| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹59.8 LAccepted-Finance | ₹59.8 L | L-1 | Accepted-Finance LOW RATE |
| 2 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-The tenderer did not put the tender in the tender box as per the terms and conditions of the tender. |
| 3 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-
The tenderer did not put the tender in the tender box as per the terms and conditions of the tender. |
| 4 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-
The tenderer did not put the tender in the tender box as per the terms and conditions of the tender. |
| 5 | Not Admitted-Fee/PreQual/Technical/Finance | - | - | Not Admitted-Fee/PreQual/Technical/Finance Others-
The tenderer did not put the tender in the tender box as per the terms and conditions of the tender. |
Tender Value
Refer Docs
EMD Value
₹1.2 L
Closing Date
4 Dec 2024, 11:00 amClosed
EE RWD NAINITAL
EE RWD NAINITAL VIKAS BHAWAN BHIMTAL
Construction work for vehicle parking in the hospital of Community Health Center Bhimtal
2024_RES_78138_1
1803/RWD/2024-25 DT 23-11-2024
Open Tender
Civil Works
Item Rate
270 days
BHIMTAL
Please refer Tender documents.
1 document required · 1 mandatory
₹4,720
RS 4000 PAID TO DEP HED 0515
₹1.2 L
4 Dec 2024
23 Nov 2024
4 Dec 2024
23 Nov 2024
4 Dec 2024
23 Nov 2024
Amount
Earth work in excavation in foundation trenches or drains including dressing of sides and ramming of bottoms , lifts up to 1.5 m , including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. excavation in all kind of soil.
Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge.
Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.15.7.4 In cement mortar
Demolishing stone rubble masonry manually/ by mechanical means including stacking of serviceable material and disposal ofunserviceable material within 50 metres lead as per direction of engineer-in-charge :
Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge. 15.2.1 Nominal concrete 1:3:6 or richer mix (i/c equivalent designmix)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size).
Filling earth (excluding rock) in trenches, plinth,sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering,lead up to 50 m and lift upto 1.5 m.
Supplying and filling in plinth with Jamuna sand/ (Local Sand) under floors including, watering, ramming consolidating and dressing complete.
Brick work with F.P.S. bricks of class designation 75 in foundation and plinth in: Cement mortar 1:6 (1 cement : 6 coarse sand).
Providing and laying in position reinforced cement concrete of specified grade excluding the cost of centering shuttering, finishing and reinforcement- all works up to plinth level-in 1:1.5:3 ( 1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominial size)
Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 5.2.2 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size)
Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size).
Reinforcement for RCC work including straightening, cutting, bending,placing in position and binding all complete. In Thermo Mechanicallt Treated bars.
Centering and shuttering including strutting , ropping etc and removal of form for Foundations, footings, bases of columns, etc. for mass concrete
Centering and shuttering including strutting , ropping etc and removal of form for Columns, Pillars, Piers, Abutments, Posts and Struts.
Centering and shuttering including strutting , ropping etc and removal of form for suspended floors, roofs, landing, balconies and access platform.
6 mm cement plaster of mix 1:6 ( 1 cement :6 fine sand)
13.26 Providing and applying plaster of paris putty of 2 mm thickness over plastered surface to prepare the surface even and smooth complete.
Finishing walls with Acrylic Smooth exterior paint of required shade :13.46.1 New work (Two or more coat applied @ 1.67 ltr/10 sqm over and including priming coat of exterior primer applied @ 2.20 kg/10 sqm)
Providing and laying factory made chamfered edge Cement Concrete paver blocks in footpath, parks, lawns, drive ways or light traffic parking etc, of required strength, thickness & size/ shape, made by table vibratory method using PU mould, laid in required colour & pattern over 50mm thick compacted bed of sand, compacting and proper embedding/laying of inter locking paver blocks into the sand bedding layer through vibratory compaction by using plate vibrator, filling the joints with sand and cutting of paver blocks as per required size and pattern, finishing and sweeping extra sand. complete all as per direction of Engineer-in-Charge.16.91.2 80 mm thick C.C. paver block of M-30 grade with approved color design and pattern.
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.2.6.1
Disposal of moorum/building rubbish/ malba/ similar unserviceable, dismantled or waste material by mechanical transportincluding loading, transporting, unloading to approved municipal dumping ground for lead upto 10 km for all lifts, completeas per directions of Engineer-in-charge.
Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
finance_93273.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .