| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.3 LAdmitted-Finance | ₹4.3 L | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M.K. ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Operation & maintenance of tube wells/ Open Wells: Regular operation of tube wells installed with pumping machineries with round the clock monitoring, including complete repair and maintenance of pump set with cost of material and labour required for repairing/rewinding, lowering and un-lowering etc. The scope of work also includes repair and maintenance of panel board, main switches, kit-Kates, Electric connections, service cable and submersible cables inclusive of cost of material and labour required for uninterrupted functioning of tube wells. It is also inclusive of complete repair and maintenance of pipes connected with pump and motor, its replacement, if required, regular upkeeping of log book etc. and other works as mentioned in tender document / scope of work complete in all respect and as directed by engineer in-charge. | 48 | per well per month | 1,480 ₹71,040 Lowest |
| 2.00 | Operation & maintenance of pump houses: Regular operation and maintenance of pump houses located at WSS Complex/Complexes. The work includes operation of distribution line main valves for daily supply of water of the Industrial Area at supply times specified by corporation. Regular Operation of pump house installed with existing centrifugal / Monoblock pump / motors, with round the clock monitoring, including complete repair and maintenance of pump sets, connecting suction/delivery pipes jointing material, panel, main switches, kit-Kates, Electric connections, service cable including cost of material and labour required for repairing / rewinding, removal and replacement etc. for uninterrupted functioning of Electric Panels and Pump sets with regular up-keepment of log books, repair of leakages in pump glans and MS/CI/AC Pipeline system inside of WSS Campus complete, Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus complete in all respect as directed by Engineer in-charge. | 24 | per pump house per month | 1,560 ₹37,440 Lowest |
| 3.00 | Maintenance of Distribution / Rising Main Pipe Line Network : Repair & maintenance of existing distribution / rising main pipe line system consisting of AC Pressure Pipeline/PVC/uPVC/HDPE/CI/ DI Lines for maintaining smooth water supply in area covered under the scope of work. The scope of work includes timely repairing of leakage in all existing distribution / rising main pipeline of all sizes by digging out suitable size of pit in soft & loose soil / hard soil including cutting of Bituminous / Cement Concrete / WBM / WMM surface at any site of work at no extra cost. It is also inclusive of cutting of pipe ends, fixing of pipe pieces with jointing material to make repair leak proof and refilling the pit / trench by excavated soil by ramming it at all sides of pipes & upto ground level. Contractor will do dewatering at his own level by making necessary arrangements, if required. Contractor will use their own T&P and jointing materials, however the pipe line and sluice valves (if required) etc. shall be provided by the Corporation but the contractor shall have to deposit the damaged material in RIICO store. But no additional payment shall be made on account of any material or transportation charges. | 24 | complete job per month | 13,400 ₹3,21,600 Lowest |
Tender Value
₹4.4 L
EMD Value
₹8,784
Closing Date
19 Aug 2026, 6:00 pmClosed
Unit Head RIICO Kota
RIICO Office, Road NO. 5, IPIA near Gobaria Babri Kota
As per BoQ
2026_RIICO_586709_4
33/2026-27(4)/2370-75
Open Tender
Civil Works
Percentage
730 days
RIICO Industrial area Gundi Fatehpur Kota
As per Tender Document
3 documents required · 3 mandatory
₹590
RIICO head office payment gateway
₹8,784
27 Aug 2026
13 Aug 2026
20 Aug 2026
13 Aug 2026
19 Aug 2026
13 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Operation & maintenance of tube wells/ Open Wells: Regular operation of tube wells installed with pumping machineries with round the clock monitoring, including complete repair and maintenance of pump set with cost of material and labour required for repairing/rewinding, lowering and un-lowering etc. The scope of work also includes repair and maintenance of panel board, main switches, kit-Kates, Electric connections, service cable and submersible cables inclusive of cost of material and labour required for uninterrupted functioning of tube wells. It is also inclusive of complete repair and maintenance of pipes connected with pump and motor, its replacement, if required, regular upkeeping of log book etc. and other works as mentioned in tender document / scope of work complete in all respect and as directed by engineer in-charge. | - | per well per month | 3,000 | - |
| 2 | Operation & maintenance of pump houses: Regular operation and maintenance of pump houses located at WSS Complex/Complexes. The work includes operation of distribution line main valves for daily supply of water of the Industrial Area at supply times specified by corporation. Regular Operation of pump house installed with existing centrifugal / Monoblock pump / motors, with round the clock monitoring, including complete repair and maintenance of pump sets, connecting suction/delivery pipes jointing material, panel, main switches, kit-Kates, Electric connections, service cable including cost of material and labour required for repairing / rewinding, removal and replacement etc. for uninterrupted functioning of Electric Panels and Pump sets with regular up-keepment of log books, repair of leakages in pump glans and MS/CI/AC Pipeline system inside of WSS Campus complete, Regular chemical dosing in CWR maintaining general cleanliness at pump house and WSS Campus complete in all respect as directed by Engineer in-charge. | - | per pump house per month | 2,300 | - |
| 3 | Maintenance of Distribution / Rising Main Pipe Line Network : Repair & maintenance of existing distribution / rising main pipe line system consisting of AC Pressure Pipeline/PVC/uPVC/HDPE/CI/ DI Lines for maintaining smooth water supply in area covered under the scope of work. The scope of work includes timely repairing of leakage in all existing distribution / rising main pipeline of all sizes by digging out suitable size of pit in soft & loose soil / hard soil including cutting of Bituminous / Cement Concrete / WBM / WMM surface at any site of work at no extra cost. It is also inclusive of cutting of pipe ends, fixing of pipe pieces with jointing material to make repair leak proof and refilling the pit / trench by excavated soil by ramming it at all sides of pipes & upto ground level. Contractor will do dewatering at his own level by making necessary arrangements, if required. Contractor will use their own T&P and jointing materials, however the pipe line and sluice valves (if required) etc. shall be provided by the Corporation but the contractor shall have to deposit the damaged material in RIICO store. But no additional payment shall be made on account of any material or transportation charges. | - | complete job per month | 10,000 | - |
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.65 MB
BOQ_1042103.xls
BOQ • 0.36 MB
newwssss.pdf
Tender Documents • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .