Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.2 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹2.2 L+₹3,534.41 (1.64%)Rejected-Finance ORIYARA HOUSE MAVILAKADAPURAM KASARAGOD PIN 671312 | KASARAGOD | KERALA | 671312 | L2 | Rejected-Finance L2 | |
| 3 | L3₹2.3 L+₹10,139.21 (4.71%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹2.3 L+₹12,046.92 (5.59%)Rejected-Finance VIJAY BHAVAN PUNNAVILAKAM VETTU ROAD PALLIPPURAM KANIYAPURAM P O TRIVANDRUM 695301 | TRIVANDRUM | THIRUVANANTHAPURAM | KERALA | 695301 | L4 | Rejected-Finance L4 |
| Sl No | Description | Qty | Unit | M J KURIAN L3 | Manoj Varkey L1 | RAJESH K L2 | VIJAYAKUMAR M L4 |
|---|---|---|---|---|---|---|---|
| 1.00Kinanoor Anganvadi | |||||||
| 1.00 | 5.1.2:Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level:1:1:5:3 (1 cement 1.5 coarse sand :3 graded stone aggregate 20 mm nominal size derived from natural sources) | 1.1 | cum | 8,884.44 ₹9,799.54 | 8,503.9 ₹9,379.8 Lowest | 8,623.76 ₹9,512.01 | 8,959.44 ₹9,882.26 |
| 1.00 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 66.18 | kilogram | 95.22 ₹6,301.66 | 91.15 ₹6,032.31 Lowest | 92.43 ₹6,117.02 | 96.03 ₹6,355.27 |
| 1.00 | 5.9.1:Centering and shuttering including strutting, etc. and removal of form for:Foundations, footings, bases of columns, etc for mass concrete | 11.03 | sqm | 327.09 ₹3,607.8 | 313.08 ₹3,453.27 Lowest | 317.5 ₹3,502.03 | 329.85 ₹3,638.25 |
| 1.00 | 10.25.1:Item Shifted to Sub head 14 as item 14.73
Item Shifted to head 14 as item 14.74
Steel work welded in built up sections/framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required.In stringers, treads,landings etc. of stair cases, including use of chequered plate wherever required, all complete | 699.6 | kg | 108.62 ₹75,990.55 | 103.42 ₹72,352.63 Lowest | 105.44 ₹73,765.82 | 109.54 ₹76,634.18 |
| 1.00 | 13.61.1:Painting with synthetic enamel paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 625.39 | sqm | 139.64 ₹87,329.18 | 133.58 ₹83,539.33 Lowest | 135.55 ₹84,771.34 | 140.82 ₹88,067.14 |
| 1.01 | 13.1.1:12 mm cement plaster of mix:1:4 ( 1 cement : 4 fine sand) | 92.38 | sqm | 313.2 ₹28,931.85 | 299.79 ₹27,693.1 Lowest | 304.02 ₹28,083.85 | 315.85 ₹29,176.64 |
| 1.01 | 13.60.1:Wall painting with acrylic emulsion paint of approved brand and manufacture to give an even shade:Two or more coats on new work | 92.38 | sqm | 146.43 ₹13,526.47 | 139.62 ₹12,897.4 Lowest | 142.14 ₹13,130.18 | 147.67 ₹13,641.02 |
Tender Value
₹2.5 L
EMD Value
₹6,261
Closing Date
15 Oct 2025, 6:00 pmClosed
ASSISTANT ENGINEER
LSGD KINANOOR KARINTHALAM GP
COMPOUND WALL CONSTRUCTION FOR BIRIKKULAM ANGANVADI IN KINANOOR KARINTHALAM GP-PR.NO. 97/25-26
2025_LSGD_801726_1
AE/LSGD/KKGP/2/TN/25-26/PRO. NO.97
Open Tender
Civil Works - Others
Item Rate
KARINTHALAM
Please refer Tender documents.
7 documents required · 7 mandatory
₹555
Yes
₹6,261
Yes
21 Nov 2025
7 Oct 2025
18 Oct 2025
7 Oct 2025
15 Oct 2025
7 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .