Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹28.5 LAccepted-Finance 361 PURBA FULBAGAN FULBAGAN ROAD MAIL 183 EAST PHOOL BAGAN BLOCK F KOLKATA 700086 | KOLKATA | WEST BENGAL | 700086 | L1 | Accepted-Finance ACCEPTED FOR L1 | |
| 2 | L2₹29.3 L+₹82,097.42 (2.88%)Rejected-Finance 6 3 EAST PHOOL BAGAN KOLKATA KOLKATA 700086 | KOLKATA | WEST BENGAL | 700086 | L2 | Rejected-Finance REJECTED | |
| 3 | L3₹29.6 L+₹1.1 L (3.99%)Rejected-Finance 78 RAJA S C MULLICK ROAD BLOCK 2 11A KOLKATA 700084 | KOLKATA | NORTH 24 PARGANAS | WEST BENGAL | 700084 | L3 | Rejected-Finance REJECTED |
Tender Value
₹28.5 L
EMD Value
₹58,000
Closing Date
24 Sept 2026, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
DG/MKT
Office of the D.G. (MARKET DEPARTMENT) Kolkata Municipal Corporation 5, S. N BANERJEE ROAD Kolkata-700 013 West Bengal
DEVELOPMENT OF OFFICE BUILDING AT ORPHANGUNGE MARKET AT WARD 74.
2026_KMC_1040754_1
MC/MKT/ORPHANGUNGE/02/2025-26 (1st call)
Open Tender
CIVIL WORKS
Percentage
150 days
WARD-74
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹58,000
29 Sept 2026
7 Sept 2026
26 Sept 2026
7 Sept 2026
24 Sept 2026
7 Sept 2026
120 days
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC. 1. Dismantling all types of masonry excepting cement concrete plain or reinforced, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m. (a) In ground floor including roof. | 18.75 | M3 | 447 | ₹8,381.25 |
| 2 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 2. Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In ground floor including roof. (a) upto 150 mm. thick | 20.96 | M3 | 939 | ₹19,681.44 |
| 3 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 2. Dismantling all types of plain cement concrete works, stacking serviceable materials at site and removing rubbish as directed within a lead of 75 m In ground floor including roof (b) above 150 mm. thick | 34.83 | M3 | 1,417 | ₹49,354.11 |
| 4 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 3. Dismantling R.C. floor, roof, beams etc including cutting rods and removing rubbish as directed within a lead of 75 m. including stacking of steel bars.(a) In ground floor including roof. | 16.25 | M3 | 1,956 | ₹31,785 |
| 5 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 2. Earth work in excavation of foundation trenches or drains, in all sorts of soil (including mixed soil but excluding laterite or sandstone) including removing, spreading or stacking the spoils within a lead of 75 m. as directed. The item includes necessary trimming the sides of trenches levelling, dressing and ramming the bottom, bailing out water as required complete. (a) Depth of excavation not exceeding 1,500 mm. | 0.07 | %M3 | 11,927 | ₹865.9 |
| 6 | BUILDING WORKS (A) EARTH WORK,ANTITERMITE TREATMENT 3. Earth work in filling in foundation trenches or plinth with good earth, in layers not exceeding 150 mm. including watering and ramming etc. layer by layer complete. (Payment to be made on the basis of measurement of finished quantity of work) (a) With earth obtained from excavation of foundation. | 0.07 | %M3 | 7,754 | ₹562.94 |
| 7 | BUILDING WORKS ( C ) Brickworks,Concrete Works etc A. BRICK WORKS 7. Brick work with 1st class bricks in cement mortar (1:4) (b) In superstructure, ground floor | 7.2 | M3 | 5,798 | ₹41,745.6 |
| 8 | BUILDING WORKS (B) DISMANTLING, CUTTING CHASE, HOLES ETC 10. Stripping off worn out plaster and raking out joints of walls, celings etc. upto any height and in any floor including removing rubbish within a lead of 75m as directed. | 166 | SQM | 19 | ₹3,154 |
| 9 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (b) 15 mm thick plaster | 177 | SQM | 161 | ₹28,497 |
| 10 | SECTION 1. ------------BUILDING WORKS (I) PLASTERING, POINTING ETC. A. ORIGINAL WORKS 1.Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary (Ground floor).[Excluding cost of chipping over concrete surface](ii) With 1:4 cement mortar (a) 20 mm thick plaster | 34.3 | SQM | 186 | ₹6,379.8 |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.51 MB
BOQ_2555953.xls
BOQ • 0.44 MB
Specification.pdf
Tender Documents • 1.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .