Tender Value
₹10.5 L
EMD Value
₹10,473
Closing Date
15 Jun 2026, 10:00 am5d left
Sr. Executive Engineer
Electrical Division HPSEBL, GHumarwin.
Tender for Prov. SOP to HP Shiva Cluster site at Koserian by providing 25 KVA, 11/0.4 KV S/Stn. along with HT and LT line in (E) section Talai under ESD HPSEBL, Talai.
2026_HPSEB_136065_1
NIT-22/2026-27
Open Tender
Electrical Works
15 days
Ghumarwin
Please refer Tender documents.
4 documents required · 4 mandatory
₹590
₹10,473
8 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
15 Jun 2026
8 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1Erection of 63 KVA ,11/.4 KV Sub-Station | ||||||
| 0.000 | Digging of pits for poles(size1800x1200x1500mm), stay set (size 900x 700x 1900mm), Earthing set (2 Mtr. Dia & 3 Mtr. Depth),drilling of holes in poles and x-arms, preparation of plateform str. Members, CI, AI x-arms and x-bracing set, erection of double poles with RCC muff, erection of plate form,X-Arms , dropout fuse unit, lightening arrestor, MCCB, Switch L.T. Box, energy meters etc,erection of transformers, porviding earthing connection to G.O. Switch & erection of G.O Switch, transformer lightining arrester etc., erection of stay set, erection of 25 KVA, 11/.4KV sub station, filling and ramming of pits, erection of jumpers, pipe earthing, LT cable, and fixing of barbed wire and painting of sub-station structure etc. complete in all respect. | 1 | Job | - | - | item 1 |
| 0.000 | Mannual carriage of 25 KVA, 11/.4 KV Sub-station alongwith material for an avrage lead of 0.100 KM from road head to site of work. Km (Rate to be quoted for 1 KM lead only) | 1 | KM | - | - | item 2 |
| 0.000 | Erection of HT Line | - | - | - | - | - |
| 0.999 | Erection of HT steel tubular pole 11 mtr. Long (Double pole structure):-Digging of pit for poles, drilling of holes in poles and X-arms and X-bracing set,fixing of insulators,X-arms and X-bracing set,erection of poles, fixing of barbed wire,danger plate, filling of pit and ramming .painting of poles erection of muff etc complete in all respect. | 2 | No. | - | - | item 3 |
| 0.000 | Erection of HT steel tubular pole 11 mtr. Long (Triple pole structure):-Digging of pit for poles, drilling of holes in poles and X-arms and X-bracing set,fixing of insulators,X-arms and X-bracing set,erection of poles, fixing of barbed wire,danger plate, filling of pit and ramming .painting of poles erection of muff etc complete in all respect. | 1 | No. | - | - | item 4 |
| 0.999 | Stay set (HT):- Digging of pit (size 0.9x0.7x1.5 M),fixing of stay rod, filling and ramming of pit, nozzelling and tightening etc. complete in all respect. | 19 | Set | - | - | item 5 |
| 0.000 | Earthing set (HT):- Digging of pit (0.9x0.7 x1.5m), fixing of G.I wire to earth system, filling and ramming of pit, etc. complete in all respect. | 7 | Set | - | - | item 6 |
| 0.999 | Laying, stringing and sgging of AAAC/ACSR 80 mm, (3 wire) of 11 KV HT line:-Laying of conductor, stringing and sagging, binding with insulator, making jumpers on dead poles etc., complete in all respect.(Rate to be quoted per Km per wire) | - | KM | - | - | item 7 |
| 0.000 | Laying, stringing and sgging of G.I. wire,(1 wire) of 11 KV HT line:-Laying of G.I.Wire, stringing and sagging, binding with insulator, making jumpers on dead poles etc., complete in all respect.(Rate to be quoted per Km line) | - | KM | - | - | item 8 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.57 MB
BOQ_201421.xls
BOQ • 0.40 MB
Biddocument21to25.pdf
Tender Documents • 0.39 MB
Download all tender documents and submit your bid