The Executive Engineer City-I (East) Bilaspur
Estimate for replacement of 07 nos. damaged 11kv AB switches at various location under sirgitti zone of EE City Dn.-1 CSPDCL Bilaspur. Estimate for replacement of detorinted 11 AB cable to ACSR conductor at various location due to aging effect under sirgitti zone of City Dn.-1 CSPDCL Bilaspur. B43028260106 B43028260375 B43028260227 B43028260228
108841
EE/CITY DN - I /BSP/2026-27/ T-29
Bilaspur, Chhattisgarh
12 Oct 2026
12 Oct 2026
1 Nov 2026
Materials for ab switch Estimate for replacement of 07 nos. damaged 11kv AB switches at various location under sirgitti zone of EE City Dn.-1 CSPDCL Bilaspur.
1908/27.08.2026 124,092.33 WITH GST WITHOUT GST
S.NO B43028260106 QTY UNIT GST+RATE TOTAL Ex.RATE TOTAL
1 AB Switch with complete fitting 11 KV 7 NO 10,471.34 73,299.38 8874.02 62118.12
2 ACSR CONDUCTOR 0.05 Sqmm (50 Sqmm Al q) 80 M 60.09 4,807.20 50.92 4073.90
4 M S NUTS AND BOLTS: - 16x40mm 5 KG 86.95 434.75 73.69 368.43
5 M S NUTS AND BOLTS: - 16x160mm 10 KG 84.05 840.5 71.23 712.29
INCIDENTIAL CHARGES 0.075 5289.76
S.NO SERVICES UNIT QTY GST+RATE TOTAL Ex.RATE TOTAL
1 Fixing of 11 kV AB switch complete Set. 7 2230.00 15610.00 1,889.83 13228.81
2 desmentalling charge no 7 500.00 3500.00 423.73 2966.10
3 Transporation charges LS 1 1600.00 1,600.00 1,355.93 1355.93
TENDER AMOUNT 93370.81
Materials for RETURN Estimate for replacement of 07 nos. damaged 11kv AB switches at various location under sirgitti zone of EE City Dn.-1 CSPDCL Bilaspur.
S.NO B43028260375 QTY UNIT GST+RATE TOTAL
MATERIAL RETURNED TO BOARD
Materials for POLE Estimate for replacement of detorinted 11 AB cable to ACSR conductor at various location due to aging effect under sirgitti zone of City Dn.-1 CSPDCL Bilaspur.
1912/27.08.2026 193,494.79 WITH GST WITHOUT GST
S.NO B43028260227 QTY UNIT GST+RATE TOTAL Ex.RATE TOTAL
1 11KV cut point channel paint 6 NO 3,548.55 21,291.30 3007.25 18043.47
2 ACSR CONDUCTOR 0.05 Sqmm (50 Sqmm Al q) 1,530 M 60.09 91,937.70 50.92 77913.31
3 11KV 45KN DISC INSULATOR T&C TYPE (POLYM 24 NO 111.39 2,673.36 94.40 2265.56
4 11 KV Strain hardware fittings. 24 NO 160.75 3,858.00 136.23 3269.49
5 11KV 5KN PIN INSULATOR (POLYMER) 27 NO 139.71 3,772.17 118.40 3196.75
7 M S NUTS AND BOLTS: - 16x40mm 3 KG 86.95 260.85 73.69 221.06
8 M S NUTS AND BOLTS: - 16x65mm 5 KG 85.5 427.5 72.46 362.29
9 M S NUTS AND BOLTS: - 16x140mm 5 KG 84.05 420.25 71.23 356.14
15 RCC Block (with 6mm MS Bar) 0 NO 158 0 133.90 0.00
17 Stay clamp LT/Pair 0 NO 326.97 0 277.09 0.00
18 STAY SET WITHOUT STAY WIRE16mm Paint11KV 0 NO 592.97 0 502.52 0.00
INCIDENTIAL CHARGES 0.075 9243.40
TOTAL 132488.79
S.NO SERVICES UNIT QTY GST+RATE TOTAL Ex.RATE TOTAL
2 Tree cutting Km.
3 Approach Clearance Km.
5 Shifting of materials to pole pits No. 0 68.04 0.00 57.66 0.00
6 Stay pit digging No. 0 324.64 0.00 275.12 0.00
7 Transportation of pole from road side to pole pit for a lead of 1 Km. No. 0 335.83 0.00 284.60 0.00
8 Fixing of LT 5 Pin cross arm with insulator No. 27 81.54 2,201.56 69.10 1865.73
9 Pole erection complete with earthing No. 0 868.97 0.00 736.42 0.00
11 Stay erection complete No. 0 223.89 0.00 189.74 0.00
12 Stringing of line all three conductor Km. 1.53 10367.21 15,861.83 8,785.77 13442.23
16 Transporation charges LS 1 2900.00 2,900.00 2,457.63 2457.63
17 Dismentaling charges ls 1 2000.00 2,000.00 1,694.92 1694.92
TENDER AMOUNT 152085.73
Materials for RETURN Estimate for replacement of detorinted 11 AB cable to ACSR conductor at various location due to aging effect under sirgitti zone of City Dn.-1 CSPDCL Bilaspur.
S.NO B43028260228 QTY UNIT GST+RATE TOTAL
MATERIAL RETURNED TO BOARD
1 CAST IRON SCRAP 0 KG 39.11 0
2 ALUMINIUM SCRAP 80.000- KG 150 -12000
TOTAL BILL OF QUANTITY FOR MATERIAL TO BE PROVIDED BY THE CONTRACTOR
S.No Name of Work Estimate No. Work Order & Date Estimate Amount Tender Amount Diff Amount (E-H)
Material Services Total (F+G)
A B C D E F G H I
1 Estimate for replacement of 07 nos. damaged 11kv AB switches at various location under sirgitti zone of EE City Dn.-1 CSPDCL Bilaspur. B43028260106 1908/27.08.2026 124,092.33 75,819.96 17,550.85 93371 30,721.52
4 Estimate for replacement of detorinted 11 AB cable to ACSR conductor at various location due to aging effect under sirgitti zone of City Dn.-1 CSPDCL Bilaspur. B43028260227 1912/27.08.2026 193,494.79 132,488.79 19,596.94 152086 41,409.06
MATERIAL RETURNED TO BOARD
S.NO MATERIALS QTY UNIT GST+RATE TOTAL
3 ALUMINIUM SCRAP Cable -80 KG 150 -12000
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
source.json
RAW_JSON • 0.01 MB
261257-NIT_TD108841.pdf
pdf • 0.55 MB
261258-BOQ_TD108841.xlsx
xlsx • 0.03 MB
261259-TENDER_DOC_TD108841.pdf
pdf • 0.89 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .