Loading…
Loading…
Tender Value
₹7.2 L
EMD Value
₹7,231
Closing Date
9 Jul 2026, 3:15 pmClosed
GUNTUR MUNICIPAL CORPORATION
Guntur
Repair Works in NTR Sruthivanam municipal park in Div.No.01 under AE-11 Section.
950778
ET NO.19/2026-27 Item No.11
OPEN - NCB
Civil Works
GUNTUR, ANDHRA PRADESH
1 document required · 1 mandatory
₹256
₹7,231
25 Jun 2026
25 Jun 2026
25 Jun 2026
Engaging of the Angle Dozer 90 hp for Removing the side berms including driver, fuel with all type of necessary charges etc.,
Engaging of the Tractors for Loading and unloading including cost of fuel, driver with all type of necessary charges etc., complete as per SS
Earthwork excavation in Ordinary soil by Manual Means upto 3 m depth for structures as per drawing and technical specifications Clause 305.1 including setting out, construction of shoring and bracing, removal of stumps and other deleterious material and disposal upto a lead of 50 m, dressing of sides and bottom and backfilling in trenches with excavated suitable material as per Technical Specification 305 MORD / 304 MORTH (RBR-FNDN-1(A)) - 1 Cum
Filling of Red Earth for foundation trenches including cost and conveyance off all materials and all labour charges ramming,watering etc, as per drawing and technical specification in Clause 305.3.9 MORD & 304 MORTH
Filling of Sand for foundation trenches including cost and conveyance off all materials and all labour charges ramming,watering etc, as per drawing and technical specification in Clause 305.3.9 MORD & 304 MORTH
Providing concrete for plain/reinforced concrete (M10) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH.
Providing concrete for plain/reinforced concrete (M20) in open foundations using 20 mm Graded hard stone aggregate , mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days complete as per drawings and technical specifications Clause 802, 803, 1202 & 1203 MORD and 1500, 1700 & 2100 MORTH. For Above 600 mm Bed (M20)
DOUBLE ARCH SWING Arc swing frame: 75OD or 90OD pipe bend insingle piece & flat welded together with a flange 5mm thick & ISA of 8 x 3 x 8.5 L.W.H to form a strong frame at bottom and middle. The pipe is hot dip galvanized pipe conforming to IS 1239with GI thickness of 60mm dia. Heightof the frame is 2700mm. Top Pipe: 50NB Top pip with two arc swing glances welded at both its ends. Pipe can with standing torsional tress created due to swinging motion the 50NB top pipe is hot dip galvanized are supported by 20 NB pipes. The Slide ladder is made up of 75 or 90 OD G.I. Pipe & ladder hand – railing is made up of 25 NB G.I. Pipe. The triangular steps of the ladder are made up of 16 SWG G. I. Sheets. The safety railing of the slide is made up of15 NB & 20 NB G. I. Pipe. The trader sand risers of the ladder are designed insuch a way it won’t entrap child’s foot while playing. All the sharp edges and corners are properly grinded to give smooth finish so that children are not hurt while playing on it. 2) ) Nut and Bolts: Galvanized/ s.s./ Allen bolt/button head Allen bolt and nuts/nylon lock nuts are used with PVSbolt caps. 3) ) Material: Fibre Reinforced Plastic)with anti-skid surface on top 4) FRP (Fibre reinforced plastic): All the fibre reinforced plastic materials areprocessed by the hand laid process which is considered to be the best of itstype. International quality of Gel coats which is duly mixed with UV stabilizespigment to give the required colour to the product. Thickness of the FRP material varies from 3mm to 5mm as per the product. The FRP material should be tested for abrasion resistance & UTS (Ultimate tensile test). 5) All metal pipes should be used heavyduty of Tata/Jindal make only with hot dipped galvanized pipes. 6) Colour: Multicolour for optional orcustomized and as per RAL shade.
ORBITAL CLIMBING support pipe made by 42OD hot dipped galvanized pipe of Height 1524mm with GI thickness 2.5 to 3.00mm up to 60micron. The frame made from 32, 25, 20, 15,GI pipe Top Pipe: pipe top & horizontal pipe fixed to galvanizes pipe at the center and two junction box frame at the ends to attachleg pipes.
SPIRAL SLIDE Pipes: Material Specification: The Spiral Slide is made up of Fiber Reinforced Plastic (FRP) in 3 parts withholding having shell thickness of 3 to 4mm. The slide is supported on a centersupport of 80 NB pipes. The landings supports of the slide than 3.00mm, pedel link pipe shall be minimum of 50mm NB dia of thickness not less than 2.5mm, handle frame pipes shall be minimum of 32mm NB dia of thickness not less than 2.5mm and handle grips shall be minimum of 25mm NB dia of thickness not less than 2.5mm are of heavy grade of TATA/JINDAL make with hot dipped galvanized with joint with Mig welded. The pedal frame are hinged over 80NB prime stand pipe with the help of specially heavy duty SKF bearings should be reputed make and press fitted for smooth rotation, and does not require re-lubrication i.e., maintenance - free ball bearing. Foot rest shall be made of Aluminum material. All open ends of pipes, bearings, bushes and Base cover shall be closed by SS 304 grade Stainless Steel for safety against entrapment, corrosion & water resistant. The foundation pipe with anchoring shall be 750mm deep with minimum of 100mm NB dia supported with M.S. Angle 25X25X4mm.
Dimension L1250 x B400 x H1850 mm Main pipe - MS Round 114 mm OD & 3 mm thickness Handle pipe - MS Round 38mm & 31mm OD Foot rest base pipe - MS flat 60x40 mm Foot Rest Size- L305 x B140 mm (12”x5.5”) Rubber grip on the handle Base made of 8mm MS plate and has plastic cover Has rubber seal bearing system for smooth working. All alloy & pipe ends are covered with S.S cover Has best quality Powder coating.cross trainer
SEE SAW Four Seater See Saw: 4 No’s Seats made with FRP Fibre Seats or LLDPE and fitted both ends of 50mm dia pipe length 8ft with bolts and nuts and both fitted on Horizontal pipe Centre Main Frame Structure: 80NB hot dip galvanized pipes Pipes: All metal pipes should be used heavy duty of Tata/Jindal make only with hot dipped galvanized. Powder Coating: It will be done with pure polyester raw material. Dry film thickness maintained within the range of 50-70microns. Nut and Bolts: Galvanized/ s.s./ Allen bolt/button head Allen bolt and nuts/nylon lock nuts are used. Bearing: Bearings is self-lubricated made of SKF/NTN/ Nachi make shall be provided for smooth and trouble freemovement.
FITNESS WALKER Prime stand pipe shall be minimum of 80mm NB dia of thickness not less pipe of length 2950mm conforming to IS 1239 with GI thickness of 60. 3)Sweat Assembly: a) Swing clamp assembly: Swing clamps made up of two parts are joining together with M6 Allen Bolts along with S hook is specially designed swing pin. Hook: S-Hook of Dia 8mm & 145 x130 triangular hook of grade SS 304 Chain: Rubber dip moulded swing chain of dia.
Manufacture, Supply and Delivery of Unplasticised PVCs Pipes for potable water supplies conforming to IS : 4985/2000 (3rd revision) with bell ends (Socket) as per specification in light Grey/Natural Ivory Grey/ Any other Color (except White) inclusive of transportation to the sub-divisional stores anywhere in AP excluding all taxes. 160mm dia pvc pipe
Provision for Seignorage Charges
Towards Merit 2% on Seignorage Charges
Towards Consideration amount 100% Seignorage Charges
Towards DMF 30% on Seignorage Charges
Provision for NAC @ 0.10%
Provision for GST @ 18%
Provision for TPQA @ 0.739 %
Unforeseen item
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.01 MB
Item No 11.xlsx
TENDER_DOCUMENT • 0.07 MB
Notice Inviting Tender .docx
TENDER_DOCUMENT • 0.05 MB
Tender Document1.doc
TENDER_DOCUMENT • 0.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .