Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.5 CrAccepted-AOC 0 0 BAMUNPARA VILLAGE TOWN BALITIKURI CITY HOWRAH HOWRAH WEST BENGAL 711113 INDIA | HOWRAH | WEST BENGAL | 711113 | ₹1.5 Cr | L1 | Accepted-AOC L1 Bidder |
| 2 | L2₹2.0 Cr+₹48.1 L (31.2%)Rejected-AOC | ₹2.0 Cr+₹48.1 L (31.2%) | L2 | Rejected-AOC L2 Bidder |
| 3 | L3₹2.0 Cr+₹48.7 L (31.6%)Rejected-AOC A 45 NTPC VIDYUT NAGAR DADRI GB NAGAR 201008 | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201008 | ₹2.0 Cr+₹48.7 L (31.6%) | L3 | Rejected-AOC L3 Bidder |
| 4 | L4₹2.4 Cr+₹86.9 L (56.4%)Rejected-AOC | ₹2.4 Cr+₹86.9 L (56.4%) | L4 | Rejected-AOC L4 Bidder |
| Sl No | Description | Qty | Unit | APEX PROJECTS L2 | CHANDA CONSTRUCTION CO. L4 | POWERTECH ENGINEERING CO L3 | Universal Engineering Company L1 |
|---|---|---|---|---|---|---|---|
| 1.00Part A | |||||||
| 1.01 | Part-A activities:- General/routine/preventive maintenance by engagement of adequate labour as per scope of work of Part-A at Annexure-IV | 48 | Months | 3,15,555 ₹1,51,46,640 | 3,89,500 ₹1,86,96,000 | 2,38,450 ₹1,14,45,600 | 2,32,200 ₹1,11,45,600 Lowest |
| 2.00Part B | |||||||
| 2.01 | Mobilization & attending the boiler tube leakage including cutting, welding, fit-up, and grinding and replacement of tube of all sizes and thickness of boiler upto 10 nos. joints. 3 Nos. Metal Build Up will count as one joint. | 16 | Job | 27,700 ₹4,43,200 | 18,500 ₹2,96,000 Lowest | 20,250 ₹3,24,000 | 18,910 ₹3,02,560 |
| 2.02 | Mobilization & attending the boiler tube leakage including locking of furnace base (platform) at 11 mtr. Manhole and jhula with the help of winch machine arrangement by cutting, welding, fit-up, and grinding and replacement of tube of all sizes and thickness of boiler tube upto 10 nos. joints in divisional panel at 60 mtr. height in 1st pass. 3 Nos. Metal Build Up will count as one joint. | 8 | Job | 500 ₹4,000 Lowest | 38,500 ₹3,08,000 | 30,120 ₹2,40,960 | 25,810 ₹2,06,480 |
| 2.03 | Attending boiler tube leakage/ tube replacement including cutting, welding, fit-up, grinding and welding of one no. Joints of tube of all sizes and any thickness of boiler in addition to above Sr. No. at 1&2. | 50 | Job | 800 ₹40,000 | 875 ₹43,750 | 850 ₹42,500 | 630 ₹31,500 Lowest |
| 2.04 | Metal build up on worn out boiler tubes half round surface by HP welder up to 100 mm length (Two minor built up = 100 mm). | 300 | Job | 300 ₹90,000 | 275 ₹82,500 | 250 ₹75,000 | 172 ₹51,600 Lowest |
| 2.05 | Attending leakage or other welding work of HP Joints on outside the boiler including replacement of pipe up to 1 Mtr. Length / valve / bends by cutting, welding, grinding and fit-up work for each joint. | 20 | Job | 400 ₹8,000 | 300 ₹6,000 | 110 ₹2,200 | 91 ₹1,820 Lowest |
| 2.06 | Fin welding work on water wall tubes by IBR welder. | 50 | Mtr | 275 ₹13,750 | 200 ₹10,000 | 220 ₹11,000 | 154 ₹7,700 Lowest |
| 2.07 | Lifting and lowering & refixing of economizer module / LTSH module for maintenance purpose (excluding any HP joints). | 8 | Job | 2,500 ₹20,000 | 7,800 ₹62,400 | 2,500 ₹20,000 | 2,127 ₹17,016 Lowest |
Tender Value
Refer Docs
EMD Value
₹3.0 L
Closing Date
17 Apr 2026, 5:00 pmClosed
HARINDER MOHAN SINGH
CE DCRTPP Yamuna Nagar
ARC for maintenance of Boiler and Auxiliaries i.e. Pressure Parts, H.P Valves, Firefighting System and Pumps etc. of 2x300 MW, Unit-I and II, DCRTPP, Yamuna Nagar
2026_HBC_508031_1
202679CD3C78 6BA7 4F24 B6E6 D4EEE46AA8DB711PGC
Open Tender
Power/Energy Projects/Products
Works
730 days
RATTANPURA
As Per NIT
2 documents required · 2 mandatory
₹1,180
₹3.0 L
Yes
10 Jul 2026
12 Mar 2026
22 Apr 2026
12 Mar 2026
17 Apr 2026
13 Mar 2026
12 Mar 2026 - 16 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part A | |||||
| 1.01 | Part-A activities:- General/routine/preventive maintenance by engagement of adequate labour as per scope of work of Part-A at Annexure-IV | - | Months | - | - |
| 2Part B | |||||
| 2.01 | Mobilization & attending the boiler tube leakage including cutting, welding, fit-up, and grinding and replacement of tube of all sizes and thickness of boiler upto 10 nos. joints. 3 Nos. Metal Build Up will count as one joint. | - | Job | - | - |
| 2.02 | Mobilization & attending the boiler tube leakage including locking of furnace base (platform) at 11 mtr. Manhole and jhula with the help of winch machine arrangement by cutting, welding, fit-up, and grinding and replacement of tube of all sizes and thickness of boiler tube upto 10 nos. joints in divisional panel at 60 mtr. height in 1st pass. 3 Nos. Metal Build Up will count as one joint. | - | Job | - | - |
| 2.03 | Attending boiler tube leakage/ tube replacement including cutting, welding, fit-up, grinding and welding of one no. Joints of tube of all sizes and any thickness of boiler in addition to above Sr. No. at 1&2. | - | Job | - | - |
| 2.04 | Metal build up on worn out boiler tubes half round surface by HP welder up to 100 mm length (Two minor built up = 100 mm). | - | Job | - | - |
| 2.05 | Attending leakage or other welding work of HP Joints on outside the boiler including replacement of pipe up to 1 Mtr. Length / valve / bends by cutting, welding, grinding and fit-up work for each joint. | - | Job | - | - |
| 2.06 | Fin welding work on water wall tubes by IBR welder. | - | Mtr | - | - |
| 2.07 | Lifting and lowering & refixing of economizer module / LTSH module for maintenance purpose (excluding any HP joints). | - | Job | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.64 MB
BOQ_586800.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .