| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹32.4 LAccepted-AOC NARIKULAM HOUSE KANJOOR KANJOOR ERNAKULAM DISTRICT | KANJOOR | ERNAKULAM | KERALA | L1 | Accepted-AOC 1st Lowest | |
| 2 | L2₹37.5 L+₹5.1 L (15.8%)Accepted-AOC | L2 | Accepted-AOC 2nd Lowest | |
| 3 | L3₹37.9 L+₹5.4 L (16.8%)Rejected-Finance | L3 | Rejected-Finance Third Lowest | |
| 4 | L4₹49.8 L+₹17.4 L (53.5%)Rejected-Finance | L4 | Rejected-Finance Forth Lowest |
Tender Value
₹53.2 L
EMD Value
₹1.3 L
Closing Date
27 Jun 2020, 6:00 pmClosed
Executive Engineer
Executive Engineer, Minor Irrigation Division, 4th Floor, Civil Station, Kakkanad, Ernakulam Pin682030.
SDRF-Cleaning and desilting of different thods
2020_Irrig_366899_1
EE/MIDVN/EKM/09/ET/2020-21/S Tender
Open Tender
Civil Works - Others
Item Rate
60 days
Paravoor
Please refer Tender documents.
7 documents required · 7 mandatory
₹3,304
Yes
online
₹1.3 L
Yes
20 Aug 2020
23 Jun 2020
29 Jun 2020
23 Jun 2020
27 Jun 2020
23 Jun 2020
Amount
Scheme 1 River mouth at Chathedam- gothuruth ferry to kurumbathuruth
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 2 ferry to kurumbathuruth thodu
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 3 kurumbathuruthu thodu portion
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 4 kurumbathuruth thodu portion
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 5thodu joins periyar at end of CP thurth
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 6 thodu joining periyar at end of CP thuruth
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 7 thodu starts from periyar before CP thuruth
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 8 at thodu starts from periyar before CP thuruth
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 9 thodu joins near maliankara bridge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 10 thodu joins near maliankara bridge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
scheme 11 thodu joins near maliankara bridge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 12 thodu joins near maliankara bridge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 13 thekkethuruth thodu joins NWW near maliankara bridge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 14 thekkethuruth thodu joins NWW near maliankara bridge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 15 Thekkethuruth thodu joins NWW near maliankara bridge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 16 Thekkethuruth thodu joins NWW near Maliankara bridge
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 17 thodu joins NWW near Pattanam
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 18 thodu joins NWW near pattanam
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 19 thodu joins NWW near pattanam
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 20 thodu joins NWW near pattanam
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 21 Paravur thodu joins NWW near Kalluchira
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 22 Paravur thodu joins NWW at Kalluchira
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 23 Paravur thodu joins NWW at Kalluchira
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 24 Paravur thodu joins NWW at Kalluchira
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 25 Starting point of Thekkethuruth thodu from Periyar
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 26 starting of Thekkethuruth thodu
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 27 starting of Thekkethuruth thodu
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 28 starting of Thekkethuruth thodu
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 29 thodu joins periyar near malavana para
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 30 thodu joins periyar near malavana para
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 31 thodu joins periyar near malavana para
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 32 thodu joins periyar near malavana para
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 33 Chalakkudy puzha &branch thodu joining Periyar
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 34 Chalakkudy puzha &branch thodu joining Periyar
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 35 Chalakkudy puzha &branch thodu joining Periyar
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 36 Chalakkudy puzha &branch thodu joining Periyar
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 37 Chalakkudy puzha &branch thodu joining Periyar
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 38 Chalakkudy puzha &branch thodu joining Periyar
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 39 opening between main land & satar island D/s side
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
Scheme 40 opening between main land & satar island U/S side
2.6.1 : Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead up to 50 m and lift up to 1.5 m, disposed earth to be levelled and neatly dressed.All kinds of soil .The Desilted materials should be deposited in low lying area as per the direction of departmental officer's at site in such a way that wont fall back in to the thodu due to rain and the excess should be disposed away from the site at contractor's own conveyance after ascertaining the sand content in a recognized laboratary or Engineering College Lab, the cost of which will be deducted from bill.
K S Bigili
M.P Salim Pwd Contractor
TBAS CONSTRUCTIONS
Bidder Name
DAISY JOSE
M.P Salim Pwd Contractor
K S Bigili
TBAS CONSTRUCTIONS
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_518576.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .