| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.4 LAccepted-AOC | ₹8.4 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | Sulthan Bathery Labour Contract and Construction Co.Operative Societey Ltd. L1 |
|---|---|---|---|---|
| 1.00SIDE PROTECTION WALL | ||||
| 1.00 | 15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar | 4.54 | cum | 1,987 ₹9,013.03 Lowest |
| 1.00 | 15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar | 34.12 | cum | 976 ₹33,306 Lowest |
| 1.00 | 2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil | 12.54 | cum | 335 ₹4,200.9 Lowest |
| 1.00 | OD154179/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry
with good quality blasted rubble including packing to compactness to lines and levels
cost and conveyance of all materials labour charges etc. complete as per direction of
Departmental officers at site | 36.62 | cum | 3,727 ₹1,36,464.11 Lowest |
| 1.00 | OD155212/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete
levelling course by using departmental rubble including packing to compactness to lines and levels,
Labour charges etc. complete as per direction of Departmental officers at site | 20.48 | cum | 1,650 ₹33,783.75 Lowest |
| 1.01 | 5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more | 110 | kilogram | 104.93 ₹11,542.3 Lowest |
| 1.01 | 4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded
stone aggregate 40 mm nominal size derived from natural sources) | 32.55 | cum | 7,500 ₹2,44,125 Lowest |
| 1.01 | 50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete | 385 | kg | 153 ₹58,905 Lowest |
| 1.01 | 13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing | 56.7 | sqm | 373 ₹21,149.1 Lowest |
Tender Value
₹8.5 L
EMD Value
₹21,171
Closing Date
18 Oct 2025, 5:00 pmClosed
Executive engineer
Office of the executive engineer LSGD Wayanad DP Kalpetta North
Annual Plan-Wayanad DP - 2025-26 - Pr No. 462/26 - GHSS Kakkavayal Maintenance - Muttil GP-1000000/--General Civil Work
2025_LSGD_807710_60
D2-2374/2025(6)
Open Tender
Civil Works - Buildings
Item Rate
270 days
Kalpetta
Please prefer in tender documents
7 documents required · 7 mandatory
₹1,870
Yes
₹21,171
Yes
15 Sept 2026
10 Oct 2025
21 Oct 2025
10 Oct 2025
18 Oct 2025
10 Oct 2025
Amount
SIDE PROTECTION WALL
15.7.4:Demolishing brick work manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-Charge.In cement mortar
15.9.1:Demolishing stone rubble masonry manually / by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer -in- Charges:In Lime Mortar
2.8.1:Earth work in excavation by mechanical means (Hydraulic excavator) /manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan), including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.All kinds of soil
OD154179/2025-2026:DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course masonry with good quality blasted rubble including packing to compactness to lines and levels cost and conveyance of all materials labour charges etc. complete as per direction of Departmental officers at site
OD155212/2025-2026:DR with Departmental. Stone - DRY RUBBLE MASONRY _ Dry rubble without concrete levelling course by using departmental rubble including packing to compactness to lines and levels, Labour charges etc. complete as per direction of Departmental officers at site
5.22.6:Steel reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete upto plinth levelThermo - Mechanically Treated bars of grade Fe-500D or more
4.1.4:Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources)
50.10.2:Steel work for purlin/single section with G I pipes including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete
13.33.1:Pointing on stone work with cement mortar 1:3 ( 1 cement : 3 fine sand):Flush/ Ruled pointing
OD154277/2025-2026: laying 60 mm thick factory made cement concrete interlocking paver block of M - 30 grade made by block making machine with strong vibratory compaction, of approved size, design & shape, laid in required colour and pattern over and including 50 mm thick compacted bed of coarse sand, filling the joints with fine sand etc. all complete as per the direction of Engineer-in-charge.
13.71:Lettering with black Japan pint of approved brand and manufacture
Bidder Name
Sulthan Bathery Labour Contract and Construction Co.Operative Societey Ltd.
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1347517.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.78 MB
Tendernotice_2.pdf
PDF • 0.07 MB
Tendernotice_3.pdf
PDF • 0.25 MB
Tendernotice_4.pdf
PDF • 0.14 MB
Tendernotice_5.pdf
PDF • 0.07 MB
Tendernotice_6.pdf
PDF • 0.10 MB
BOQ_1347517.xls
BOQ • 0.30 MB
viewsbd_merged.pdf
Tender Documents • 1.97 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .