| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹71.4 LAccepted-Finance | ₹71.4 L | L1 | Accepted-Finance Ok |
| 2 | L1₹71.4 LAccepted-Finance CUTTACK CUTTACK ODISHA | CUTTACK | ODISHA | 752120 | ₹71.4 L | L1 | Accepted-Finance Ok |
| 3 | L1₹71.4 LAccepted-Finance WARD 9 P O P S RAGHUNATHPALI DIST SUNDARGARH ODISHA 769004 | RAGHUNATHPALI | SUNDARGARH | ODISHA | 769004 | ₹71.4 L | L1 | Accepted-Finance Ok |
| 4 | L1₹71.4 LAccepted-Finance | ₹71.4 L | L1 | Accepted-Finance Ok |
| 5 | L1₹71.4 LAccepted-Finance | ₹71.4 L | L1 | Accepted-Finance Ok |
Tender Value
₹71.4 L
EMD Value
₹71,381
Closing Date
11 Aug 2026, 5:00 pmClosed
BDO, Gurundia
Panchayat Saniti Office AT/PO/PS- Gurundia
Construction of Kalyan Mandap at Gurundia
2026_PRGU_136282_1
02/2026-27 GURUNDIA
Open Tender
Civil Works - Buildings
Percentage
270 days
Gurundia
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
BDO Gurundia
₹71,381
Yes
14 Aug 2026
22 Jul 2026
12 Aug 2026
22 Jul 2026
11 Aug 2026
22 Jul 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Ground Floor | - | - | - | - |
| 2 | CIVIL WORKS | - | - | - | - |
| 3 | Earth Work : AR0102aa (Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift) : Earth work in hard soil or gravelly soil foundation & plinth within 50m. Initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.3m in depth and as per the direction of the Engineer-in-charge | 211.3 | Cubic Meter | 282.89 | ₹59,772.55 |
| 4 | Earth Work : AR0115 (Filling foundation and plinth with sand well watered and rammed) : Filling foundation and plinth with sand well watered and rammed including cost, conveyance, royalty, taxes of all materials, labours and T & P required for the work etc. complete and as per direction of Engineer-in charge. | 240.01 | Cubic Meter | 870.2 | ₹2,08,854.51 |
| 5 | Concrete : AR0303 (Cement concrete (1:3:6) with 4 cm. Crusher Broken hard granite metal) : Cement concrete (1:3:6) with 4 cm. hard granite(Crusher Broken) metal including laying in layers not exceeding 300 mm in depth, ramming, compacting to proper thickness, watering and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete and as per direction of Engineer-in charge. | 50.35 | Cubic Meter | 6,639.81 | ₹3,34,306.23 |
| 6 | Concrete : AR0307 (Cement concrete (1:2:4)with 12mm size hard broken granite chips per 1cum) : Cement concrete work with (1:2:4) using 12mm size hard granite(crusher broken) chips including hoisting and laying in position compacting to specified design section and curing for proper period with cost conveyance, royalty, taxes of all materials, labour and T&P required for the work etc. complete as per specificaion and direction of Engineer-in charge. | 5.68 | Cubic Meter | 8,219.38 | ₹46,646.33 |
| 7 | Masonry Brick Work : AR0603c (Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in foundation and plinth) : Brickwork with Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. | 56.73 | Cubic Meter | 5,688 | ₹3,22,655.55 |
| 8 | Masonry Brick Work : AR0603ci (Flyash Bricks of size (25cm x 12cm x 8cm) in cement mortar (1:6) in superstructure) : Brickwork with Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:6) in superstructure having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. | 89.63 | Cubic Meter | 5,726.33 | ₹5,13,250.45 |
| 9 | Masonry Brick Work : AR0602c (Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:4) in foundation and plinth) : Brickwork with Flyash Bricks of size (23cm x 11cm x 8cm) in cement mortar (1:4) in foundation and plinth having crushing strength not less than 75.00 Kg/cm2 with dimensional tolerance ±8 percent immersing the bricks in water not less than six hours with cost conveyance, royalty, taxes of all materials, labor, and T&P required for the work, etc. complete and as per direction of Engineer-in-charge. | 5.27 | Cubic Meter | 5,982.16 | ₹31,533.62 |
| 10 | R.C.C. Work : AR0409 (Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position) : Supplying, fitting, and placing uncoated HYSD bar reinforcement including labor charges for cutting, bending, binding, and tying the grills and placing in position including cost of binding wire 18 to 20 gauge with cost of steel rod and as per drawing, design, and direction of Engineer-in-charge. | 181.5 | Quintal | 8,595.38 | ₹15,60,061.68 |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.32 MB
BOQ_602375.xls
BOQ • 0.35 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].