| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.2 LAccepted-AOC KAYANNA BAZAR KAYANNA P O KOZHIKODE | L1 | Accepted-AOC First lowest | |
| 2 | L2₹9.1 L+₹86,088.29 (10.5%)Rejected-AOC KERALA KL KERALA | L2 | Rejected-AOC Second lowest |
Tender Value
₹10.2 L
EMD Value
₹25,394
Closing Date
21 Sept 2023, 6:55 pmClosed
Assistant Executive Engineer
KyIP(O,M) Subdivision, Peruvannamuzhi, PIN - 673528
Rectification to nochad distributary
2023_Irrig_602455_1
IRR/PI/EST/4342/2023_5_6_5
Open Tender
Civil Works - Canal
Item Rate
90 days
nochad
Please refer Tender documents.
7 documents required · 7 mandatory
₹2,760
Yes
₹25,394
Yes
5 Jun 2024
13 Sept 2023
25 Sept 2023
13 Sept 2023
21 Sept 2023
13 Sept 2023
13 Sept 2023 - 21 Sept 2023
Amount
Canal Lining
2.6.1:Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
4.1.8:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:4:8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 nominal size)
4.3.2:Centering and shuttering including strutting, propping etc. and removal of form work for:Retaining walls, return walls, (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc.
4.1.5:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size)
4.1.3:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size)
2.25:Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundation etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 m and lift up to 1.5 m.
50.13.1:9 mm cement plastering of mix : 1:3 (1 cement : 3 fine sand ) including all cost of materials, labour charges etc complete
VK BALAN
Bidder Name
VK BALAN
KAIRALI LABOUR CONTRACT CO OPERATIVE SOCIETY LIMITED NO D3251
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_896116.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .