| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹82.1 LRejected-Finance 194 1 MATA WALA BAGH PURANI TEHSIL ROORKEE HARIDWAR UTTARAKHAND 247667 | HARIDWAR | UTTARAKHAND | 247667 | L1 | Rejected-Finance work did not start | |
| 2 | L2₹83.1 L+₹1.0 L (1.26%)Rejected-Finance | L2 | Rejected-Finance work did not start |
Tender Value
₹80 L
EMD Value
₹1.6 L
Closing Date
15 Apr 2023, 2:00 pmClosed
SE
MBD
VRB 11.300
2023_UPIDC_796134_1
02/SE/2022-23
Open Tender
Civil Works - Bridges
Item Wise
180 days
amroha
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹1.6 L
22 Dec 2023
10 Apr 2023
15 Apr 2023
10 Apr 2023
15 Apr 2023
10 Apr 2023
Amount
Earth work in excavation in foundation of Bridge etc. in ordinary soil excavation to be in the form of regular Pits and Earth Work in embankment to be in 20cm. layer including ramming and dressing the surface to the required levels and slopes. and also including 30 m lead and all lifts the earth from cutting to be used in making Canal Section or to be deposited in Spoil Bank as per direction of Engineer in charge in the section
Laying Cement concrete in M-10 1:3:6 including all costs of T&P material required for proper completion of work.
Laying R.C.C. in M-20 1:1.5:3 in Toe wall Transitions sleepers lining etc. including all costs of T&P material required for proper completion of work.
Laying R.C.C. in M-25 1:1:2 in Raft wall bridge, wearing Coat etc. including all costs of T&P material required for proper completion of work.
Laying Cement concrete in M-15 1:2:4 including all costs of T&P material required for proper completion of work.
Centering and shuttering for C.C. works in peir abutment including cost of all labour and T&P etc. complete.
Centering and shuttering for ordinary R.C.C. works including cost of all labour and T&P etc. complete.
Centering and Shuttering for Special type of R.C.C. works including cost of all labour and T&P etc. complete.
Laying of reinforcement in R.C.C including Cutting, Bending, Binding and Placing etc. Including cost of all labour and T&P etc. Complete.
S/L Settlement Joint with G.P./ Copper/Stainless Steel water stop including cost of all labour and T&P etc. Complete.
Providing Brick pitching including cost of all labour and T&P etc. Complete.
S/F 60 cm. long 50 mm dia P.V.C. Pipe Spout including cost of all labour and T&P etc. Complete.
Filling up sealing compound or making contraction joint including cost of all labour and T&P etc. Complete.
Providing & Fixing 150 mm wide water stop seal including cost of all labour and T&P etc. Complete.
Earth work in filling for Ramp lifting the level of roads upto the VRB levels including Cost of all labour and T&P etc. Complete.
Earth work in filling for making Diversionincluding Cost of all labour and T&P etc. Complete.
Providing Brick on edge Soling for Diversion Including cost of all labour and T&P etc. Complete.
Making wall & for stopping traffic in M- 100 B/W in 1:6 Cement mortar cost of all labour and T & P etc. Complete for diversion.
Dismantling of existing Road Including cost of all labor and T&P etc. Complete.
Dismantling of brick on edge soling from diversion including cost of all labour and T&P etc. Complete.
Disposal of earth from the Road of diversion including cost of all labour and T&P etc. Complete.
Making and fixing sign board at site of work. including cost of all labour and T&P etc. Complete.
S/Laying and consolidation of 150 mm thick stone ballast (40-90) including cost of material, all labour and T&P etc. Complete.
S/Laying and consolidation of 150 mm thick stone ballast (40-63) including cost of material, all labour and T&P etc. Complete.
S/Laying and consolidation of 120mm thick stone ballast (22,4-53) including cost of material, all labour and T&P etc. Complete.
Laying first coat bitumen painting over wbm with 10-20 stone grit including cost of material, all labour and T&P etc. Complete.
Laying 2nd coat bitumen painting over wbm with 10-20 stone grit including cost of material, all labour and T&P etc. Complete.
Providing /laying seal coat over road including cost of material, all labour and T&P etc. Complete.
J.M.D. Associates
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .