Tender Value
₹3.9 Cr
EMD Value
₹7.9 L
Closing Date
24 Apr 2026, 11:00 amClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
Above/Below/Par
SIGNAL
19 conditions · 2 needing a document upload
Provisions of Make in India Policy 2017 issued by Govt. of India, as amended from time to time, shall be followed for consideration of tenders.
As per Clause 14 (i) of Tender Form Second Sheet IRGCC April 2022 (Part-I), The tenderer shall clearly specify whether the tender is submitted on his own (Proprietary Firm) or on behalf of a Partnership Firm / Company / Joint Venture (JV) / Registered Society / Registered Trust / Hindu Undivided Family (HUF) / Limited Liability Partnership (LLP) etc. The tenderer(s) shall enclose the attested copies of the constitution of their concern, and copy of PAN Card along with their tender. Tender Documents in such cases are to be signed by such persons as may be legally competent to sign them on behalf of the firm, company, association, trust or society, as the case may be.
The tenderer has to confirm and submit required document as mentioned in Clause 14(ii)(a) to (g) of Tender Form Second Sheet IRGCC April 2022(PartI).
Tenderer is requested to submit copy of PAN card along with the tender offer.
Tenderer is requested to submit copy of GSTIN Certificate along with the tender offer.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Please refer all attached document and IRGCC April 2022 with all the issued corrections slip.
f tenderer wants to attach any other relevant certificate/documents/information is requested to attach. But please avoid unnecessary attachment of unnecessary documents.
All tenderers are advised to upload clear and readable documents only. If any document is found unreadable then the offer of tenderer may be rejected. Also, it is notable to upload all necessary documents with their quote. If any minimum and compulsory document is not uploaded then their offer may be rejected. However, rejection or acceptance of offer on this ground solely depends on discretion of the tender accepting authority (TAA).
Tenderer is advised to go through IRGCC April 2022 issued by Railway board and Tender documents attached with this tender before quoting their rate. The successful Tenderer(s) shall be required to execute an agreement with Railway for carrying out the work according to Standard General Conditions ofContract, Special Conditions / Specifications annexed to the tender and Standard Specifications (Works and Materials) of Railway as amended/corrected up to latest correction slips, mentioned in tender. Special condition of this tender will be prevail in case of any contradiction.
Tender Committee members for this tender have full right with approval of Tender Accepting Authority to reduce, increase or completely delete any of item or items or even any schedule without taking any consent of the tenderer, if they feels description of any item is confusing or due to abnormally higher rates or due to any other reasons for any item or items or any schedule of this tender.
In case of any contradict wording or any typographical error is found in the tender, interpretation and decision of Railway authority will be final..
ll the Rates are inclusive of GST and the tenderer has to quote their rate inclusive of GST only. This tender is bound with existing taxation rules.
Comprehensive Annual Maintenance Contract of 131 nos. Datalogger, 06 (six) Nos. Front End Processor (FEP) & 141 Nos. Remote Terminal Unit at various Goomty/gate lodge/IBH (Efftronics Make) for a period of 03 (three) years in Adra Division of South Eastern Railway.
SnT_e_Tender_ADA_26_27_03
SnT_e_Tender_ADA_26_27_03
Single
Works - General
36 Months
Purulia, West Bengal
₹0
₹7.9 L
24 Apr 2026
16 Apr 2026
16 Apr 2026
13 items across 1 schedule
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| — | — | — | 3,94,81,031.59 | ||
| Station Month | Per per | — | — | ||
| AMC Charge for Microprocessor based Data Logger System of 512 Digital and 32 Analog input, Charger and Communication interface (Modem). (59 qty x 60 month=3540 month) | — | — | — | 1,00,68,864.48 | |
| Station Month | Per per | — | — | ||
| AMC Charge for Microprocessor based Data Logger System of 1024 digital and 32 analog input, Charger and Communication interface (Modem). (i.) 45 Qty x 60 month= 2700 month ; (ii) 3 Qty x 59 month= 177 month ; (iii) 6 Qty x 58 month= 348 month ; (iv) 1 Qty x 57 month= 57 month ; (v) 5 Qty x 56 month= 280 month ; (vi)3 Qty x 55 month= 165 month ; (vii)1 Qty x 53 month= 53 month | — | — | — | 1,57,97,715.12 | |
| Station Month | Per per | — | — | ||
| AMC Charge for Microprocessor based Data Logger System of 1536 digital and 32 analog input, Charger and Communication interface (Modem). (i.) 4 Qty x 60 month= 240 month (ii) 1 Qty x 59 month= 59 month (iii) 1 Qty x 56 month= 56 month | — | — | — | 17,73,579.49 | |
| Station Month | Per per | — | — | ||
| AMC Charge for Microprocessor based Data Logger System of 2048 digital and 32 analog input, Charger and Communication interface (Modem). (i) 1 Qty x 60 month= 60 month ; (ii) 1 Qty x 54 month= 54 month | — | — | — | 5,05,478.82 | |
| Station Month | Per per | — | — | ||
| AMC Charge for Front End Processor (FEP) with Charger and modem. [ (i) 4 Qty x 60 month= 240 month ; (ii) 2 Qty x 54 month= 108 month] | — | — | — | 4,05,831.48 | |
| Annual Maintenance of Remote Terminal Unit (RTU)of 128 Digital & 16 Analog inputs in Adra Division. Total 127 Nos RTU. | — | — | — | 99,91,603.08 | |
| Annual Maintenance of Remote Terminal Unit (RTU)of 64 Digital & 16 Analog inputs in Adra Division. Total 14 Nos RTU. | — | — | — | 9,37,959.12 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
IRGCC APRIL 2022
ATTACHMENT
IRGCC2022ACS-1.pdf
ATTACHMENT
ListofRTU.pdf
ATTACHMENT
ListofDatalogger.pdf
ATTACHMENT
IRGCCApril2022ACS_326APR2023.pdf IRGCC April 2022 ACS_3 26APR2023
ATTACHMENT
IRGCCApril2022ACS_213DEC2022.pdf IRGCC April 2022 ACS_2 13DEC2022
ATTACHMENT
IRGCCApril2022ACS_10-4MAR25.pdf
ATTACHMENT
IRGCCApril2022ACS_407AUG23.pdf
ATTACHMENT
IRGCCApril2022ACS_213DEC2022.pdf
ATTACHMENT
IRGCC_April-2022_2022_CE-I_CT_GCC-2022_POLICY_27.04.22.pdf
ATTACHMENT
IRGCCApril2022ACS_326APR2023.pdf
ATTACHMENT
IRGCCApril2022ACS_520OCT2023.pdf
ATTACHMENT
SCCAMCDATALOGGER1_1.pdf
ATTACHMENT
IRGCCApril2022ACS_621DEC2023.pdf
ATTACHMENT
IRGCCApril2022ACS_725NOV2024.pdf
ATTACHMENT
IRGCCApril2022ACS_8-20DEC24.pdf
ATTACHMENT
IRGCCApril2022ACS_9-9JAN25.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .