| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.3 LAccepted-AOC | L1 | Accepted-AOC Being L1 | |
| 2 | L2₹36.1 L+₹3.9 L (11.9%)Rejected-AOC | L2 | Rejected-AOC Not Being L1 | |
| 3 | L3₹36.9 L+₹4.6 L (14.2%)Rejected-AOC | L3 | Rejected-AOC Not Being L1 | |
| 4 | L4₹38.3 L+₹6.0 L (18.5%)Rejected-AOC | L4 | Rejected-AOC Not Being L1 | |
| 5 | L5₹39.1 L+₹6.8 L (21.2%)Rejected-AOC | L5 | Rejected-AOC Not Being L1 |
| Sl No | Description | Qty | Unit | Himagiri Constructions L5 | harshraj and co L4 | Sri Associates L3 | Krithi constructions L1 | SRI VARADA CONSTRUCTIONS L2 |
|---|---|---|---|---|---|---|---|---|
| 1.00 | Excavation over areas, n exc 1.5 m deep and getting out in hard / dense soil complete all as specified and directed. | 18 | Cum | 126 ₹2,268 Lowest | 400 ₹7,200 | 360 ₹6,480 | 250 ₹4,500 | 350 ₹6,300 |
| 2.00 | Excavation over areas, exc 1.5 m and not exc 3.0 m deep and getting out in hard / dense soil complete all as specified and directed. | 9.08 | Cum | 126 ₹1,144.08 Lowest | 500 ₹4,540 | 360 ₹3,268.8 | 350 ₹3,178 | 450 ₹4,086 |
| 3.00 | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in soft/loose soil complete all as specified and directed. | 13.56 | Cum | 225 ₹3,051 Lowest | 400 ₹5,424 | 360 ₹4,881.6 | 375 ₹5,085 | 360 ₹4,881.6 |
| 4.00 | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and directed. | 26.42 | Cum | 99 ₹2,615.58 | 150 ₹3,963 | 90 ₹2,377.8 Lowest | 150 ₹3,963 | 95 ₹2,509.9 |
| 5.00 | Removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and directed. | 14.22 | Cum | 99 ₹1,407.78 | 200 ₹2,844 | 90 ₹1,279.8 Lowest | 150 ₹2,133 | 310 ₹4,408.2 |
| 6.00 | Demolition of brickwork or stone/boulder masonary, built in cement mortar including all plain concrete cement, coping, quoins, arches, pillars, etc including removal of rubbish/ demolished materials out of MD land complete all as specified and directed. | 0.17 | Cum | 333 ₹56.61 | 300 ₹51 Lowest | 360 ₹61.2 | 850 ₹144.5 | 475 ₹80.75 |
| 7.00 | M & L PCC (1:4:8) type D2 (using 40mm graded stone aggregate) as in foundations filling and mass concrete complete all as specified and directed. | 7.38 | Cum | 6,660 ₹49,150.8 | 3,500 ₹25,830 | 4,005 ₹29,556.9 | 2,500 ₹18,450 Lowest | 3,800 ₹28,044 |
| 8.00 | M&L Brick work with sub class `B' bricks straight or curved on plan exc 6.0m mean radius built in CM (1:6) complete all as specified and directed. | 18.32 | Cum | 8,820 ₹1,61,582.4 | 7,000 ₹1,28,240 | 8,100 ₹1,48,392 | 2,200 ₹40,304 Lowest | 6,500 ₹1,19,080 |
| 9.00 | M & L Brickwork with sub class ‘B’ bricks in one brick thick honey comb walling, built in CM (1:3) complete all as specified and directed . | 7 | Sqm | 1,233 ₹8,631 | 900 ₹6,300 | 810 ₹5,670 | 450 ₹3,150 Lowest | 1,495 ₹10,465 |
| 10.00 | M&L RCC M-25 Design mix (using 20mm graded stone aggregate) as in foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and directed | 9.15 | Cum | 8,100 ₹74,115 | 10,000 ₹91,500 | 8,100 ₹74,115 | 4,500 ₹41,175 Lowest | 5,800 ₹53,070 |
Tender Value
₹38.7 L
EMD Value
₹77,400
Closing Date
15 Apr 2026, 6:00 pmClosed
Shri Rajesh Kumar Meena, GE
Garrison Engineer North 35 Allenby Lines Secunderabad 500087
PROVN OF KOWKOOR GATE UNDER AGE BR (N) NO I OF GE (N) SECUNDERABAD
2026_MES_757761_1
8018
Open Tender
Civil Works
Item Rate
180 days
Garrison Engineer North Secunderabad
Please refer Tender documents.
7 documents required · 7 mandatory
₹500
GARRISON ENGINEER NORTH SECUNDERABAD
₹77,400
Yes
9 Jun 2026
25 Mar 2026
22 Apr 2026
25 Mar 2026
15 Apr 2026
8 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| - | Excavation over areas, n exc 1.5 m deep and getting out in hard / dense soil complete all as specified and directed. | - | Cum | - | - |
| - | Excavation over areas, exc 1.5 m and not exc 3.0 m deep and getting out in hard / dense soil complete all as specified and directed. | - | Cum | - | - |
| - | Excavating in trenches, n exc 1.5 m wide and n exc 1.5 m in depth; for foundation, etc. or for shafts, wells, cesspits, manholes, pier holes, etc. n exc 10 sq m on plan and n exc 1.5 m in depth and getting out in soft/loose soil complete all as specified and directed. | - | Cum | - | - |
| - | Returning, filling in, including spreading, levelling, watering and well ramming in layers not exc 25 cm complete all as specified and directed. | - | Cum | - | - |
| - | Removing excavated material n exc. 50m and depositing where directed at a level n exc. 1.5 m above the starting point complete all as specified and directed. | - | Cum | - | - |
| - | Demolition of brickwork or stone/boulder masonary, built in cement mortar including all plain concrete cement, coping, quoins, arches, pillars, etc including removal of rubbish/ demolished materials out of MD land complete all as specified and directed. | - | Cum | - | - |
| - | M & L PCC (1:4:8) type D2 (using 40mm graded stone aggregate) as in foundations filling and mass concrete complete all as specified and directed. | - | Cum | - | - |
| - | M&L Brick work with sub class `B' bricks straight or curved on plan exc 6.0m mean radius built in CM (1:6) complete all as specified and directed. | - | Cum | - | - |
| - | M & L Brickwork with sub class ‘B’ bricks in one brick thick honey comb walling, built in CM (1:3) complete all as specified and directed . | - | Sqm | - | - |
| - | M&L RCC M-25 Design mix (using 20mm graded stone aggregate) as in foundations, including rafts, footings, foundation beams; plinth beams; bases for columns, etc.; basement slabs, under-reamed piles and mass concrete complete all as specified and directed | - | Cum | - | - |
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.58 MB
BOQ_848784.xls
BOQ • 1.54 MB
tender8018.pdf
Tender Documents • 1.61 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .