Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance 26 2 CHENNINTHUM VADAKKU SETHIYATHOPE 608702 BHUVANAGIRI TALUK CUDDALORE DISTRICT TAMIL NADU | SETHIYATHOPE | CUDDALORE | TAMIL NADU | 608702 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹1.5 L
EMD Value
₹3,000
Closing Date
25 May 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Managing Director
M.R.Krishnamurthy Co op Sugar Mills Limited., Sethiyathope - 60 8702
Notice for Scrubbing and Removal of Ash on Labour Contract Basis
2023_TNCSF_311951_1
0805/A2/2023/MRKCSM
Open Tender
Miscellaneous Services
Works
40 days
Sethiyathope
Please refer Tender documents.
1 document required · 1 mandatory
₹0
₹3,000
Yes
26 May 2023
6 May 2023
26 May 2023
6 May 2023
25 May 2023
6 May 2023
Amount
SCRUBBING AND REMOVAL OF ASH FROM THE BOILER TUBES (scope of work and other terms and conditions are furnished in pdf. File) The bidder shall quote the rate on lump sum basis
SCRUBBING AND REMOVAL OF ASH FROM THE BOILER TUBES 1. Construction of Scaffolding at inside the boiler such as furnace, bank tube area and super heater tube area and wherever required for cleaning of tubes externally. 2. The deposited ash should be cleaned in inside and outside of the boiler area, a) Boiler Furnace, b) Super heater Coils Chamber, c) Bang tubes chamber, d) ID Flue gas ducting from boiler outlet to chimney, e) Chimney bottom ash, f) Wet scrubber inside & Outside, g) FD air ducting –outside only, h) SA air ducting outside only, i) Feed water tan & dearator tank outside area only, j) Entire boiler bottom floor Cleaning. 3. The boiler tubes in Front Wall Header, Rear Wall Header, Bank Tubes, Side wall header tubes, Super-heater coils, Economizer coils and furnace are to be thoroughly scrubbed and cleaned free from ash rust scale etc, to make ready the boiler for open inspection by the boiler inspector by using scrapper wire brush and emery sheet etc. 4. The accumulated ash in entire boiler area should be collected and shifted to ash yard as directed by the Dy. Chief Engineer. 5. The scaffolding will be dismantled in the above areas after completion of Boiler Hydraulic Test.
PARTHIPAN LABOUR CONTRACT
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .