Additional Chief Engineer (P&C)
Supply, Erection, Testing & Commissioning of 66kV D/C line on D/C panther tower with AL-59 Conductor (Eq. Wt. to ACSR Panther Conductor) from 400kV Mevasa substation to 66kV Moda substation package 1 from AP-01 to AP-41 having Overhead line length 15.49Rkm under Anjar Circle. (Only OH Portion)
323009
ACE(P&C)/Contract/E-470/TL/66kV/S&E
Open
Electrical Works
Works
Vadodara
38 documents required · 27 mandatory · 11 optional
₹11,800
Gujarat Energy Transmission Corporation Limited
₹3.8 L
11 Aug 2026
10 Jul 2026
18 Aug 2026
10 Jul 2026
11 Aug 2026
10 Jul 2026
Sr. No. Description of Works - SAC Code 9954 Amount in Rs.
PART -A Supply of Materials
Erection of Line
TOTAL F.O.R. COST WITHOUT GST
Service of "Works Contracts" GST @ 18% (SAC 9954)
TOTAL END COST WITH GST
I am / we are willing to carry out this service package of works contract stated above at GST 18% (in figure) ______
% (in words _____ %) below / above the estimated TOTAL END COST for all the items stated there in.
The amount of tender works out with above % (in figure) for TOTAL END COST Rs. _____________ (in words Rs.
I / we confirm that our above quoted rates are ON firm price basis; except supply of tower materials (including nut-
bolts) for which Price variation will be applicable.
1) Separation of the Contract into Supply of Goods, Services and Civil Work, is only for convenience and better economical
management and for the ease of Accountancy but the entire Contract, is to be assessed under GST Law, as the Works
Contract Service, which is, as per the provisions of Section 2(30), read with, Section 2(119), further read with, Paragraph 6(a)
of the Schedule II to the CGST Act, 2017 or SGST Act, 2017 and similar provisions, applicable under the UTGST Act, 2017and
the IGST Act, 2017 and the entire activity, would be subjected to levy of Tax, at the rate of 9% CGST + 9% SGST or 18%
IGST, under the GST Law. However, Classification Codes for different segments or portions of the Works Contract, may be
specified separately, in the Supplies, with a final common Classification Code of Works Contract Service.
2) The Bidder is hereby conveyed that only SAC Code and Tax rate for supply of Service Works Contract i.e. 18% is relavant
for the purpose of contract since the contract is works contract and any separation in the works is for better management and
convenience purpose.
It is to state that bidders are however requested to fill the HSN code item by item for the knowledge and transparency purpose
which shall have no bearing on price or taxation payment.
Signature of Authorized Representative of Company / Agency
SEAL & SIGNATURE Status _________________
OF BIDDER Name of bidder Company
Estimated Cost - SUPPLY
Supply, Erection, Testing & Commissioning of 66kV D/C line on D/C panther tower with AL-59 Conductor (Eq. Wt. to ACSR Panther Conductor) from 400kV Mevasa
substation to 66kV Moda substation package 1 from AP-01 to AP-41 having Overhead line length 15.49Rkm under Anjar Circle. (Only OH Portion)
Tender No.: ACE(P&C)/Contract/E-470/TL/66kV/S&E
Sr. No. Description of Supply with Detail HSN / SAC Unit Quantity Unit Rate Unit Freight, Unit FOR Unit Rate FOR Total Cost
Specification of Service Package - Works code for Packing & Insurance in Rs. (Excl. GST)
Contract (SAC Code 9954) identification Forwarding Charges in in Rs.
only charges Rs.
A Supply of Materials
A.1 Tower Materials
A-2 AL-59 Conductor (Eq. Wt. to ACSR Panther kM 94.000 328767.00 4264.00 1828.00 334859.00
A.3 Silicone Rubber insulators - 66kV
A.4 Insulator hardware for AL-59 Conductor (Eq.
Wt. to ACSR Panther Conductor)
A.4.1 Single suspension Nos. 222 1666.00 37.00 16.00 1719.00
A.4.2 Double suspension Nos. 6 3916.00 103.00 44.00 4063.00
A.4.6 Mid span joint Nos. 52 785.00 10.00 4.00 799.00
A.4.7 Vibration damper Nos. 564 603.00 25.00 11.00 639.00
A.4.8 Repair sleeve Nos. 9 323.00 6.00 2.00 331.00
A.5 Hardware for Earth wire (7/3.15mm) -
A.4.1 Suspension Clamp Nos. 0 440.00 12.00 5.00 457.00 -
A.4.2 Tension Clamp Nos. 0 433.00 9.00 4.00 446.00 -
A.4.3 Mid span Joint Nos. 0 115.00 1.00 1.00 117.00 -
A.4.5 copper earth bond Nos. 0 558.00 13.00 6.00 577.00 -
A.6 OPGW - 24 Fibre (220kV) -
A.6.1 24 Fibre (DWSM) OPGW fibre Optic cable Km 0.000 145356.00 1999.00 857.00 148212.00 -
A.6.2 Installation Hardware set * & accessories for Km 0.000 45351.00 502.00 215.00 46068.00 -
above OPGW i.e. all cable fittings & accessories
like suspension clamps, tension clamps, vibration
dampers, earthing clamps, down lead clamps, in-
line splice enclosures etc. including; Pigtails FC-
a) Fibre Optic Approach Cable -
400 Mtrs - For 220KV S/S &
500 Mtrs - For 400KV S/S
(with installation hardware like ties/ clips / cleats,
conduits, ducts, supports, fittings, accessories
(Any variation in quantities shall be absorbed by
A.7 OPGW - 48 Fibre (220kV)
A.7.1 48 Fibre (DWSM) OPGW fibre Optic cable Km 15.500 195533.00 2385.00 1022.00 198940.00
A.7.2 Installation Hardware set * & accessories for Km 15.500 48279.00 644.00 276.00 49199.00
above OPGW i.e. all cable fittings & accessories
like suspension clamps, tension clamps, vibration
dampers, earthing clamps, down lead clamps, in-
line splice enclosures etc. including; Pigtails FC-
a) Fibre Optic Approach Cable -
400 Mtrs - For 220KV S/S &
500 Mtrs - For 400KV S/S
(with installation hardware like ties/ clips / cleats,
conduits, ducts, supports, fittings, accessories
(Any variation in quantities shall be absorbed by
TOTAL COST FOR MATERIALS
Service of "Works Contracts" GST @ 18%
1) Separation of the Contract into Supply of Goods, Services and Civil Work, is only for convenience and better economical management and for the ease of
Accountancy but the entire Contract, is to be assessed under GST Law, as the Works Contract Service, which is, as per the provisions of Section 2(30), read with,
Section 2(119), further read with, Paragraph 6(a) of the Schedule II to the CGST Act, 2017 or SGST Act, 2017 and similar provisions, applicable under the UTGST
Act, 2017and the IGST Act, 2017 and the entire activity, would be subjected to levy of Tax, at the rate of 9% CGST + 9% SGST or 18% IGST, under the GST Law.
However, Classification Codes for different segments or portions of the Works Contract, may be specified separately, in the Supplies, with a final common
Classification Code of Works Contract Service.
2) The Bidder is hereby conveyed that only only SAC Code and Tax rate for supply of Service Works Contract i.e. 18% is relavant for the purpose of contract since the
contract is works contract and any separation in the works is for better management and convenience purpose.
It is to state that bidders are however requested to fill the HSN code item by item for the knowledge and transparency purpose which shall have no bearing on price or
taxation payment.
Signature of Authorized Representative
of Company / Agency
SEAL & SIGNATURE Status _________________
OF BIDDER Name of bidder Company
ERECTION PORTION
Tender No.: ACE(P&C)/Contract/E-470/TL/66kV/S&E
Supply, Erection, Testing & Commissioning of 66kV D/C line on D/C panther tower with AL-59 Conductor (Eq. Wt. to ACSR Panther Conductor) from
400kV Mevasa substation to 66kV Moda substation package 1 from AP-01 to AP-41 having Overhead line length 15.49Rkm under Anjar Circle. (Only OH
Description of Supply with Detail Specification of Service Package - Works code for
SN Unit Quantity Unit Rate (Excl. GST)
Contract (SAC Code 9954) identificatio
B ERECTION OF LINE
B-1 Schedule-1 (Tower line)
The work of detail survey, preparation and submission of profiles in 6 copies
(PLSCAD as well as hardcopy),
Detail scope of Work :-
(a) Fixing of tower as per actual requirement, site condition and plotting of line
on profile having standard details i.e. span length, lat-long (co-ordinate),
chainage, weight and wind span, all dimensions, scale, legends, tower spotting
data etc. as per requirement and along with all require details.
(c) Preparation and submission of tower schedule as per standard require
details with all the Major - Minor crossing details in profile drawing and tower
schedule, along with due care of clearance as per prevailing standards i.e., for
1 all electric line with pole, all type of track, river, pond, nala, road, canal etc. kM 15.500 10538
(d) Details of Right of Way in profile drawing. i.e. Building, Temple, Well etc.
(g) Plotting line on TIKKA-MAP (Revenue Land map) - Required TIKKA-MAP
will be provided by GETCO.
Importantly, any work other than mentioned will align with the specific
requirements outlined by the Engineer-in-Charge.
Note : The survey report will be submit with sign and stamp of the surveyor
agency and engineer in charge.
Check Survey along with plotting of line route on village (tika) map with
2 Coordinates including detailed survey, preparation of profiles and revision in kM 15.500 10859
original route alignment, if any and as per instruction of EIC.
Excavation excluding back filling, but including shoring, shuttering, dewatering,
tree cutting for tower footings etc. for:-
a) Normal soil either dry or wet / Sandy soil. CMT 1397.94 384.00
b) Black Cotton Soil either dry or wet. CMT 587.01 763.00
c) Normal submerged / marine soil where dewatering is necessary.
d) Black cotton submerged / marine soil where dewatering is necessary.
e) Soft Rock CMT 45.51 1246.00
f) Hard Rock CMT 81.82 2583.00
Installation of steel reinforcement in concrete foundation including supply of
GETCO Approved M.S. bars, binding wire. Work also includes their cutting,
bending, shaping and binding with binding wire and fixing in position of TMT
bars as per drawing before the concrete work and as per instruction of the EIC
Stub-setting with prop or template including back-filling, during back filling
dispose of excess soil and levelling of site is to be done as per instructions of
EIC but excluding excavation and concreting etc. for all types of
towers/extensions except special towers. (Weight of stub, cleat & template with
Bolt & Nuts of stub & template shall be counted)) up to 6 mtr extension. (SOR
6 ---- Do ---- up to 9 to 25 mtr extension MT 1.438 12388.00
Concreting of foundation by M20/M15/M25 mixture including shoring,
shuttering, compaction, dewatering etc. for normal tower / tower with extension
After completion of concrete work, curring (watering to concerte) is to be done
as per instruction of EIC.
(Rates are inclusive of supply of GETCO approved Cement only.)
Grounding of towers with pipe type earthing including excavation and back
filling, with supply of all materials like 32mm dia heavy duty 3 mtr. long G.I. Pipe,
50 x 6 mm G.I. flat, GI bolt-nuts, with GI spring washer, salt, charcoal etc. as per
drawing and as per instruction of EIC.
Grounding of towers with COUNTER POISE TYPE including excavation and
9 back-filling and supply of all materials like GSS wire, lugs, bolt-nuts, salt, Set. 26 19690.00
coke/charcoal as per drawing.
Erection of super structure upto 6 meter extension including tree cutting,
fixing of tower accessories, attachments except ACD /DP /NP /CIP /PP and
excluding tack welding of bolts as per instruction of EIC. This includes taking
10 delivery of tower materials and bolt-nuts from GETCO’s stores etc. for normal, MT 213.064 13181.00
extension & special towers at destination and keeping them in safe custody and
transporting the same to erection site.
Description of Supply with Detail Specification of Service Package - Works code for
SN Unit Quantity Unit Rate (Excl. GST)
Contract (SAC Code 9954) identificatio
Same as above but erection of 9/12/15/18/21/25 mtr. Extention with Tower.
Fixing of Anti-climbing devices including supply of barbed wire as per
drawing and as per instruction of EIC.
Fixing of DP / NP / PP / CIP including supply of plates and supply of G.I. bolts-
13 nuts & tack welding as per drawings and as per instruction of EIC. Loc. 0 1817.00 -
13(a) (II) For D/C Loc. 82 3634.00
13(b) (II) For M/C Loc. 0 7268.00 -
Tack welding of nuts upto approx. 10 mtrs. height OR two bottom-most panel
from ground level at three places on the nuts diametrically and applying zinc rich
14 paint immediately after tack welding and as per instruction of EIC. Per Bolt 41400 23.00
Complete Installation of OPGW cable (24/48 fibres) including laying, providing
required hardwares, in line splices to be encased in Fibre Optic Splice
Enclosures, Laying and termination of a fibre optic approach cable required to
15 connect Overhead Fiber Optic Cable (OPGW) between the final iin line splice RKM 15.500 97193.00
enclosure on the gantry/tower and the Fibre Optec Distribution panel (FODP) to
be installed within the building at both the substation ends as per technical
16 Link up of OPGW Cable including all related activities as per inst. Of EIC. RKM 15.500 8850.00
Stringing of ACSR/ AAAC 6 (Six) conductors for double circuit including laying,
jointing, tensioning, clamping with armour rods, hoisting of insulator string fixing
17 of jumpers, dampers etc. & with required tree cutting on entire length for RKM 15.300 146128.00
adequate clearances / safe charging of line, as per instruction of EIC.
Stringing of ACSR/ AAAC 3 (Three) conductors for single circuit including
laying, jointing, tensioning, clamping with armour rods, hoisting of insulator
18 string fixing of jumpers, dampers etc. & with required tree cutting on entire RKM 0.000 73064.00 -
length for adequate clearances / safe charging of line, as per instruction of EIC.
Work of Painting of Line name, Location No., two coat Painting Color code of
desired length and telephone no. on Tower Leg with letter of Gujarati language
19 using ISI marked Paint as per instruction of EIC including Supply of paints and per loc 0 260.00 -
other require materials.
a)Two legs - For 1 Nos. of Line (S/C)
b) All four legs - For 2 Nos. of Line (D/C) per loc 82 519.00
Schedule-1 (H-frame)( All material will provide by GETCO free of cost)
Erection of ‘H’ frame structure with channels, bracings, clamps etc. for ‘A’/’B’
type location including excavation in Normal/ black cotton soil (Dry / Wet /
submerged) and back filling of earth and leveling of the land as per inst. of EIC.
Also with supply of bolts, nuts and painting of the complete structure including
20 required tree cutting. Before erection, one coat of good quality primer must be per loc 4 15168.00
applied to the complete structure and black paint of standard make should be
applied up to 3 mtr. from bottom. After erection, two coats of aluminium paint of
Asian / Burger / Nerolac make shall be applied to the complete structure.
As per Item Sr. No. 1, but for angular location upto 60 Degree deviation / dead
end – ‘C’ type.
Stringing of ACSR/AAAC - 3 (Three) conductors for single circuit including
laying, jointing, tensioning, clamping with armour rod, hoisting of insulator string,
jumpering, fixing of dampers etc. complete as per specification including
22 required tree cutting with adequate clearance and safe charging of Line and as Route Km. 0.20 49884.00
per instruction of EIC.
Grounding of above ‘H’ frame/single pole structure with pipe type earthing as
per drawing including excavation by augering & back filling & supply of all
materials like 32mm dia. heavy duty 3 mtr. long GI pipe (B-Class) & G.I. flat of
50x6mm size including supply of bolt nuts, salt, coal, charcoal etc. as per
drawing. and as per instruction of EIC.
Erection of stay set complete including excavation with stay clamp, turn buckle,
24 eye bolt, anchor rod and binding with 7/8 or 7/10 SWG earth wire, as per Set. 24 1100.00
instruction of EIC.
Concreting of foundation for all the structures, with M15 mix. including
concreting of stay sets with supply of materials like cement of 43 grade, sand,
metal etc. with muffing (400 mm Dia x 300 mm Ht.) above ground level for all
25 the structures. CU.M. 0 13063.00 -
After completion of concrete work, watering to concerte is to be done as per
instruction of EIC. Rates are inclusive of supply of GETCO approved Cement
Description of Supply with Detail Specification of Service Package - Works code for
SN Unit Quantity Unit Rate (Excl. GST)
Contract (SAC Code 9954) identificatio
Tack welding of nuts at three places on the nuts diametrically fitted to ‘A’, ‘B’
26 and ‘C’ TYPE structures and applying red oxide & zinc rich paint on it Per Bolt. 60 34.00
immediately after tack welding, as pre instruction of EIC.
Conversion of ‘A’ type ‘H’ frame structure into ‘B’ type ‘H’ frame structure in
existing line by replacing necessary channels etc. and termination and
27 restringing of Dog or Panther 3 conductors for making LILO arrangement with 0.000 48355.00 -
existing line or for change over of line during availability of specified outage
Providing & fixing of NP with name of line / DP including supply of bolts & nuts
and tack welding/ punching as per drawings.
Providing & fixing of ACD on A & B Type H - Frame as per drawing and as per
instruction of EIC.
Providing & fixing of ACD on C Type H - Frame as per drawing and as per
instruction of EIC.
Work of Painting of Line name, Location No., two coat Painting Color code of
desired length and telephone no. on H-Frame (2 Leg) with letter of Gujarati
language using ISI marked Paint as per instruction of EIC including Supply of
paints and other require materials.
TOTAL COST PART - B, SCHEDULE - 01 WITHOUT GST
Service of "Works Contracts" GST @ 18% (SAC 9954)
TOTAL COST PART - B, SCHEDULE - 01+02 WITH GST
1) While calculating the weight of stub-setting, the weight of stub, cleat & templetes shall also be added in stub weight.
2) Red oxide & zinc rich paint shall be applied after tack welding of nuts.
3) The above rates are with supply of cement by the contractor.
4) The rate indicated above includes taking delivery of all stringing materials from Board / Contractor store at destination keeping them in safe custody and
transporting the same to erection site.
1) Separation of the Contract into Supply of Goods, Services and Civil Work, is only for convenience and better economical management and for the ease
of Accountancy but the entire Contract, is to be assessed under GST Law, as the Works Contract Service, which is, as per the provisions of Section 2(30),
read with, Section 2(119), further read with, Paragraph 6(a) of the Schedule II to the CGST Act, 2017 or SGST Act, 2017 and similar provisions, applicable
under the UTGST Act, 2017and the IGST Act, 2017 and the entire activity, would be subjected to levy of Tax, at the rate of 9% CGST + 9% SGST or 18%
IGST, under the GST Law. However, Classification Codes for different segments or portions of the Works Contract, may be specified separately, in the
Supplies, with a final common Classification Code of Works Contract Service.
2) The Bidder is hereby conveyed that only only SAC Code and Tax rate for supply of Service Works Contract i.e. 18% is relavant for the purpose of
contract since the contract is works contract and any separation in the works is for better management and convenience purpose.
It is to state that bidders are however requested to fill the HSN code item by item for the knowledge and transparency purpose which shall have no bearing
on price or taxation payment.
Signature of Authorized Representative
of Company / Agency
SEAL & SIGNATURE Status _________________
OF BIDDER Name of bidder Company
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
38. EMD BG Format.pdf
1. E-470 Tender Specification Part-1.pdf
2. E-470 Amendment -I Part-I Tender Spec.pdf
3.Tender Notice E-470.pdf
4.Price Bid Part-III 66kv Mevasa Moda Line pkg-1.pdf
5.L2 Schedule 400kV Mevasa substation to 66kV Moda substation P-1.pdf
6.BOQ 66kV Mevasa- Moda line Pck-1.pdf
7.Lat-Long Detail Mevasa Moda Line P-1 E-470.pdf
8. 02_TOWER MATERIAL-66KV LINE-PANTHER.pdf
9. AL59 PANTHER and MOOSE_R5.pdf
10.Amendment- Structure weight.pdf
11.ON - Ammendment for ROW clause Tender Copy.pdf
12.OPGW (48F) specs final-R2-11.09.2023 final.pdf
13.R1 - STEEL DRUM.pdf
14.R5 May 24- Silicon Rubber - Print Copy.pdf
15.Standard MQP GI Tower material for issuence to SUPPLIER COPY.PDF
16.SUPPLY and ERECTION OF 66KV DC LINES - with andWO CONDUCTOR.pdf
17.HW AL 59 Panther TS HW 22.04.2025 print copy.pdf
18.4R DAMPER FOR ACSR ALL COND tender drg.pdf
19.Double Suspension Hardware for Panther.pdf
20.DOUBLE TENSION HW AL 59 PANTHER.pdf
21.NEW DEAD END AL59 Panther 23.8 mm.pdf
22.NEW MSJ AL 59 Panther 23.8 mm.pdf
23.PREFORMED ARMOUR ROD AL 59 PANTHER.pdf
24.REPAIR SLEEVE AL 59 CONDUCTOR.pdf
25.SINGLE SUSPENSION HARDWARE FOR PANTHER ACSR.pdf
26.SINGLE TENSION HW AL 59 PANTHER.pdf
27._PIPE_TYPE_EARTHING_1.pdf
28._PIPE_TYPE_EARTHING_2.pdf
29._PIPE_TYPE_EARTHING_3.pdf
30._ERECTION Circular-1.pdf
31._ Erection circular -2.pdf
32._RoW policy 2021.pdf
33._STD FQP TR LINE JUNE-2014.pdf
34._Public Procurement Circular of GOI.pdf
35._Safety_regulation_for_transmission_line.pdf
36_ compensation GR_0001.pdf
37 RoW Guideline of GETCO GoG.pdf
38.Joint venture agreement format.pdf
39.POA For JV Agreement format.pdf
40. EMD BG Format.pdf
41. SD cum PBG Format.pdf
42. Form for Networth Annual turnover LA.pdf
43. ONLINE SCHEDULE_TECH.pdf
44. Online Schedule-QR.pdf
Corrigendum No. 1 E-471 Date Extension.pdf
CORRIGENDUM
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].