Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Tender Value
₹15.9 Cr
EMD Value
₹15.9 L
Closing Date
27 Sept 2022, 4:30 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Project Director, APRRP and Engineer-In-Chief
Engineer-In-Chief, PR, M.G.Road, Vijayawada.
Construction of Bridge across Hundri river and road from Gorantla to Kothapalli (V) of Kodumuru ( M ) in Kurnool District, 44 (B)/ APRRP/ PRED/KRNL/ BRIDGE/001. 5th ( 1st call after recasting the rates with SSR 2022-23)
2022_APRED_712017_1
IFB NO 112/APRRP/PRED/2022-2023, Dated.11.08.2022
Open Tender
Civil Works - Bridges
Percentage
730 days
Gorantla
AS PER SBD
3 documents required · 3 mandatory
₹0
₹15.9 L
Yes
Kurnool
7 Feb 2023
14 Sept 2022
30 Sept 2022
14 Sept 2022
27 Sept 2022
14 Sept 2022
14 Sept 2022 - 27 Sept 2022
19 Sept 2022
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Road Portion | |||||
| 1.01 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201 MORD . including contractors profit & Over head charges, but excluding GST seigneorage charges etc., complete. | 14,565 | 1 Sqm | 2.47 | ₹35,975.55 |
| 1.02 | Scarifying existing granular surface to a depth of 50 mm and spreading scarified material in uniform layers with Tractor grader and compacting with Vibratory Roller to achieve the desired density as per Technical Specification Clause 301.9 of MORD ,including contractors profit & Over head charges, but excluding GST etc., complete. | 14,568.75 | 1 Sqm | 33.62 | ₹4,89,801.37 |
| 1.03 | Construction of embankment with approved material obtained from borrow pits with all lifts, transporting to site, spreading, grading to required slope and compacting with vibratory roller 80-100 KN to meet requirement of Tables 300.1 and 300.2 with a lead upto 1000 m as per Technical Specification Clause 301.5 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete. | 16,141.63 | 1 Cum | 225.96 | ₹36,47,362.71 |
| 1.04 | Construction of granular sub-base by providing well graded material(Table 400.1-A) with Grading III Material(HBG M/C +Stone dust) CBR Value not less than 20 and PI Value less than 6 spreading in uniform layers with Tractor grader on prepared surface, mixing by mix in place method with rotavator at OMC, and compacting with Vibratory Roller to achieve the desired density, complete as per Technical Specification Clause 401 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete. | 1,922.43 | 1 Cum | 1,748.28 | ₹33,60,945.92 |
| 1.05 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the material with water at OMC in mechanical mixer (Pug Mill), carriage of mixed material by tipper to site, laying in uniform layers in sub-base/base course on a well prepared sub-base and compacting with Vibratory Roller 80-100 kN weight to achieve the desired density including lighting, barricading and maintenance of diversion, etc as per Tables 400.11 & 400.12 and Technical Specification Clause 406 MORD, including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete | 2,496.56 | 1 Cum | 2,497.94 | ₹62,36,257.09 |
| 1.06 | Providing and applying primer coat with bitumen emulsion (SS-1) on prepared surface of granular base including cleaning of road surface and spraying primer at the rate of 0.70-1.0 kg/sqm using mechanical means as per Technical Specification Clause 502 MORD (for use on Wet mix macadam & WBM) ,including contractors profit & Over head charges, but excluding GST etc., complete for Prime Coat | 15,228.75 | 1 Sqm | 90.81 | ₹13,82,922.79 |
| 1.07 | Providing and applying tack coat with Bitumen emulsion (RS-1) using emulsion distributor at the rate of 0.25 to 0.30 kg per sqm on the prepared granular surfaces treated with primer & cleaned with Hydraulic broom as per Technical Specification Clause 503 MORD, including contractors profit & Over head charges, but excluding GST etc., complete for Tack Coat | 16,616.25 | 1 Sqm | 15.62 | ₹2,59,545.82 |
| 1.08 | Providing and laying Semi dense bituminous concrete with 40-60 TPH batch type HMP producing an average output of 37.5 tonnes per hour using crushed aggregates of specified grading, (Grading II using 9.50mm nominal size) premixed with bituminous binder @ 5% of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORD specification clause No. 509 complete in all respects, including overhead charges & Contractors profit but excluding GST and Seignorage Charges etc., complete for finished item of work. | 380.72 | 1 cum | 10,262.71 | ₹39,07,218.95 |
| 1.09 | Construction of un-reinforced, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS : 383, maximum in a concrete mixer of not less than 0.2 cum capacity and appropeiate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 mictron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with sholvels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and construction joints, applying debonding strips, primer, sealant, admixtures as approved, curing of concrete slabs for 14- days, curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501 MORD including contractors profit & Over head charges, but excluding GST and seigniorage etc., complete For 170mm thick with 3.25m joint spacing. | 450.5 | 1 Cum | 6,666.03 | ₹30,03,046.51 |
stage.html
html • 0.03 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
BOQ_749037.xls
BOQ Document • 0.45 MB
105191033.pdf
Tender Document • 0.25 MB
Drawings.pdf
Tender Document • 1.65 MB
SBD.pdf
Tender Document • 3.61 MB
105191035.html
Tender Document • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .