Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.7 LAccepted-AOC | ₹11.7 L | L1 | Accepted-AOC Minimum Amount |
| 2 | L2₹12.6 L+₹93,956 (8.05%)Rejected-Finance | ₹12.6 L+₹93,956 (8.05%) | L2 | Rejected-Finance Low |
| 3 | L3₹13.8 L+₹2.2 L (18.6%)Rejected-Finance | ₹13.8 L+₹2.2 L (18.6%) | L3 | Rejected-Finance High |
| 4 | L4₹14.0 L+₹2.4 L (20.2%)Rejected-Finance | ₹14.0 L+₹2.4 L (20.2%) | L4 | Rejected-Finance Higher |
| 5 | L5₹15.1 L+₹3.4 L (29.0%)Rejected-Finance WARD NO 19 BHAVANI CHOWK WARUD DIST AMRAVATI | WARUD | AMRAVATI | MAHARASHTRA | ₹15.1 L+₹3.4 L (29.0%) | L5 | Rejected-Finance Highest |
Tender Value
₹15.4 L
EMD Value
₹15,377
Closing Date
10 Feb 2026, 4:00 pmClosed
Sub Diviosional Agriculturer Office Morshi
Sub Diviosional Agriculture Office Morshi
Desiliting and Deepening of Old Cement Nala Bandh at Bhembadi Gat No 1 to 3 Ta Warud Dist Amravati
2026_DOA_1272027_1
B1-09 2025-2026 Jalayukt Shivar 2.0
Open Tender
Agricultural or Forestry
Percentage
30 days
At Bhembadi Ta Wrud Dist Amravati
Only for Labour Society in Amravati Dist
2 documents required · 2 mandatory
₹560
₹15,377
Sub Diviosional Agriculture Office Morshi
11 Apr 2026
27 Jan 2026
11 Feb 2026
27 Jan 2026
10 Feb 2026
27 Jan 2026
2 Feb 2026
Side cleaning for excavation work 15x15 sq.mt
Item No. 1: Excavation in all kinds of soil including boulders up to 0.60 m diatemeter (0.113 cum) for canal , seating of embankment, filter drains/catch water drains etc, and placing the excavated stuff neatly in dump area or for formation of service road/ embankment including cost of all material , machinery, labour, dressing bed and sides to required level and profile etc complete with lead up to 15 m and all lifts as directed
Item No. 2: Excavation in hard murum including boulders up to 0.60 m diatemeter (0.113 cum) for canal , seating of embankment, filter drains/catch water drains etc, and placing the excavated stuff neatly in dump area or for formation of service road/ embankment including cost of all material , machinery, labour, dressing bed and sides to required level and profile etc complete with lead up to 15 m and all lifts as directed
Item No. 3: Excavation in soft rock without blasting including boulders up to 0.60 m diatemeter (0.113 cum) for canal , seating of embankment, filter drains/catch water drains etc, and placing the excavated soft rock neatly in dump area or for formation of service road/ embankment including cost of all material , machinery, labour, dressing bed and sides to required level and profile etc complete with lead up to 15 m and all lifts as directed
Soil Transporting
Stone Pittching
Stone Transporting
Item No: Providing Work Board of GI Sheet of Prescribed size 4 x3 Ft at Site Including Painting and Fixing with MS Angle in cement concrete as directed
Item No: Charges For Providing Photo copies of Site at Diff stages, Papers for Completion and Handover the work
Item No: Provision for work insurance charges at 1% of work cost
Item No: Provision for labour wealfear at 1% of work cost
stage.html
html • 0.06 MB
technical_2189968.pdf
techsummary_2189968.pdf
finance_2189968.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.10 MB
tenderdocument.pdf
Tender Documents • 1.08 MB
BOQ_2189968.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .