Tender Value
₹47.0 L
EMD Value
₹47,100
Closing Date
25 Mar 2026, 6:00 pmClosed
Similar tender results from the same govt authority in the past 3 years.
Executive Engineer Medium Irrigation Project Division, Ankleshwar
Providing consultancy services for the construction of a series of check dams across rivers and kotar in Netrang and Valia Talukas of Bharuch District.
284428
14 of 2025-26
Open
Consultancy Services
Bharuch
8 documents required · 8 mandatory
₹1,500
Yes
Executive Engineer, Medium Irrigation Project Division, Ankleshwar
₹47,100
Yes
9 Mar 2026
9 Mar 2026
9 Mar 2026
25 Mar 2026
9 Mar 2026
BILL OF QUANTITIES
Providing consultancy services for the construction of a series of check dams across rivers and
kotar in Netrang and Valia Talukas of Bharuch District.
Item Description of Item (with brief specification and Rate In
Quantity Unit Amount
No reference to book of specifications) figures
Carrying out Pre-Feasibility Studies for the proposed big
check dams, each having a minimum body wall length of
15.00 meters, across various rivers and nalas located in
Jaghadiya, Netrang and Valia talukas of Bharuch District.
Carrying out detailed topographical survey for the proposed
Check Dam using Total Station/DGPS, including taking cross
sections and longitudinal section profiles at 30 m intervals on
straight reaches, 10 m on curves, and 10 m cross sections
along the proposed alignment covering at least 500 m
downstream and 1500 m upstream. Preparing detailed plan
showing all features such as check dam dimensions, side
roads, electric poles, structures, existing wells, and
boundaries; preparing and plotting L.S., C.S., Index Map, and
Contour Map at 1.0 m interval; marking existing and
proposed check dam location on the latest village map;
preparing level sheets with necessary calculations; fixing two
(2) permanent B.M.s; and including all charges for
transportation, labour, data processing, plotting, and
submission of drawings in soft copy and three (3) hard copies
as directed by the Engineer-in-Charge.
Carrying out Sub soil investigation for Soil Bearing Capacity
test with machine drilling of bore holes at specified location
3 including collection of samples, laboratory testing, 360.00 Rmt 8221.50
submitting report including transport and others. (Unit Rate
carried out for 10 m. depth of Bore)
Preparing hydraulic and structural design of the proposed
Check Dam as per relevant codal provisions with prescribed
checklist, including preparation of catchment area drawing of
the proposed site at F.R.L, H.F.L, and A.H.F.L levels, obtaining
approval from the concerned authority, and submission of
the same in the required format. The work includes all
charges for transportation, labour, data preparation, design
computation, and submission of drawings and reports
complete shall include one soft copy and three (3) hard
copies as directed by the Engineer-in-Charge.
Preparing detailed estimate and Draft Tender Paper (DTP)
for the proposed Check Dam, including preparation,
submission, and obtaining approval from the concerned
5 authority. The work includes all charges for data compilation, 10.00 Nos. 25000.00
documentation and other incidental expenses, complete shall
include one soft copy and three (3) hard copies as directed
by the Engineer-in-Charge.
I/We am/are willing to carry out the work at…….. % above/below percent(Should be written in figures and words) of
the estimated rate mentioned above. Amount of my /our tender works out as under.
Estimated amount put to tender Estimated amount put to tender
Deduct………% below Add………% Above
In words In words
The Contractor shall exhibit a board with brief details of work as directed by the Engineer-In-Charge for which
no extra payment shall be made.
2 The labour cess will be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per Govt. G.R. NO.:
MIS102010/17/K1 Dated:30/07/2018 as stated in S.O.R. therefore in R.C.C. items where there is a change as per
actual mix design the cost of difference of cement consumption have been deducted from the rate of original item
at the rate of input rate mentioned in all the tender.
Signature of Contractor Executive Engineer
Medium Irrigation Project Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
BOQ checkdam.pdf
SBD.pdf
Tech Specification.pdf
Download all tender documents and submit your bid