O VEGARA KARUNAGAPPALLY KOLLAM | KARUNAGAPPALLY | KOLLAM | KERALA | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
10 Sept 2021, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager(Commercial)
Travancore Titanium Products Limited Kochuveli Trivandrum 695 021
Replacing AC sheets inside and outside of TiO2 plant.
2021_TTPL_427903_1
TTP/CD/CN/SR-39/RT-1/AC Sheets/C/20-21
Open Tender
Miscellaneous Works
Item Rate
90 days
Travancore Titanium Products
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,950
Yes
₹50,000
Yes
25 Oct 2021
13 Aug 2021
13 Sept 2021
13 Aug 2021
10 Sept 2021
13 Aug 2021
13 Aug 2021 - 9 Sept 2021
90 days
Replacing AC sheets inside and outside of TiO2 Plant
Labour charges for dismantling carefully the damaged AC sheet on roof and side cladding etc.without causing any damage to the nearby sheet and structural up to a height of 24m including charges for scaffolding and dumping the waste to the dump yard etc. as per direction of the Engineer in charge
Labour charges for dismantling carefully the damaged apron sheet, barge board, ridges etc. without causing any damage to the nearby sheet and structurals up to a height of 25m including cost of all labour, hire of tools, charges for scaffolding, dumping the waste to dumpyard etc. complete as per the direction of the Engineer in charge
Labour charges for fixing AC sheet/FRP Sheet on roof and side cladding with GI bolts and nuts, grease washer, rubber cap, roofing compound etc. upto a height of 25m including cost of all labours ,hire of tools,conveying, cutting the sheet into suitable size if necessary, charges for scaffloding etc. complete asper the direction of the Engineer in charge
Labour charges for fixing AC ridge coupling (pair), barge board, apron sheet etc. using GI bolts/PVC coated nuts and bolts, washer, rubber cap etc. as per standard practice on roof upto a height of 25m including cost of all labour, hire of tools, charges for scaffolding, cutting to size etc. complete as per the direction of officer in charge.
Labour charges for providing additional/ replacing of PVC coated GI hook, L bolts and nuts, GI bitumen washer and rubber caps with grease to the AC sheets of roof level (25mtrs) and vertical cladding of TiO2 plant and other building including hire of tools, charges for scaffolding etc. complete as per direction of the Engineer in charge
Labour charges for dismantling & removing the AC roofing sheet and stacking the material for structural repair work without causing any damage to the sheet and refixing the same or new sheets after repairing works including cost of all labours ,hire of tools, charges for scaffloding etc. complete as per the direction of officer in charge
Labour charges for dismantling & removing the ridges( in pair) barge board/ apron sheet etc. or the roof of building without causing any damage, stacking at nearby site for reuse and refixing the same or any ridges after repairing work including cost of all labour, hire of tools, charges for scaffolding etc. complete as per the direction of officer in charge
Labour charges for water proofing the leaked portion of roof gutter using tarfelt sheet one layer bounded in bitumen and applying the same at the top and bottom surface of the tarfelt sheet including charges for removing and refixing the AC sheet wherever necessary etc complete
Labour charges for repairing/modifying and replacing the damaged steel structurals such as column, beam, staircase, purlin, trusses, bracing, bracket etc of the building at various levels up to height of 25.3 m including charges for fabricating members to size, conveying it to the site, lifting and fitting in position either by welding or by bolting, painting with iron primer one coat and two over coats with rubber baseed paint after cleaning the surface thoroughly, cost of welding rods, cutting gas , hire of tools and charges for scaffolding also conveying MS materials from store etc and debris to the dumpyard etc complete
Labour charges for dismantling, removing and lowering damaged and corroded MS section from the building at various level up to a maximum height of 25 m including charges for conveying and dumping the same in dump yard, hire of tools and cost of cutting gas etc. complete.
Labour charges for cleaning the surface thoroughly by chiselling, scrapping, wire brushing, sand papering and providing protective covering over the equipments, vessels and TiO2 bags etc to prevent rust and dust falling inside including charges for all tools, scaffolding etc. complete as per the direction of the Engineer in charge.
Labour charges for painting with zinc chromate primer over steel structurals such as columns, beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways, pipelines, cable trays, steel doors , windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys and equipment supports etc after cleaning the surface as specified in item no: 1 above, complete as per the direction of the Engineer in charge.
Labour charges for painting with rubber based paint (lighty grey) over steel structurals such as columns, beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways, pipelines, cable trays, steel doors , windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys and equipment supports including charges for all tools, scaffolding etc complete as per the direction of the Engineer in charge.
Labour charges for painting with rubber based paint (dark grey) over steel structurals such as columns, beams, roof trusses, purlin, louvers, brazing, connected platforms, hand rails, staircases, walkways, pipelines, cable trays, steel doors , windows, gates, cover plates, tanks, ducts, scrubber stack, chimneys and equipment supports including charges for all tools, scaffolding etc complete as per the direction of the Engineer in charge.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .